Processing, Please wait...

  • Home
  • About Us
  • Search:
  • Advanced Search

Growing Science » Authors » Mohamed Ibrahim Khalifa Halou

Journals

  • IJIEC (726)
  • MSL (2637)
  • DSL (649)
  • CCL (495)
  • USCM (1092)
  • ESM (404)
  • AC (557)
  • JPM (247)
  • IJDS (912)
  • JFS (91)
  • HE (21)
  • SCI (21)

Keywords

Supply chain management(163)
Jordan(161)
Vietnam(148)
Customer satisfaction(120)
Performance(113)
Supply chain(108)
Service quality(98)
Tehran Stock Exchange(94)
Competitive advantage(93)
SMEs(86)
optimization(84)
Financial performance(83)
Trust(81)
TOPSIS(80)
Job satisfaction(79)
Sustainability(79)
Factor analysis(78)
Social media(78)
Knowledge Management(77)
Genetic Algorithm(76)


» Show all keywords

Authors

Naser Azad(82)
Mohammad Reza Iravani(64)
Zeplin Jiwa Husada Tarigan(60)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(39)
Jumadil Saputra(36)
Dmaithan Almajali(36)
Muhammad Turki Alshurideh(35)
Barween Al Kurdi(32)
Ahmad Makui(32)
Basrowi Basrowi(31)
Hassan Ghodrati(31)
Mohammad Khodaei Valahzaghard(30)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)
Sautma Ronni Basana(27)
Haitham M. Alzoubi(27)


» Show all authors

Countries

Iran(2171)
Indonesia(1277)
Jordan(784)
India(780)
Vietnam(500)
Saudi Arabia(438)
Malaysia(438)
United Arab Emirates(220)
China(181)
Thailand(151)
United States(110)
Turkey(103)
Ukraine(99)
Egypt(95)
Canada(92)
Pakistan(84)
Peru(83)
United Kingdom(79)
Nigeria(77)
Morocco(73)


» Show all countries
Sort articles by: Volume | Date | Most Rates | Most Views | Reviews | Alphabet
1.

Impacts of change management on risk and cost management of a construction projects Pages 157-164 Right click to download the paper Download PDF

Authors: Mohamed Ibrahim Khalifa Halou, Razali Samin, Mushtaq Ahmad

DOI: 10.5267/j.jpm.2019.1.005

Keywords: Construction Projects, Change Management, Cost Management, Risk Management

Abstract:
Construction projects are always problematic and difficult to manage in certain stages. Management in construction industry has been characterized as being weak, insufficient, nebulous, backward and slow to react against changing conditions. This study aims to identify risk and cost managed in the change management of the construction projects. Quantitative study is organized and questionnaire as an instrument is used to collect the information from the construction experts in Klang Valley, Malaysia. Random sampling techniques is used to collect the data, 105 questionnaires are distributed and 90 ones are returned. The correlation analysis shows significant relationship between cost, risk and change management. The reliability test indicates satisfactory result to continue the questionnaire where Cronbach coefficient alpha value exceeds the level of 0.70. The study finds that design changes, client and contractor related changes are mostly occurred in change management of construction projects. Tendering on the basis of an incomplete design, which then changes during the course of the construction has been found as the key reason of the changes. Through a paper based exercise, site memorandums (SM), quoted rates (QR), variation orders (VO) and monthly payment certificates (MPC) are the activities managed by the engineers. Proper planning is the most leading change management in the risk management. Implementation of risk man-agement was found the applied risk management in practice to hindrances. Since this is very vast debated subject, the study has recommended further investigation to include consultant firms for better understanding of the design changes leading to the cost and risk associated.
Details
  • 34
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2019 | Volume: 4 | Issue: 2 | Views: 7198 | Reviews: 0

 

® 2010-2025 GrowingScience.Com