Processing, Please wait...

  • Publisher Home
  • Home
  • 🔙 Back
  • 📚 Journals
    • ⚙️ IJIEC - Industrial Engineering Computations
    • 🌐 IJDNS - Data and Network Science
    • 🧪 CCL - Current Chemistry Letters
    • 💹 AC - Accounting
    • 🎯 DSL - Decision Science Letters
    • 🚛 USCM - Uncertain Supply Chain Management
    • 🏗️ JPM - Journal of Project Management
    • 🏥 HE - Healthcare Engineering
    • 📈 SCI - Scientometrica
    • 🔩 ESM - Engineering Solid Mechanics
    • 🌿 JFS - Journal of Future Sustainability
    • 💼 MSL - Management Science Letters
  • 📝 Submit Article
  • 📊 Statistics
  • 📋 About
    • 📄 About Us
    • 📰 Blog
    • 📢 News
    • 📧 Contact
  • 📺 Tutorial
  • Search:
  • Advanced Search

Growing Science » International Journal of Industrial Engineering Computations » Coordination policy for a three echelon supply chain considering imperfect quality items

⭐ Highly Cited Articles

  • Jaya Algorithm
  • Rao Algorithm
  • TLBO Algorithm
  • ChatGPT and Blended Learning

Journals

  • IJIEC (840)
  • IJDS (1032)
  • DSL (759)
  • ESM (434)
  • CCL (563)
  • JPM (350)
  • AC (572)
  • JFS (106)
  • MSL (2658)
  • USCM (1104)
  • HE (57)
  • SCI (53)

IJIEC Volumes

    • ▼ Volume 17 (113)
      • Issue 1 (21)
      • Issue 2 (30)
      • Issue 3 (26)
      • Issue 4 (36)
    • ▼ Volume 16 (75)
      • Issue 1 (12)
      • Issue 2 (15)
      • Issue 3 (19)
      • Issue 4 (29)
    • ▼ Volume 15 (55)
      • Issue 1 (19)
      • Issue 2 (15)
      • Issue 3 (12)
      • Issue 4 (9)
    • ▼ Volume 14 (50)
      • Issue 1 (11)
      • Issue 2 (15)
      • Issue 3 (9)
      • Issue 4 (15)
    • ▼ Volume 13 (41)
      • Issue 1 (10)
      • Issue 2 (8)
      • Issue 3 (10)
      • Issue 4 (13)
    • ▼ Volume 12 (29)
      • Issue 1 (9)
      • Issue 2 (6)
      • Issue 3 (8)
      • Issue 4 (6)
    • ▼ Volume 11 (36)
      • Issue 1 (9)
      • Issue 2 (8)
      • Issue 3 (9)
      • Issue 4 (10)
    • ▼ Volume 10 (34)
      • Issue 1 (8)
      • Issue 2 (10)
      • Issue 3 (8)
      • Issue 4 (8)
    • ▼ Volume 9 (32)
      • Issue 1 (9)
      • Issue 2 (6)
      • Issue 3 (7)
      • Issue 4 (10)
    • ▼ Volume 8 (30)
      • Issue 1 (9)
      • Issue 2 (7)
      • Issue 3 (8)
      • Issue 4 (6)
    • ▼ Volume 7 (47)
      • Issue 1 (10)
      • Issue 2 (14)
      • Issue 3 (10)
      • Issue 4 (13)
    • ▼ Volume 6 (39)
      • Issue 1 (7)
      • Issue 2 (12)
      • Issue 3 (10)
      • Issue 4 (10)
    • ▼ Volume 5 (47)
      • Issue 1 (13)
      • Issue 2 (12)
      • Issue 3 (12)
      • Issue 4 (10)
    • ▼ Volume 4 (50)
      • Issue 1 (14)
      • Issue 2 (10)
      • Issue 3 (12)
      • Issue 4 (14)
    • ▼ Volume 3 (77)
      • Issue 1 (10)
      • Issue 2 (15)
      • Issue 3 (20)
      • Issue 4 (12)
      • Issue 5 (20)
    • ▼ Volume 2 (68)
      • Issue 1 (12)
      • Issue 2 (20)
      • Issue 3 (20)
      • Issue 4 (16)
    • ▼ Volume 1 (17)
      • Issue 1 (9)
      • Issue 2 (8)

🔑 Keywords

Jordan(175)
Supply chain management(172)
Vietnam(154)
Customer satisfaction(124)
Performance(117)
Supply chain(115)
Artificial intelligence(108)
Service quality(101)
Competitive advantage(100)
SMEs(95)
Sustainability(94)
Tehran Stock Exchange(94)
optimization(88)
Financial performance(86)
TOPSIS(85)
Trust(85)
Organizational performance(81)
Job satisfaction(81)
Genetic Algorithm(81)
Social media(80)


» Show all keywords

✍️ Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(70)
Mohammad Reza Iravani(65)
Endri Endri(45)
Hotlan Siagian(43)
Muhammad Alshurideh(42)
Dmaithan Almajali(39)
Jumadil Saputra(37)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Sautma Ronni Basana(33)
Barween Al Kurdi(32)
Basrowi Basrowi(31)
Mohammad Khodaei Valahzaghard(30)
Haitham M. Alzoubi(30)
Ni Nyoman Kerti Yasa(30)
Hassan Ghodrati(30)
Shankar Chakraborty(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Mahmoud Allahham(28)


» Show all authors

🌍 Countries

1. Algeria (52)
2. Angola (2)
3. Argentina (22)
4. Armenia (2)
5. Australia (52)
6. Austria (2)
7. Bahrain (26)
8. Bangladesh (58)
9. Belarus (4)
10. Belgium (3)
11. Benin (2)
12. Benin Republic (1)
13. Bhutan (1)
14. Bosnia and Herzegovina (1)
15. Botswana (9)
16. Brazil (40)
17. Brunei (1)
18. Bulgaria (1)
19. Burkina Faso (1)
20. Cameroon (1)
Total: 121 countries

Show all countries
International Journal of Industrial Engineering Computations
ISSN 1923-2934 (Online) - ISSN 1923-2926 (Print)
Quarterly Publication
Volume 5 Issue 4 pp. 589-602, 2014

Coordination policy for a three echelon supply chain considering imperfect quality items Pages 589-602 PDF Download PDF

Authors: Narayan Singh, Bindu Vaish, S. R. Singh

📋 Author Affiliations:
Narayan Singh ORCID , Bindu Vaish, S.R. Singh ORCID
¹ Department of Mathematics D.N. College, C.C.S. University, Meerut (U.P), 250001, India
doi 10.5267/j.ijiec.2014.7.001
3 Source: Scopus
Crossref 3 Source: CrossRef

🔑 Keywords: Backlogging, Imperfect production process, Three echelon supply chain

Abstract: In this study, we develop a three echelon supply chain model for items to determine the optimal reliability and production rate, which achieves the biggest total integrated profit for an imperfect manufacturing process. Here, we have taken a supplier, a manufacturer and a retailer in which supplier supplies raw materials to manufacturer, manufacturer produces perfect and imperfect quality items because practically it happens and manufacturer supplies perfect quality items to the retailers. In production system, production facility may shift from an in-control state to an out-of-control state at any random time. The basic assumption of classical economic manufacturing quantity model is that all manufacturing items are of perfect quality but the assumption is not true in practice. The proposed study is formulated assuming that a certain percent of total product is defective. This percentage also varies with production rate and production run time. The defective items are restored in original quality by reworked at some costs to maintain the quality of products in a competitive market. Finally, numerical example and its graphical representation are given to illustrate the proposed model. Sensitivity analysis is also provided to test feasibility of the model.

How to cite this paper
APA: Singh, N., Vaish, B & Singh, S. (2014). Coordination policy for a three echelon supply chain considering imperfect quality items. International Journal of Industrial Engineering Computations, 5(4), 589-602.
Chicago/Turabian: Singh, N., Vaish, B & Singh, S. 2014. "Coordination policy for a three echelon supply chain considering imperfect quality items." International Journal of Industrial Engineering Computations 5, no. 4 (2014): 589-602.
AMA: Singh, N., Vaish, B & Singh, S. Coordination policy for a three echelon supply chain considering imperfect quality items. International Journal of Industrial Engineering Computations. 2014;5(4):589-602.

References
Banerjee, A. (1986). A joint economic lot size model for purchaser and vendor. Decision Sciences, 17, 292–311.

Ben-Daya, M. & Hariga, M. (2000). Economic lot scheduling problem with imperfect production processes. Journal of the Operational Research Society, 51, 875–881.

Biswas, P. & Sarker, B.R. (2008). Optimal batch quantity models for a lean production system with in-cycle rework and scrap. International Journal of Production Research, 46, 6585–6610.

Clark, A.J. & Scarf, H., (1960). Optimal policies for a multi echelon inventory problem. Management Science, 6, 475–490.

Cheng, C. E. (1989). An economic production quantity model with flexibility and reliability considerations. European Journal of Operational Research, 39, 174–179.

Chung, K.J. & Hou, K. L. (2003). An optimal production run time with imperfect production processes and allowable shortages. Computers & Operations Research, 20, 483–490.

Chiu, Y.S.P., Ting, C.K., Cheng, C.B. & Lin, F.Y. (2007). Alternative approach for realistic lot size problem with random scrap rate and backlogging. WSEAS Transactions on Mathematics, 6, 736-740.

C?rdenas-Barr?n, L.E., (2008). Optimal manufacturing batch size with rework in a single stage production system - A simple derivation. Computers and Industrial Engineering Journal, 55, 758–765.

Cardenas-Barron, L. E. (2009). Economic production quantity with rework process at a single-stage manufacturing system with planned backorders. Computers and Industrial Engineering, 57, 1105–1113.

Eroglu, A. & Ozdemir, G. (2007). An economic order quantity model with defective items and shortages. International Journal of Production Economics, 106, 544–549.

Jaber, M.Y. & Guiffrida, A. L. (2004). Learning curves for processes generating defects requiring reworks. European Journal of Operational Research, 159, 663–672.

Khouja, M. & Mehrez, A. (1994). An economic production lot size model with imperfect quality and variable production rate. Journal of the Operational Research Society, 45, 1405–1417.

Khouja, M. (1999). A note on deliberately slowing down output in a family production context. International Journal of Production Research, 37, 4067–4077.

Lee, H. L. & Rosenblatt, M. J. (1987). Simultaneous determination of production cycle and inspection schedules in a production system. Management Sciences, 3, 1125–1136.

Liao, G. L. (2007). Optimal production correction and maintenance policy for imperfect process. European Journal of Operational Research, 182, 1140–1149.

Lo, S.T., Wee, H.M. & Huang, W. C. (2007). An integrated production inventory model with imperfect production processes and Weibull distribution deterioration under inflation. International Journal of Production Economics, 106, 248–260.

Lee, H. H. (2008). The investment model in preventive maintenance in multi-level production systems. International Journal of Production Economics, 112, 816–828.

Liao, G. L. Chen, Y. H. & Sheu, S. H. (2009). Optimal economic production quantity policy for imperfect process with imperfect repair and maintenance. European Journal of Operational Research, 195, 348–357.

Pal, B., Sana, S. S. & Chaudhari, K. (2012). Three-layer supply chain production inventory model for reworkable items. Applied Mathematics and Computation, 219, 530-543

Pal, B., Sana, S. S. & Chaudhari, K. (2012). A multi-echelon supply chain model for reworkable items in multiple-markets with supply disruption. Economic Modelling, 29, 1891-1898.

Rosenblatt, M. J. & Lee, H. L. (1986). Economic production cycles with imperfect production processes, IIE Transactions, 18, 48–55.

Salameh, M. K. & Jaber, M. Y. (2000). Economic production quantity model for items with imperfect quality. International Journal of Production Economics, 64, 59–64.

Sheu, S. H., Chen, J.A., (2004) Optimal lot-sizing problem with imperfect maintenance and imperfect production. International Journal of Systems Science 35, 69–77.

Sarker, B. R., Jamal, A. M. M. & Mondal, S. (2008). Optimal batch sizing in a multi-stage production system with rework consideration, European Journal of Operational Research, 184, 915–929.

Sana, S. S. & Chaudhuri, K. S. (2010). An EMQ model in an imperfect production process. International Journal of Systems Science, 41 (6), 635–646.

Sana, S. S. (2010). A production-inventory model in an imperfect production process. European Journal of Operational Research, 200 (2), 451–464.

Sarkar, B., Sana, S. S. & Chaudhuri, K. S. (2010). Optimal reliability, production lot size and safety stock in an imperfect production system. International Journal of Mathematics in Operational Research, 2, 467–490.

Sana, S. S. (2011). A production-inventory model of imperfect quality products in a three-layer supply chain. Decision Support Systems, 50, 539–547.

Sarkar, B. (2012). An inventory model with reliability in an imperfect production process. Applied Mathematics and Computation, 218, 4881-4891.

Singh, N., Vaish, B. & Singh, S. R. (2012). An economic production lot-size (EPLS) model with rework and flexibility under allowable shortages. International Journal of Procurement Management, 5(1), 104-122.

Wang, C. H. (2004). The impact of a free-repair warranty policy on EMQ model for imperfect production systems. Computers & Operations Research, 31, 2021–2035.

Yeh, R. H., Ho, W. T. & Tseng, S. T. (2000). Optimal production run length for products sold with warranty. European Journal Operational Research, 120, 575–582.
  • 17
  • 1
  • 2
  • 3
  • 4
  • 5

📚 Journal: International Journal of Industrial Engineering Computations | 📅 Year: 2014 | 📖 Volume: 5 | 📄 Issue: 4 | 👁️ Views: 2400 | 📊 Crossref: 3

Related Articles:
  • A production inventory model with exponential demand rate and reverse logistic
  • An economic production model for time dependent demand with rework and multiple production setups
  • An imperfect quality items with learning and inflation under two limited storage capacity
  • A note on "An economic order quantity (EOQ) for items with imperfect quality and inspection errors"
  • Multi products single machine EPQ model with immediate rework process

📝 Ready to share your research?

International Journal of Industrial Engineering Computations is accepting new submissions for upcoming issues. Join our community of authors and publish your work with us.

✓ Open access
✓ Rigorous peer review
✓ Fast publication
📤 Submit Your Manuscript →

📖 Author Guidelines

® 2010-2026 GrowingScience.Com