Processing, Please wait...

  • Home
  • About Us
  • Search:
  • Advanced Search

Growing Science » International Journal of Industrial Engineering Computations » Contracts design for serial delivery with connecting time spot: From a perspective of fourth party logistics

Journals

  • IJIEC (777)
  • MSL (2643)
  • DSL (690)
  • CCL (528)
  • USCM (1092)
  • ESM (421)
  • AC (562)
  • JPM (293)
  • IJDS (952)
  • JFS (101)
  • HE (32)
  • SCI (26)

IJIEC Volumes

    • Volume 1 (17)
      • Issue 1 (9)
      • Issue 2 (8)
    • Volume 2 (68)
      • Issue 1 (12)
      • Issue 2 (20)
      • Issue 3 (20)
      • Issue 4 (16)
    • Volume 3 (76)
      • Issue 1 (9)
      • Issue 2 (15)
      • Issue 3 (20)
      • Issue 4 (12)
      • Issue 5 (20)
    • Volume 4 (50)
      • Issue 1 (14)
      • Issue 2 (10)
      • Issue 3 (12)
      • Issue 4 (14)
    • Volume 5 (47)
      • Issue 1 (13)
      • Issue 2 (12)
      • Issue 3 (12)
      • Issue 4 (10)
    • Volume 6 (39)
      • Issue 1 (7)
      • Issue 2 (12)
      • Issue 3 (10)
      • Issue 4 (10)
    • Volume 7 (47)
      • Issue 1 (10)
      • Issue 2 (14)
      • Issue 3 (10)
      • Issue 4 (13)
    • Volume 8 (30)
      • Issue 1 (9)
      • Issue 2 (7)
      • Issue 3 (8)
      • Issue 4 (6)
    • Volume 9 (32)
      • Issue 1 (9)
      • Issue 2 (6)
      • Issue 3 (7)
      • Issue 4 (10)
    • Volume 10 (34)
      • Issue 1 (8)
      • Issue 2 (10)
      • Issue 3 (8)
      • Issue 4 (8)
    • Volume 11 (36)
      • Issue 1 (9)
      • Issue 2 (8)
      • Issue 3 (9)
      • Issue 4 (10)
    • Volume 12 (29)
      • Issue 1 (9)
      • Issue 2 (6)
      • Issue 3 (8)
      • Issue 4 (6)
    • Volume 13 (41)
      • Issue 1 (10)
      • Issue 2 (8)
      • Issue 3 (10)
      • Issue 4 (13)
    • Volume 14 (50)
      • Issue 1 (11)
      • Issue 2 (15)
      • Issue 3 (9)
      • Issue 4 (15)
    • Volume 15 (55)
      • Issue 1 (19)
      • Issue 2 (15)
      • Issue 3 (12)
      • Issue 4 (9)
    • Volume 16 (75)
      • Issue 1 (12)
      • Issue 2 (15)
      • Issue 3 (19)
      • Issue 4 (29)
    • Volume 17 (51)
      • Issue 1 (21)
      • Issue 2 (30)

Keywords

Supply chain management(168)
Jordan(165)
Vietnam(151)
Customer satisfaction(120)
Performance(115)
Supply chain(112)
Service quality(98)
Competitive advantage(97)
Tehran Stock Exchange(94)
SMEs(89)
optimization(87)
Sustainability(86)
Artificial intelligence(85)
Financial performance(84)
Trust(83)
TOPSIS(83)
Job satisfaction(81)
Genetic Algorithm(78)
Factor analysis(78)
Social media(78)


» Show all keywords

Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(66)
Mohammad Reza Iravani(64)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(40)
Dmaithan Almajali(37)
Jumadil Saputra(36)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Barween Al Kurdi(32)
Hassan Ghodrati(31)
Basrowi Basrowi(31)
Sautma Ronni Basana(31)
Mohammad Khodaei Valahzaghard(30)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Haitham M. Alzoubi(28)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)


» Show all authors

Countries

Iran(2192)
Indonesia(1311)
Jordan(813)
India(793)
Vietnam(510)
Saudi Arabia(478)
Malaysia(444)
China(231)
United Arab Emirates(226)
Thailand(160)
United States(114)
Ukraine(110)
Turkey(110)
Egypt(106)
Peru(94)
Canada(93)
Morocco(86)
Pakistan(85)
United Kingdom(80)
Nigeria(78)


» Show all countries

International Journal of Industrial Engineering Computations

ISSN 1923-2934 (Online) - ISSN 1923-2926 (Print)
Quarterly Publication
Volume 13 Issue 4 pp. 523-542 , 2022

Contracts design for serial delivery with connecting time spot: From a perspective of fourth party logistics Pages 523-542 Right click to download the paper Download PDF

Authors: Yang Dong, Xiaohu Qian, Min Huang, Wai-Ki Ching

DOI: 10.5267/j.ijiec.2022.7.003

Keywords: Third-party logistics, Fourth-party logistics, Contract design, Principal-Agent Theory, Connecting time spot

Abstract: For a serial delivery system, the latter 3PL needs to be prepared at the transshipment node in advance to reduce the total delivery time. In this paper, we propose the concept of Connecting Time Spot (CTS) to help 4PL schedule the latter 3PL when to wait at the transshipment node. We study a serial delivery system with a 4PL and two 3PLs, where 4PL designs optimal contracts with two types of CTS (GCTS is derived by system parameter and DCTS is determined by 4PL’s optimization) to induce 3PLs to exert the optimal effort levels. We analyze the effects of CTS on the system profit in the centralized system. For the decentralized system, we particularly investigate the optimal contracts in three penalty modes which are according to the occupancy of the warehouses. The results show that CTS can avoid 3PLs’ idle resources and enhance the system profit for serial delivery both in the centralized system and the decentralized system. Compared with GCTS, DCTS has a better performance in enhancing the system profits. Also, the optimal incentive contracts achieve Pareto improvement for system profits. Interestingly, one 3PL’s delivery penalty mode will not affect the other 3PL’s optimal contracts.

How to cite this paper
Dong, Y., Qian, X., Huang, M & Ching, W. (2022). Contracts design for serial delivery with connecting time spot: From a perspective of fourth party logistics.International Journal of Industrial Engineering Computations , 13(4), 523-542.

Refrences
Adcroft, A., Fulconis, F., Saglietto, L., & Pach, G. (2007). Strategy dynamics in the logistics industry: a transactional center perspective. Management Decision, 45(1), 104-117.
Ali, S. S., Madaan, J., Chan, F. T., & Kannan, S. (2013). Inventory management of perish- able products: a time decay linked logistic approach. International Journal of Production Research, 51(13), 3864-3879.
Badem, D. J., & Mueller, J. K. (1999). New for the millennium–4pl. Transportation & Distribution, 40(2), 78-80.
Benjaafar, S., Elahi, E., & Donohue, L. (2007). Outsourcing via service competition. Management Science, 53(2), 241-259.
Bernstein, F., & de Vericourt, F. (2008). Competition for procurement contracts with service guarantees. Operation Research, 56(3), 562-575.
Bhattacharyya, S., & Lafontaine, F. (1995). Double-sided moral hazard and the nature of share contracts. The RAND Journal of Economics, 26(4), 761-781.
Bollapragada, R., Rao, U. S., & Zhang, J. (2004). Managing two-stage serial inventory systems under demand and supply uncertainty and customer service level requirements. IIE Transactions, 36(1), 73-85.
Chen, B., & Chen, J. (2017). Compete in price or service? A study of personalized pricing and money back guarantees. Journal of Retailing, 93(2), 154-171.
Clinton, S. R. (2008). Importance of technology investments in the logistics service providers: a case study of UPS and its use of online tools. Journal of Applied Business Research (JABR), 24(2), 1354-1369.
Co, H. C., David, I., Feng, P., & Patuwo, E. (2012). A continuous-review model for dual intercontinental and domestic outsourcing. International Journal of Production Research, 50(19), 5460-5473.
Craig, T. (2002). 4pl vs 3pl: a business process outsourcing option for international supply chain management. http: wws/world wide shipping.
Cui, Y., Huang, M., Yang, S., Lee, L. H., & Wang, X. (2013). Fourth party logistics routing problem model with fuzzy duration time and cost discount. Knowledge-Based Systems, 50, 14-24.
Fulconis, F., Saglietto, L., & Pach, G. (2006). Exploring new competences in the logistics industry: the intermediation role of 4PL. In Supply Chain Forum: An International Journal 7(2), 68-77.
Gammelgaard, B., Van Hoek, R., & Stefansson, G. (2006). Collaborative logistics management and the role of thirdparty service providers. International journal of physical distribution & logistics management, 36(2), 76-92.
Gattorna, J., & Jones, T. (Eds.). (1998). Strategic supply chain alignment: best practice in supply chain management. Gower Publishing, Ltd..
Hertz, S., & Alfredsson, M. (2003). Strategic development of third party logistics providers. Industrial marketing management, 32(2), 139-149.
Hoek, R. I., & Chong, I. (2001). Epilogue: UPS logistics practical approaches to the e-supply chain. International Journal of Physical Distribution & Logistics Management, 31(6), 463- 468.
Holmstrom, B. (1982). Moral hazard in teams. The Bell Journal of Economics, 13(2), 324-340.
Hu, Y., & Qiang, Q. (2013). An equilibrium model of online shopping supply chain networks with service capacity investment. Service Science, 5(3), 238-248.
Huang, M., Cui, Y., Yang, S., & Wang, X. (2013). Fourth party logistics routing problem with fuzzy duration time. International Journal of Production Economics, 145(1), 107-116.
Huang, M., Tu, J., Chao, X., & Jin, D. (2019). Quality risk in logistics outsourcing: A fourth party logistics perspective. European Journal of Operational Research, 276(3), 855-879.
Iijima, M., Komatsu, S., & Katoh, S. (1996). Hybrid just-in-time logistics systems and information networks for effective management in perishable food industries. International Journal of Production Economics, 44(1-2), 97-103.
Jain, N., Hasija, S., & Popescu, D. G. (2013). Optimal contracts for outsourcing of repair and restoration services. Operations Research, 61(6), 1295-1311.
Jin, T., & Tian, Y. (2012). Optimizing reliability and service parts logistics for a time varying installed base. European Journal of Operational Research, 218(1), 152-162.
Jin, Y., & Ryan, J. K. (2012). Price and service competition in an outsourced supply chain. Production and Operation Management, 21(2), 331-344
Kant, K., & Pal, A. (2017). Internet of perishable logistics. IEEE Internet Computing, 21(1), 22-31.
Kengpol, A., & Tuammee, S. (2016). The development of a decision support framework for a quantitative risk assessment in multimodal green logistics: an empirical study. International Journal of Production Research, 54(4), 1-19.
Kumar, S. (2008). A study of the supermarket industry and its growing logistics capabilities. International Journal of Retail & Distribution Management, 36(3), 192-211.
Lahiri, A., Dewan, R. M., & Freimer, M. (2013). Pricing of wireless services: Service pricing vs. traffic pricing. Information Systems Research, 24(2), 418-435.
Li, T., Sethi, S. P., & He, X. (2015). Dynamic pricing, production, and channel coordination with stochastic learning. Production and Operations Management, 24(6), 857-882.
Liu, W., Wang, S., Zhu, D., Wang, D., & Shen, X. (2018). Order allocation of logistics service supply chain with fairness concern and demand updating: Model analysis and empirical examination. Annals of Operations Research, 268(1), 177-213.
Lobel, I., & Xiao, W. (2017). Optimal long-term supply contracts with asymmetric demand information. Operations Research, 65(5), 1275-1284.
Logan, M. S. (2000). Using agency theory to design successful outsourcing relationships. The International Journal of Logistics Management, 11(2), 21-32.
Mak, H. Y., Rong, Y., & Zhang, J. (2015). Appointment scheduling with limited distributional information. Management Science, 61(2), 316-334.
Myerson, R. B. (1979). Incentive compatibility and the bargaining problem. Econometrica: journal of the Econometric Society, 47(1), 61-73.
Rezaei-Malek, M., Tavakkoli-Moghaddam, R., Zahiri, B., & Bozorgi-Amiri, A. (2016). An interactive approach for designing a robust disaster relief logistics network with perishable commodities. Computers & Industrial Engineering, 94, 201-215.
Selviaridis, K., & Spring, M. (2007). Third party logistics: a literature review and research agenda. The international journal of logistics management, 18(1), 125-150.
Shang, Y., Dunson, D., & Song, J. S. (2017). Exploiting big data in logistics risk assessment via Bayesian nonparametrics. Operations Research, 65(6), 1574-1588.
Sharif, A. M., Irani, Z., Love, P. E. D., & Kamal, M. M. (2012). Evaluating reverse third-party logistics operations using a semi-fuzzy approach. International Journal of Production Research, 50(9), 2515-2532.
So, K. C. (2000). Price and time competition for service delivery. Manufacturing & Service Operations Management, 2(4), 392-409.
Tsai, M. C., Liao, C. H., & Han, C. S. (2008). Risk perception on logistics outsourcing of retail chains: model development and empirical verification in Taiwan. Supply Chain Management: An International Journal, 13(6), 415-424.
Vaidyanathan, G. (2005). A framework for evaluating third-party logistics. Communications of the ACM, 48(1), 89-94.
Vivaldini, M., Pires, S., & de Souza, F. B. (2008). Collaboration and Competition between 4PL and 3PL: a study of a fast-food supply chain. Journal of Operations and Supply Chain Management, 1(2), 17-29.
Yao, Y., & Zhang, J. (2012). Pricing for shipping services of online retailers: Analytical and empirical approaches. Decision Support Systems, 53(2), 368-380.
  • 0
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: International Journal of Industrial Engineering Computations | Year: 2022 | Volume: 13 | Issue: 4 | Views: 1251 | Reviews: 0

Related Articles:
  • Contract design for the fourth party logistics considering tardiness risk
  • A multi-objective location-inventory model for 3PL providers with sustainab ...
  • Integration of DEMATEL, ANP and DEA methods for third party logistics provi ...
  • Supply chain coordination via a two-part tariff contract with price and sal ...
  • Sourcing and pricing strategies for two retailers in a decentralized supply ...

Add Reviews

Name:*
E-Mail:
Review:
Bold Italic Underline Strike | Align left Center Align right | Insert smilies Insert link URLInsert protected URL Select color | Add Hidden Text Insert Quote Convert selected text from selection to Cyrillic (Russian) alphabet Insert spoiler
winkwinkedsmileam
belayfeelfellowlaughing
lollovenorecourse
requestsadtonguewassat
cryingwhatbullyangry
Security Code: *
Include security image CAPCHA.
Refresh Code

® 2010-2026 GrowingScience.Com