How to cite this paper
Forero, M & Rodríguez, L. (2020). Relief operations as a multi-project: Colombian case.International Journal of Industrial Engineering Computations , 11(1), 153-172.
Refrences
Altay, N., & Green, W. G., (2006). OR/MS research in disaster operations management. European Journal of Operational Research, 175(1), 475–493.
Baccarini, D. (1996). The concept of project complexity—a review. International Journal of Project Management, 14(4), 201-204.
Balcik, B., Beamon, B. M., Krejci, C. C., Muramatsu, K. M., & Ramirez, M., (2010). Coordination in humanitarian relief chains: Practices, challenges and opportunities. International Journal of Production Economics, 126(1), 22–34.
Browning, T. R., & Yassine, A. A. (2010a). Resource-constrained multi-project scheduling: Priority rule performance revisited. International Journal of Production Economics, 126(2), 212–228.
Browning, T. R., & Yassine, A. A., (2010b). A random generator of resource-constrained multi-project network problems. Journal of Scheduling, 13(2), 143–161.
Brucker, P., Drexl, A., Möhring, R., Neumann, K., and Pesch, E. (1999). Resource-constrained project scheduling: Notation, classification, models, and methods. European Journal of Operational Research, 112(1), 3-41.
Chandes, J., & Paché G. (2010). Strategizing humanitarian logistics: the challenge of collective action. Problems and Perspectives in Management, 8(1)
Chang, Y., Wilkinson, S., Potangaroa, R., & Seville, E. (2012). Managing resources in disaster recovery projects. Engineering. Construction and Architectural Management, 10, 557-580.
Demeulemeester, E., & Herroelen, W. (2002). Scope and Relevance of Project scheduling. Project Scheduling, a Research Handbook. Kluwer Academic Publisher: New York, Boston, Dordrecht, London, Moscow.
Dikmen, N., & Elias-Ozkan, S. T. (2016). Housing after disaster: A post occupancy evaluation of a reconstruction project. International Journal of Disaster Risk Reduction, 19, 167-178.
Dufour, É., Laporte, G., Paquette, J., & Rancourt, M. È. (2018). Logistics service network design for humanitarian response in East Africa. Omega, 74, 1-14.
D'Haene, C., Verlinde, S., & Macharis, C. (2015). Measuring while moving (humanitarian supply chain performance measurement–status of research and current practice). Journal of Humanitarian Logistics and Supply Chain Management, 5(2), 146-161.
Elnashai, A. S., Gencturk, B., Kwon, O.-S., Hashash, Y. M. A., Kim, S. J., Jeong, S.-H., and Dukes, J., (2012). The Maule (Chile) earthquake of February 27, 2010: Development of hazard, site specific ground motions and back-analysis of structures. Soil Dynamics and Earthquake Engineering, 42 (January 2011), pp. 229–245.
FEMA, (2008). Emergency support function Annexes: Introduction. Retrieved on August 4, 2015 from: https://www.fema.gov/media-library-data/20130726-1825-25045-0604/emergency_support_function_annexes_introduction_2008_.pdf.
Ferrer, J. M., Ortuño, M. T., & Tirado, G. (2016). A GRASP metaheuristic for humanitarian aid distribution. Journal of Heuristics, 22(1), 55-87.
Florez, J. V., Lauras, M., Okongwu, U., & Dupont, L. (2015). A decision support system for robust humanitarian facility location. Engineering Applications of Artificial Intelligence, 46, 326-335.
Gacasan, E. M. P., & Wiggins, M. W. (2017). Sensemaking through cue utilisation in disaster recovery project management. International Journal of Project Management, 35(5), 818-826.
Geiger, M. J. (2017). A multi-threaded local search algorithm and computer implementation for the multi-mode, resource-constrained multi-project scheduling problem. European Journal of Operational Research, 256, 729–741.
Goldschmidt, K. H., & Kumar, S. (2016). Humanitarian operations and crisis/disaster management: A retrospective review of the literature and framework for development. International Journal of Disaster Risk Reduction, 20, 1–13.
Guanxiang, Z., Meng, Z., Zhiyong, Z., & Guihai, L. (2010). An Evaluation Model for Emergency Logistics System. In Management and Service Science (MASS), 2010 International Conference on (pp. 1-4). IEEE.
Habibi, F., Barzinpour, F., & Sadjadi, S. (2018). Resource-constrained project scheduling problem: review of past and recent developments. Journal of Project Management, 3(2), 55-88.
Haiti, Government, (2010), Plan de Acción para la Recuperación y el Desarrollo de Haití. Retrieved on September 8, 2012 at: http://whc.unesco.org/uploads/activities/documents/activity-651-7.pdf.
Haouari, M., Kooli, A., & Néron, E., (2012). Enhanced energetic reasoning-based lower bounds for the resource constrained project scheduling problem. Computers and Operations Research, 39(5), 1187–1194.
Harrell, M. C., & Bradley, M. A. (2009). Data collection methods. Semi-structured interviews and focus groups. Rand National Defense Research Institute, Santa Monica, California. Retrieved on February 12, 2013 at: http://www.dtic.mil/dtic/tr/fulltext/u2/a512853.pdf.
He, Q., Luo, L., Hu, Y., & Chan, A.P.C., (2015), Measuring the complexity of mega construction projects in China-A fuzzy analytic network process analysis. International Journal of Project Management, 33(3), 549-563.
Holguín-Veras, J., & Jaller, M. (2012). Immediate resource requirements after hurricane Katrina. Natural Hazards Review, 13(2), 117-131.
Holguín-Veras, J., Jaller, M. Van Wassenhove, L. N., Pérez, N., & Wachtendorf, T. (2012a). On the unique features of post-disaster humanitarian logistics. Journal of Operations Management, 30 (7–8), 494–506.
Holguín-Veras, J., Wachtendorf, T., Jaller, M., & Jefferson, T. (2012b). Logistics and the Management of Critical Supplies Following Catastrophes. In R. Bissell (editor), Preparedness and Response for Catastrophic Disasters (pp. 131-150). Uniter States: Taylor and Francis Group.
ISO (1990). International Standard ISO/CD 8402-1 Quality Concepts and Terminology Part One: Generic Terms and Definitions”, International Organization for Standardization, December.
Ju, C., & Chen, T. (2012). Simplifying multiproject scheduling problem based on design structure matrix and its solution by an improved aiNet algorithm. Discrete Dynamics in Nature and Society, 2012.
Kalkman, J. P., & de Waard, E. J. (2017). Inter-organizational disaster management projects: Finding the middle way between trust and control. International Journal of Project Management, 35(5), 889-899.
Kim, K. N., & Choi, J. H., (2013). Breaking the vicious cycle of flood disasters: Goals of project management in post-disaster rebuild projects. International Journal of Project Management, 31 (2013), 147–160.
Kovács, G., & Spens, K. M. (2007). Humanitarian logistics in disaster relief operations. International Journal of Physical Distribution and Logistics Management, 37(2), 99–114.
Kovács, G., & Spens, K. M. (2009). Identifying challenges in humanitarian logistics. International Journal of Physical Distribution and Logistics Management, 39(6), 506-528.
Lombardi, M., & Milano, M. (2012). A min-flow algorithm for Minimal Critical Set detection in Resource Constrained Project Scheduling. Artificial Intelligence, 182-183, 58–67.
Lin, Y., Kelemen, M., & Kiyomiya, T. (2016). The role of community leadership in disaster recovery projects: Tsunami lessons from Japan. International Journal of Project Management, 35(5), 913-924.
Lin Moe, T., Gehbauer, F., Senitz, S., & Mueller, M. (2007). Balanced scorecard for natural disaster management projects. Disaster Prevention and Management: An International Journal, 16(5), 785-806.
Lu, Y., Luo, L., Wang, H., Le, Y., & Shi, Q. (2015). Measurement model of project complexity for large-scale projects from task and organization perspective. International Journal of Project Management, 33(3), 610-622.
Makepeace, D., Tatham, P., & Wu, Y. (2017). Internal integration in humanitarian supply chain management: Perspectives at the logistics-programmes interface. Journal of Humanitarian Logistics and Supply Chain Management, 7(1), 26-56.
Martinelli, R. J., & Milosevic, D. Z. (2016). Schedule Development. In Project management toolbox: tools and techniques for the practicing project manager (pp. 171-222). John Wiley and Sons.
Mojtahedi, M., & Oo, B. L. (2017). The impact of stakeholder attributes on performance of disaster recovery projects: The case of transport infrastructure. International Journal of Project Management, 35(5), 841-852.
Moreno, K. V. (2012). Análisis de la relación entre estrategias de gestión logística humanitaria y el tiempo de respuesta en la atención de desastres, por medio de la metodología integral y dinámica. Universidad de La Sabana, Master Thesis, Chía, Colombia.
Nappi, M. M. L., & Souza, J. C. (2015). Disaster management: hierarchical structuring criteria for selection and location of temporary shelters. Natural Hazards, 75(3), 2421-2436.
Oloruntoba, R., & Gray, R. (2006). Humanitarian aid: an agile supply chain?. Supply Chain Management: An International Journal, 11(2), 115–120.
Ophiyandri, T., Amaratunga, D., Pathirage, C., & Keraminiyage, K. (2013). Critical success factors for community‐based post‐disaster housing reconstruction projects in the pre‐construction stage in Indonesia. International Journal of Disaster Resilience in the Built Environment, 10, 236-249
Overstreet, R. E., Hall, D., Hanna, J. B., & Kelly Rainer Jr, R. (2011). Research in humanitarian logistics. Journal of Humanitarian Logistics and Supply Chain Management, 1(2), 114-131.
PAHO- Pan American Health Organization (2000). Manual for the logistical management of humanitarian supplies. Retrieved from http://cidbimena.desastres.hn/docum/ops/libros/manejologistico.pdf, in January of 2013
Patanakul, P., Iewwongcharoen, B., & Milosevic, D. (2010). An empirical study on the use of project management tools and techniques across project life-cycle and their impact on project success. Journal of General Management, 35(3), 41-66.
PMBOOK Guide. (2004). A Guide to the Project Management Body of Knowledge. Third Edition. Four Campus Boulevard. Newtown Square, Pennsylvania. USA
PMI (2004). A guide to the project management body of knowledge. In Project Management Institute (Vol. 3).
Republic of Colombia, (2011). Decree 4147. Retrieved on September 22, 2012 at: http://wsp.presidencia.gov.co/Normativa/Decretos/2011/Documents/Noviembre/03/dec414703112011.pdf.
Pettit, S., & Beresford, A., (2009). Critical success factors in the context of humanitarian aid supply chains. International Journal of Physical Distribution and Logistics Management, 39(6), 450–468.
Ransikarbum, K., & Mason, S.J., (2014). Multiple-objective analysis of integrated relief supply and network restoration in humanitarian logistics operations. International Journal of Production Research, 54(1), 49-68.
Sadiqi, Z., Trigunarsyah, B., and Coffey, V. (2016). A framework for community participation in post-disaster housing reconstruction projects: A case of Afghanistan. International Journal of Project Management, 35(5), 900-912.
Sahebjamnia, N., Torabi, S. A., & Mansouri, S. A. (2017). A hybrid decision support system for managing humanitarian relief chains. Decision Support Systems, 95, 12-26.
San Cristobal, J. R., (2015). Management Science, Operations Research and Project Management: Modelling, Evaluation, Scheduling, Monitoring (pp. 1-11). Routledge, NY, USA.
San Cristóbal, J. R. (2017). Complexity in Project Management. Procedia Computer Science, 121, 762-766.
Sheu, J.-B. (2007). An emergency logistics distribution approach for quick response to urgent relief demand in disasters. Transportation Research Part E, 43(6), 687–709.
SNPAD, Sistema Nacional para la Prevención y Atención de Desastres, (2006a). Guía de actuación y protocolos de alto Gobierno en caso de un desastre súbito de cobertura Nacional. Documento General, Retrieved on November 24, 2012. at: http://www.gestiondelriesgo.gov.co/snigrd/pagina.aspx?id=91.
SNPAD, Sistema Nacional para la Prevención y Atención de Desastres, (2006b). Protocolo de actuación del Presidente de la República en Caso de un desastre súbito de Cobertura Nacional, Retrieved on November 24, 2012. at: http://www.gestiondelriesgo.gov.co/snigrd/archivos/documentos/PROTOCOLOS/Protocolo%20Presidente%20de%20la%20Republica.pdf.
SNPAD, Sistema Nacional para la Prevención y Atención de Desastres, (2006c). Protocolo de actuación del Ministro del Interior y de Justicia en Caso de un desastre súbito de Cobertura Nacional, Retrieved on November 24, 2012. at: http://www.gestiondelriesgo.gov.co/snigrd/archivos/documentos/PROTOCOLOS/Protocolo%20Ministro%20del%20Interior.pdf
SNPAD, Sistema Nacional para la Prevención y Atención de Desastres, (2006d). Protocolo de actuación del Director de prevención y atención de desastres en caso de un desastre súbito de cobertura Nacional, Retrieved on November 24, 2012. at: http://www.gestiondelriesgo.gov.co/snigrd/archivos/documentos/PROTOCOLOS/Protocolo%20Director%20de%20PAD.pdf
SNPAD, Sistema Nacional para la Prevención y Atención de Desastres, (2006e). Protocolo de actuación de los Ministros del despacho en caso de un desastre súbito de cobertura Nacional, Retrieved on November 24, 2012. at: http://www.gestiondelriesgo.gov.co/snigrd/archivos/documentos/PROTOCOLOS/Protocolo%20Ministros%20del%20Despacho.pdf.
SNPAD, Sistema Nacional para la Prevención y Atención de Desastres, (2006f). Protocolo de actuación del comandante de las Fuerzas Militares y el Director de la Policía en caso de un desastre súbito de cobertura Nacional, Retrieved on November 24, 2012. at:
http://www.gestiondelriesgo.gov.co/snigrd/archivos/documentos/PROTOCOLOS/Protocolo%20Fuerzas%20Militares%20y%20Policia.pdf.
SNPAD, Sistema Nacional para la Prevención y Atención de Desastres, (2006g). Protocolo de actuación del Procurador y Fiscal General de la Nación en caso de un desastre súbito de cobertura Nacional, Retrieved on November 24, 2012. at:
http://www.gestiondelriesgo.gov.co/snigrd/archivos/documentos/PROTOCOLOS/Protocolo%20Procurador%20y%20Fiscal.pdf
SNPAD, Sistema Nacional para la Prevención y Atención de Desastres, (2006h). Protocolo de actuación de los medios masivos de información pública Nacional en caso de un desastre súbito de cobertura Nacional, Retrieved on November 24, 2012. at:
http://www.gestiondelriesgo.gov.co/snigrd/archivos/documentos/PROTOCOLOS/Protocolo%20Medios%20de%20Comunicacion.pdf.
SNPAD, Sistema Nacional para la Prevención y Atención de Desastres, (2006i). Relaciones entre autoridades territoriales en caso de un desastre súbito de cobertura Nacional, Retrieved on November 24, 2012. at:
http://www.gestiondelriesgo.gov.co/snigrd/archivos/documentos/PROTOCOLOS/08%20Protocolo%20Autoridades%20Territoriales.pdf.
UNGRD, Unidad Nacional para la Gestión del Riesgo de Desastres (2012). available at: http://portal.gestiondelriesgo.gov.co/, accessed on: November 8, 2012.
Vahanvati, M., & Mulligan, M. (2017). A new model for effective post-disaster housing reconstruction: Lessons from Gujarat and Bihar in India. International Journal of Project Management, 35(5), 802-817.
Van Wassenhove, L. N. (2006). Humanitarian aid logistics: supply chain management in high gear. Journal of the Operational Research Society, 57(5), 475–489
Van Wassenhove, L. N., & Pedraza Martinez, A. J., (2012). Using OR to adapt supply chain management best practices to humanitarian logistics. International Transactions in Operational Research, 19(1-2), 307-322.
Vitoriano, B., Ortuño, M. T., Tirado, G., & Montero, J., (2010). A multi-criteria optimization model for humanitarian aid distribution. Journal of Global Optimization, 51(2), 189–208.
Wilson, M. M., Tatham, P., Payne, J., L’Hermitte, C., & Shapland, M. (2018). Best practice relief supply for emergency services in a developed economy: Evidence from Queensland Australia. Journal of Humanitarian Logistics and Supply Chain Management, 8(1), 107-132.
Yan, L., Jinsong, B., Xiaofeng, H., & Ye, J. (2009). A heuristic project scheduling approach for quick response to maritime disaster rescue. International Journal of Project Management, 27(6), 620–628.
Zhang, L., Zou, X., & Chen, X., (2012). Resource-constrained Scheduling in Repetitive Projects. International Journal on Advances in Information Sciences and Service Sciences, 4(14), 287–294.
Zheng, Y., Chen, S., & Ling, H., (2015). Evolutionary optimization for disaster relief operations: A survey. Applied Soft Computing, 27, 553–566.
Baccarini, D. (1996). The concept of project complexity—a review. International Journal of Project Management, 14(4), 201-204.
Balcik, B., Beamon, B. M., Krejci, C. C., Muramatsu, K. M., & Ramirez, M., (2010). Coordination in humanitarian relief chains: Practices, challenges and opportunities. International Journal of Production Economics, 126(1), 22–34.
Browning, T. R., & Yassine, A. A. (2010a). Resource-constrained multi-project scheduling: Priority rule performance revisited. International Journal of Production Economics, 126(2), 212–228.
Browning, T. R., & Yassine, A. A., (2010b). A random generator of resource-constrained multi-project network problems. Journal of Scheduling, 13(2), 143–161.
Brucker, P., Drexl, A., Möhring, R., Neumann, K., and Pesch, E. (1999). Resource-constrained project scheduling: Notation, classification, models, and methods. European Journal of Operational Research, 112(1), 3-41.
Chandes, J., & Paché G. (2010). Strategizing humanitarian logistics: the challenge of collective action. Problems and Perspectives in Management, 8(1)
Chang, Y., Wilkinson, S., Potangaroa, R., & Seville, E. (2012). Managing resources in disaster recovery projects. Engineering. Construction and Architectural Management, 10, 557-580.
Demeulemeester, E., & Herroelen, W. (2002). Scope and Relevance of Project scheduling. Project Scheduling, a Research Handbook. Kluwer Academic Publisher: New York, Boston, Dordrecht, London, Moscow.
Dikmen, N., & Elias-Ozkan, S. T. (2016). Housing after disaster: A post occupancy evaluation of a reconstruction project. International Journal of Disaster Risk Reduction, 19, 167-178.
Dufour, É., Laporte, G., Paquette, J., & Rancourt, M. È. (2018). Logistics service network design for humanitarian response in East Africa. Omega, 74, 1-14.
D'Haene, C., Verlinde, S., & Macharis, C. (2015). Measuring while moving (humanitarian supply chain performance measurement–status of research and current practice). Journal of Humanitarian Logistics and Supply Chain Management, 5(2), 146-161.
Elnashai, A. S., Gencturk, B., Kwon, O.-S., Hashash, Y. M. A., Kim, S. J., Jeong, S.-H., and Dukes, J., (2012). The Maule (Chile) earthquake of February 27, 2010: Development of hazard, site specific ground motions and back-analysis of structures. Soil Dynamics and Earthquake Engineering, 42 (January 2011), pp. 229–245.
FEMA, (2008). Emergency support function Annexes: Introduction. Retrieved on August 4, 2015 from: https://www.fema.gov/media-library-data/20130726-1825-25045-0604/emergency_support_function_annexes_introduction_2008_.pdf.
Ferrer, J. M., Ortuño, M. T., & Tirado, G. (2016). A GRASP metaheuristic for humanitarian aid distribution. Journal of Heuristics, 22(1), 55-87.
Florez, J. V., Lauras, M., Okongwu, U., & Dupont, L. (2015). A decision support system for robust humanitarian facility location. Engineering Applications of Artificial Intelligence, 46, 326-335.
Gacasan, E. M. P., & Wiggins, M. W. (2017). Sensemaking through cue utilisation in disaster recovery project management. International Journal of Project Management, 35(5), 818-826.
Geiger, M. J. (2017). A multi-threaded local search algorithm and computer implementation for the multi-mode, resource-constrained multi-project scheduling problem. European Journal of Operational Research, 256, 729–741.
Goldschmidt, K. H., & Kumar, S. (2016). Humanitarian operations and crisis/disaster management: A retrospective review of the literature and framework for development. International Journal of Disaster Risk Reduction, 20, 1–13.
Guanxiang, Z., Meng, Z., Zhiyong, Z., & Guihai, L. (2010). An Evaluation Model for Emergency Logistics System. In Management and Service Science (MASS), 2010 International Conference on (pp. 1-4). IEEE.
Habibi, F., Barzinpour, F., & Sadjadi, S. (2018). Resource-constrained project scheduling problem: review of past and recent developments. Journal of Project Management, 3(2), 55-88.
Haiti, Government, (2010), Plan de Acción para la Recuperación y el Desarrollo de Haití. Retrieved on September 8, 2012 at: http://whc.unesco.org/uploads/activities/documents/activity-651-7.pdf.
Haouari, M., Kooli, A., & Néron, E., (2012). Enhanced energetic reasoning-based lower bounds for the resource constrained project scheduling problem. Computers and Operations Research, 39(5), 1187–1194.
Harrell, M. C., & Bradley, M. A. (2009). Data collection methods. Semi-structured interviews and focus groups. Rand National Defense Research Institute, Santa Monica, California. Retrieved on February 12, 2013 at: http://www.dtic.mil/dtic/tr/fulltext/u2/a512853.pdf.
He, Q., Luo, L., Hu, Y., & Chan, A.P.C., (2015), Measuring the complexity of mega construction projects in China-A fuzzy analytic network process analysis. International Journal of Project Management, 33(3), 549-563.
Holguín-Veras, J., & Jaller, M. (2012). Immediate resource requirements after hurricane Katrina. Natural Hazards Review, 13(2), 117-131.
Holguín-Veras, J., Jaller, M. Van Wassenhove, L. N., Pérez, N., & Wachtendorf, T. (2012a). On the unique features of post-disaster humanitarian logistics. Journal of Operations Management, 30 (7–8), 494–506.
Holguín-Veras, J., Wachtendorf, T., Jaller, M., & Jefferson, T. (2012b). Logistics and the Management of Critical Supplies Following Catastrophes. In R. Bissell (editor), Preparedness and Response for Catastrophic Disasters (pp. 131-150). Uniter States: Taylor and Francis Group.
ISO (1990). International Standard ISO/CD 8402-1 Quality Concepts and Terminology Part One: Generic Terms and Definitions”, International Organization for Standardization, December.
Ju, C., & Chen, T. (2012). Simplifying multiproject scheduling problem based on design structure matrix and its solution by an improved aiNet algorithm. Discrete Dynamics in Nature and Society, 2012.
Kalkman, J. P., & de Waard, E. J. (2017). Inter-organizational disaster management projects: Finding the middle way between trust and control. International Journal of Project Management, 35(5), 889-899.
Kim, K. N., & Choi, J. H., (2013). Breaking the vicious cycle of flood disasters: Goals of project management in post-disaster rebuild projects. International Journal of Project Management, 31 (2013), 147–160.
Kovács, G., & Spens, K. M. (2007). Humanitarian logistics in disaster relief operations. International Journal of Physical Distribution and Logistics Management, 37(2), 99–114.
Kovács, G., & Spens, K. M. (2009). Identifying challenges in humanitarian logistics. International Journal of Physical Distribution and Logistics Management, 39(6), 506-528.
Lombardi, M., & Milano, M. (2012). A min-flow algorithm for Minimal Critical Set detection in Resource Constrained Project Scheduling. Artificial Intelligence, 182-183, 58–67.
Lin, Y., Kelemen, M., & Kiyomiya, T. (2016). The role of community leadership in disaster recovery projects: Tsunami lessons from Japan. International Journal of Project Management, 35(5), 913-924.
Lin Moe, T., Gehbauer, F., Senitz, S., & Mueller, M. (2007). Balanced scorecard for natural disaster management projects. Disaster Prevention and Management: An International Journal, 16(5), 785-806.
Lu, Y., Luo, L., Wang, H., Le, Y., & Shi, Q. (2015). Measurement model of project complexity for large-scale projects from task and organization perspective. International Journal of Project Management, 33(3), 610-622.
Makepeace, D., Tatham, P., & Wu, Y. (2017). Internal integration in humanitarian supply chain management: Perspectives at the logistics-programmes interface. Journal of Humanitarian Logistics and Supply Chain Management, 7(1), 26-56.
Martinelli, R. J., & Milosevic, D. Z. (2016). Schedule Development. In Project management toolbox: tools and techniques for the practicing project manager (pp. 171-222). John Wiley and Sons.
Mojtahedi, M., & Oo, B. L. (2017). The impact of stakeholder attributes on performance of disaster recovery projects: The case of transport infrastructure. International Journal of Project Management, 35(5), 841-852.
Moreno, K. V. (2012). Análisis de la relación entre estrategias de gestión logística humanitaria y el tiempo de respuesta en la atención de desastres, por medio de la metodología integral y dinámica. Universidad de La Sabana, Master Thesis, Chía, Colombia.
Nappi, M. M. L., & Souza, J. C. (2015). Disaster management: hierarchical structuring criteria for selection and location of temporary shelters. Natural Hazards, 75(3), 2421-2436.
Oloruntoba, R., & Gray, R. (2006). Humanitarian aid: an agile supply chain?. Supply Chain Management: An International Journal, 11(2), 115–120.
Ophiyandri, T., Amaratunga, D., Pathirage, C., & Keraminiyage, K. (2013). Critical success factors for community‐based post‐disaster housing reconstruction projects in the pre‐construction stage in Indonesia. International Journal of Disaster Resilience in the Built Environment, 10, 236-249
Overstreet, R. E., Hall, D., Hanna, J. B., & Kelly Rainer Jr, R. (2011). Research in humanitarian logistics. Journal of Humanitarian Logistics and Supply Chain Management, 1(2), 114-131.
PAHO- Pan American Health Organization (2000). Manual for the logistical management of humanitarian supplies. Retrieved from http://cidbimena.desastres.hn/docum/ops/libros/manejologistico.pdf, in January of 2013
Patanakul, P., Iewwongcharoen, B., & Milosevic, D. (2010). An empirical study on the use of project management tools and techniques across project life-cycle and their impact on project success. Journal of General Management, 35(3), 41-66.
PMBOOK Guide. (2004). A Guide to the Project Management Body of Knowledge. Third Edition. Four Campus Boulevard. Newtown Square, Pennsylvania. USA
PMI (2004). A guide to the project management body of knowledge. In Project Management Institute (Vol. 3).
Republic of Colombia, (2011). Decree 4147. Retrieved on September 22, 2012 at: http://wsp.presidencia.gov.co/Normativa/Decretos/2011/Documents/Noviembre/03/dec414703112011.pdf.
Pettit, S., & Beresford, A., (2009). Critical success factors in the context of humanitarian aid supply chains. International Journal of Physical Distribution and Logistics Management, 39(6), 450–468.
Ransikarbum, K., & Mason, S.J., (2014). Multiple-objective analysis of integrated relief supply and network restoration in humanitarian logistics operations. International Journal of Production Research, 54(1), 49-68.
Sadiqi, Z., Trigunarsyah, B., and Coffey, V. (2016). A framework for community participation in post-disaster housing reconstruction projects: A case of Afghanistan. International Journal of Project Management, 35(5), 900-912.
Sahebjamnia, N., Torabi, S. A., & Mansouri, S. A. (2017). A hybrid decision support system for managing humanitarian relief chains. Decision Support Systems, 95, 12-26.
San Cristobal, J. R., (2015). Management Science, Operations Research and Project Management: Modelling, Evaluation, Scheduling, Monitoring (pp. 1-11). Routledge, NY, USA.
San Cristóbal, J. R. (2017). Complexity in Project Management. Procedia Computer Science, 121, 762-766.
Sheu, J.-B. (2007). An emergency logistics distribution approach for quick response to urgent relief demand in disasters. Transportation Research Part E, 43(6), 687–709.
SNPAD, Sistema Nacional para la Prevención y Atención de Desastres, (2006a). Guía de actuación y protocolos de alto Gobierno en caso de un desastre súbito de cobertura Nacional. Documento General, Retrieved on November 24, 2012. at: http://www.gestiondelriesgo.gov.co/snigrd/pagina.aspx?id=91.
SNPAD, Sistema Nacional para la Prevención y Atención de Desastres, (2006b). Protocolo de actuación del Presidente de la República en Caso de un desastre súbito de Cobertura Nacional, Retrieved on November 24, 2012. at: http://www.gestiondelriesgo.gov.co/snigrd/archivos/documentos/PROTOCOLOS/Protocolo%20Presidente%20de%20la%20Republica.pdf.
SNPAD, Sistema Nacional para la Prevención y Atención de Desastres, (2006c). Protocolo de actuación del Ministro del Interior y de Justicia en Caso de un desastre súbito de Cobertura Nacional, Retrieved on November 24, 2012. at: http://www.gestiondelriesgo.gov.co/snigrd/archivos/documentos/PROTOCOLOS/Protocolo%20Ministro%20del%20Interior.pdf
SNPAD, Sistema Nacional para la Prevención y Atención de Desastres, (2006d). Protocolo de actuación del Director de prevención y atención de desastres en caso de un desastre súbito de cobertura Nacional, Retrieved on November 24, 2012. at: http://www.gestiondelriesgo.gov.co/snigrd/archivos/documentos/PROTOCOLOS/Protocolo%20Director%20de%20PAD.pdf
SNPAD, Sistema Nacional para la Prevención y Atención de Desastres, (2006e). Protocolo de actuación de los Ministros del despacho en caso de un desastre súbito de cobertura Nacional, Retrieved on November 24, 2012. at: http://www.gestiondelriesgo.gov.co/snigrd/archivos/documentos/PROTOCOLOS/Protocolo%20Ministros%20del%20Despacho.pdf.
SNPAD, Sistema Nacional para la Prevención y Atención de Desastres, (2006f). Protocolo de actuación del comandante de las Fuerzas Militares y el Director de la Policía en caso de un desastre súbito de cobertura Nacional, Retrieved on November 24, 2012. at:
http://www.gestiondelriesgo.gov.co/snigrd/archivos/documentos/PROTOCOLOS/Protocolo%20Fuerzas%20Militares%20y%20Policia.pdf.
SNPAD, Sistema Nacional para la Prevención y Atención de Desastres, (2006g). Protocolo de actuación del Procurador y Fiscal General de la Nación en caso de un desastre súbito de cobertura Nacional, Retrieved on November 24, 2012. at:
http://www.gestiondelriesgo.gov.co/snigrd/archivos/documentos/PROTOCOLOS/Protocolo%20Procurador%20y%20Fiscal.pdf
SNPAD, Sistema Nacional para la Prevención y Atención de Desastres, (2006h). Protocolo de actuación de los medios masivos de información pública Nacional en caso de un desastre súbito de cobertura Nacional, Retrieved on November 24, 2012. at:
http://www.gestiondelriesgo.gov.co/snigrd/archivos/documentos/PROTOCOLOS/Protocolo%20Medios%20de%20Comunicacion.pdf.
SNPAD, Sistema Nacional para la Prevención y Atención de Desastres, (2006i). Relaciones entre autoridades territoriales en caso de un desastre súbito de cobertura Nacional, Retrieved on November 24, 2012. at:
http://www.gestiondelriesgo.gov.co/snigrd/archivos/documentos/PROTOCOLOS/08%20Protocolo%20Autoridades%20Territoriales.pdf.
UNGRD, Unidad Nacional para la Gestión del Riesgo de Desastres (2012). available at: http://portal.gestiondelriesgo.gov.co/, accessed on: November 8, 2012.
Vahanvati, M., & Mulligan, M. (2017). A new model for effective post-disaster housing reconstruction: Lessons from Gujarat and Bihar in India. International Journal of Project Management, 35(5), 802-817.
Van Wassenhove, L. N. (2006). Humanitarian aid logistics: supply chain management in high gear. Journal of the Operational Research Society, 57(5), 475–489
Van Wassenhove, L. N., & Pedraza Martinez, A. J., (2012). Using OR to adapt supply chain management best practices to humanitarian logistics. International Transactions in Operational Research, 19(1-2), 307-322.
Vitoriano, B., Ortuño, M. T., Tirado, G., & Montero, J., (2010). A multi-criteria optimization model for humanitarian aid distribution. Journal of Global Optimization, 51(2), 189–208.
Wilson, M. M., Tatham, P., Payne, J., L’Hermitte, C., & Shapland, M. (2018). Best practice relief supply for emergency services in a developed economy: Evidence from Queensland Australia. Journal of Humanitarian Logistics and Supply Chain Management, 8(1), 107-132.
Yan, L., Jinsong, B., Xiaofeng, H., & Ye, J. (2009). A heuristic project scheduling approach for quick response to maritime disaster rescue. International Journal of Project Management, 27(6), 620–628.
Zhang, L., Zou, X., & Chen, X., (2012). Resource-constrained Scheduling in Repetitive Projects. International Journal on Advances in Information Sciences and Service Sciences, 4(14), 287–294.
Zheng, Y., Chen, S., & Ling, H., (2015). Evolutionary optimization for disaster relief operations: A survey. Applied Soft Computing, 27, 553–566.