Processing, Please wait...

  • Home
  • About Us
  • Search:
  • Advanced Search

Growing Science » Journal of Project Management » Impacts of change management on risk and cost management of a construction projects

Journals

  • IJIEC (726)
  • MSL (2637)
  • DSL (649)
  • CCL (495)
  • USCM (1092)
  • ESM (404)
  • AC (557)
  • JPM (247)
  • IJDS (912)
  • JFS (91)
  • HE (21)

JPM Volumes

    • Volume 1 (8)
      • Issue 1 (5)
      • Issue 2 (3)
    • Volume 2 (13)
      • Issue 1 (4)
      • Issue 2 (3)
      • Issue 3 (3)
      • Issue 4 (3)
    • Volume 3 (17)
      • Issue 1 (4)
      • Issue 2 (5)
      • Issue 3 (4)
      • Issue 4 (4)
    • Volume 4 (24)
      • Issue 1 (4)
      • Issue 2 (8)
      • Issue 3 (8)
      • Issue 4 (4)
    • Volume 5 (20)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • Volume 6 (20)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • Volume 7 (21)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (6)
    • Volume 8 (21)
      • Issue 1 (6)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • Volume 9 (35)
      • Issue 1 (6)
      • Issue 2 (5)
      • Issue 3 (9)
      • Issue 4 (15)
    • Volume 10 (68)
      • Issue 1 (15)
      • Issue 2 (21)
      • Issue 3 (13)
      • Issue 4 (19)

Keywords

Jordan(161)
Supply chain management(160)
Vietnam(148)
Customer satisfaction(120)
Performance(113)
Supply chain(108)
Service quality(98)
Tehran Stock Exchange(94)
Competitive advantage(93)
SMEs(86)
optimization(84)
Financial performance(83)
Trust(81)
Job satisfaction(79)
Social media(78)
Factor analysis(78)
TOPSIS(78)
Knowledge Management(77)
Genetic Algorithm(76)
Sustainability(76)


» Show all keywords

Authors

Naser Azad(82)
Mohammad Reza Iravani(64)
Zeplin Jiwa Husada Tarigan(59)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(39)
Jumadil Saputra(36)
Muhammad Turki Alshurideh(35)
Dmaithan Almajali(35)
Barween Al Kurdi(32)
Basrowi Basrowi(31)
Hassan Ghodrati(31)
Ahmad Makui(31)
Mohammad Khodaei Valahzaghard(30)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)
Sautma Ronni Basana(27)
Haitham M. Alzoubi(27)


» Show all authors

Countries

Iran(2162)
Indonesia(1276)
Jordan(783)
India(779)
Vietnam(500)
Saudi Arabia(438)
Malaysia(438)
United Arab Emirates(220)
China(181)
Thailand(151)
United States(109)
Turkey(102)
Ukraine(99)
Egypt(95)
Canada(89)
Pakistan(84)
Peru(83)
United Kingdom(77)
Nigeria(77)
Morocco(73)


» Show all countries

Journal of Project Management

ISSN 2371-8374 (Online) - ISSN 2371-8366 (Print)
Quarterly Publication
Volume 4 Issue 2 pp. 157-164 , 2019

Impacts of change management on risk and cost management of a construction projects Pages 157-164 Right click to download the paper Download PDF

Authors: Mohamed Ibrahim Khalifa Halou, Razali Samin, Mushtaq Ahmad

DOI: 10.5267/j.jpm.2019.1.005

Keywords: Construction Projects, Change Management, Cost Management, Risk Management

Abstract: Construction projects are always problematic and difficult to manage in certain stages. Management in construction industry has been characterized as being weak, insufficient, nebulous, backward and slow to react against changing conditions. This study aims to identify risk and cost managed in the change management of the construction projects. Quantitative study is organized and questionnaire as an instrument is used to collect the information from the construction experts in Klang Valley, Malaysia. Random sampling techniques is used to collect the data, 105 questionnaires are distributed and 90 ones are returned. The correlation analysis shows significant relationship between cost, risk and change management. The reliability test indicates satisfactory result to continue the questionnaire where Cronbach coefficient alpha value exceeds the level of 0.70. The study finds that design changes, client and contractor related changes are mostly occurred in change management of construction projects. Tendering on the basis of an incomplete design, which then changes during the course of the construction has been found as the key reason of the changes. Through a paper based exercise, site memorandums (SM), quoted rates (QR), variation orders (VO) and monthly payment certificates (MPC) are the activities managed by the engineers. Proper planning is the most leading change management in the risk management. Implementation of risk man-agement was found the applied risk management in practice to hindrances. Since this is very vast debated subject, the study has recommended further investigation to include consultant firms for better understanding of the design changes leading to the cost and risk associated.

How to cite this paper
Halou, M., Samin, R & Ahmad, M. (2019). Impacts of change management on risk and cost management of a construction projects.Journal of Project Management, 4(2), 157-164.

Refrences
Bakhary, N. A., Adnan, H., & Ibrahim, A. (2015). A study of construction claim management problems in Malaysia. Procedia economics and finance, 23, 63-70.
Butt, A., Naaranoja, M., & Savolainen, J. (2016). Project change stakeholder communication. In-ternational Journal of Project Management, 34(8), 1579-1595.
Clough, R. H., & Sears, G. A. (1986). Construction contracting: Wiley New York. Google Scholar.
Cunningham, T. (2017). What Causes Cost Overruns on Building Projects?-An Overview.
Hanna, A. S., Thomas, G., & Swanson, J. R. (2013). Construction risk identification and alloca-tion: Cooperative approach. Journal of Construction Engineering and Management, 139(9), 1098-1107.
Hao, Q., Shen, W., Neelamkavil, J., & Thomas, R. (2008). Change management in construction projects. Paper presented at the Proceedings of International conference on information tech-nology in construction.
Ibbs, C. W., Kwak, Y. H., Ng, T., & Odabasi, A. M. (2003). Project delivery systems and project change: Quantitative analysis. Journal of Construction Engineering and Management, 129(4), 382-387.
Lee, S., Peña-Mora, F., & Park, M. (2005). Quality and change management model for large scale concurrent design and construction projects. Journal of Construction Engineering and Man-agement, 131(8), 890-902.
Long, N. D., Ogunlana, S., Quang, T., & Lam, K. C. (2004). Large construction projects in devel-oping countries: a case study from Vietnam. International Journal of project manage-ment, 22(7), 553-561.
Mišić, S., & Radujković, M. (2015). Critical drivers of megaprojects success and failure. Procedia Engineering, 122, 71-80.
Motawa, I., Anumba, C., Lee, S., & Peña-Mora, F. (2007). An integrated system for change man-agement in construction. Automation in Construction, 16(3), 368-377.
Murie, F. (2007). Building safety—An international perspective. International Journal of Occupa-tional and Environmental Health, 13(1), 5-11.
Mushtaq Ahmad, A. M. J. A. T. (2018). Safety Management in Construction Projects: Malaysia Context. International Journal of Scientific & Engineering Research, 9(2), 1597-1606.
Osipova, E. (2008). Risk management in construction projects: a comparative study of the different procurement options in Sweden. Luleå tekniska universitet.
Park, M., & Peña‐Mora, F. (2003). Dynamic change management for construction: introducing the change cycle into model‐based project management. System Dynamics Review: The Journal of the System Dynamics Society, 19(3), 213-242.
Radujković, M., & Sjekavica, M. (2017). Project management success factors. Procedia Engineer-ing, 196, 607-615.
Sanchez, H., Robert, B., Bourgault, M., & Pellerin, R. (2009). Risk management applied to pro-jects, programs, and portfolios. International Journal of Managing Projects in Business, 2(1), 14-35.
Serrador, P., & Turner, R. (2015). The relationship between project success and project efficiency. Project Management Journal, 46(1), 30-39.
Williams, T. M. (1999). The need for new paradigms for complex projects. International Journal of Project Management, 17(5), 269-273.
Winch, G. M. (2010). Managing construction projects. John Wiley & Sons. Google Scholar
Yalegama, S., Chileshe, N., & Ma, T. (2016). Critical success factors for community-driven devel-opment projects: A Sri Lankan community perspective. International Journal of Project Man-agement, 34(4), 643-659.
Zhao, Z. Y., Lv, Q. L., Zuo, J., & Zillante, G. (2009). Prediction system for change management in construction project. Journal of Construction Engineering and Management, 136(6), 659-669.
  • 34
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: Journal of Project Management | Year: 2019 | Volume: 4 | Issue: 2 | Views: 7178 | Reviews: 0

Related Articles:
  • The advantage of project risk management tools
  • Diagnosing the success of the construction projects during the initial phas ...
  • Identifying program critical success factors in construction industry
  • Investigating different challenges in construction projects
  • An empirical study for ranking risk factors using linear assignment: A case ...

Add Reviews

Name:*
E-Mail:
Review:
Bold Italic Underline Strike | Align left Center Align right | Insert smilies Insert link URLInsert protected URL Select color | Add Hidden Text Insert Quote Convert selected text from selection to Cyrillic (Russian) alphabet Insert spoiler
winkwinkedsmileam
belayfeelfellowlaughing
lollovenorecourse
requestsadtonguewassat
cryingwhatbullyangry
Security Code: *
Include security image CAPCHA.
Refresh Code

® 2010-2025 GrowingScience.Com