How to cite this paper
Raj, R., Kaliraman, N., Chandra, S & Chaudhary, H. (2014). A production inventory model with exponential demand rate and reverse logistic.International Journal of Industrial Engineering Computations , 5(4), 521-542.
Refrences
Banerjee, A., & Kim, S. L. (1995). An integrated JIT inventory model. International Journal of Operations and Production Management, 15, 237-244.
Biswas, P., & Sarker, R.B. (2008). Optimal batch quantity models for a lean production system with in-cycle rework and scrap. International Journal of Production Research, 46, 6585-6610.
Cardenas, E.L., & Barron. (2007). Optimizing inventory decisions in a multi-stage multi-customer supply chain. Transportation Research, 43, 647-654.
Cardenas, E.L., & Barron. (2008). Optimal manufacturing batch size with rework in a single stage production system. Computers and Industrial Engineering, 55, 758-765.
Cardenas, E.L., & Barron. (2009b). Economic production quantity with rework process at a single stage manufacturing system with planned backorders. Computers and Industrial Engineering, 57, 1105-1113.
Chang, H. H., & Chend, T. F. (2010). Economic production quantity model with backordering, rework and machine failure taking place in stock piling time. Wseas Transactions on Information Science and Applications, 7, 463-473.
Chiu, S. W., Ting, C. K., & Chiu, Y. S. P. (2007). Optimal production lot sizing with rework, scrap rate, and service level constraint. Mathematical and Computer Modelling, 46(3), 535-549.
Chiu, S. W., Wang, S. L., & Chiu, Y. S. P. (2007). Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns. European Journal of Operational Research, 180(2), 664-676.
Chiu, P.Y. (2003). Determining the optimal lot size for the finite production model with random defective rate, the rework process and backlogging. Engineering Optimization, 5, 427-437.
Chiu, Y. S. P., Chiu, S. W., & Chao, H. C. (2006). Numerical method for determination of reworking or scraping the defective items in a finite production rate model. Communications in numerical methods in engineering, 22(5), 377-386.
Peter Chiu, Y. S., Chen, K. K., Cheng, F. T., & Wu, M. F. (2010). Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown. Computers & mathematics with applications, 59(2), 919-932.
Chung, J.C., & Wee, M. H. (2010). Green-product-design and information-technology investment on replenishment model with remanufacturing. International Journal of Computer Integrated Manufacturing, 23, 466-485.
Hafshejani, K. F., Valmohammadi, C., & Khakpoor, A. (2012). Retracted: Using genetic algorithm approach to solve a multi-product EPQ model with defective items, rework, and constrained space. Journal of Industrial Engineering International, 8(1), 1-8.
Haji, B., Haji, R., & Haji, A. (2009). Optimal batch production with rework and non-zero setup cost for rework. International Conference on Computers and Industrial Engineering, 857-862.
Jamal, A. M. M., Sarker, B. R., & Mondal, S. (2004). Optimal manufacturing batch size with rework process at a single-stage production system. Computers & Industrial Engineering, 47(1), 77-89.
Jalbar, B., Gutiérrez, J. M., & Sicilia, J. (2008). Policies for a single-vendor multi-buyer system with finite production rate. Decision Support Systems, 46(1), 84-100.
Khouja, M., & Mehrez, A. (1994). An economic production lot size model with imperfect quality and variable production rate. Journal of the Operational Research Society, 45, 1405-1417.
Kim, H.C., & Hong, Y. (1999). An optimal run length in deteriorating production processes. International Journal of Production Economics, 58, 183-189.
Krishnamoorthi, C., & Panayappan, S. (2013). An EPQ model for an imperfect production system with rework and shortages. International Journal of Operations Research, 17, 104-124.
Lee, L. H., & Rosenblatt, J.M. (1987). Simultaneous determination of production cycle and inspection schedules in a production system. Management Sciences, 3, 1125-1136.
Liao, I.G., et al. (2009). Optimal economic production quantity policy for imperfect process with imperfect repair and maintenance. European Journal of Operational Research, 195,348-357.
Liu, J.J., & Yang, P. (1996). Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs. European Journal of Operational Research, 91, 517-527.
Pasandideh, S. H. R., Niaki, S. T. A., & Mirhosseyni, S. S. (2010). A parameter-tuned genetic algorithm to solve multi-product economic production quantity model with defective items, rework, and constrained space. The International Journal of Advanced Manufacturing Technology, 49(5-8), 827-837.
Rosenblatt, J.M., & Lee, L.H. (1986). Economic production cycles with imperfect production processes. IIE Transactions, 18, 48-55.
Sarkar, B., Sana, S. S., & Chaudhuri, K. (2010). Optimal reliability, production lot size and safety stock in an imperfect production system. International Journal of Mathematics in Operational Research, 2(4), 467-490.
Sarker, B. R., Jamal, A. M. M., & Mondal, S. (2008). Optimal batch sizing in a multi-stage production system with rework consideration. European Journal of Operational Research, 184(3), 915-929.
Sana, S. S., Goyal, S. K., & Chaudhuri, K. (2007). On a volume flexible inventory model for items with an imperfect production system. International Journal of Operational Research, 2(1), 64-80.
Sana, S. S., Goyal, S. K., & Chaudhuri, K. (2007a). An imperfect production process in a volume flexible inventory model. International Journal of Production Economics, 105(2), 548-559.
Sana, S.S., & Chaudhuri, S.K. (2010). An EMQ model in an imperfect production process. International Journal of Systems Science, 41, 635-646.
Sana, S.S. (2010). A production inventory model in an imperfect production process. European Journal of Operational Research, 200, 451-464.
Sana, S.S. (2010a). An economic production lot size model in an imperfect production system. European Journal of Operational Research, 201, 158-170.
Sana, S.S. (2011). A production inventory model of imperfect quality products in a three layer supply chain. Decision Support Systems, 50, 539-547.
Pal, B., Sana, S. S., & Chaudhuri, K. (2012). Three-layer supply chain–a production-inventory model for reworkable items. Applied Mathematics and Computation, 219(2), 530-543.
Wee, M.H., & Chung, J.C. (2009). Optimizing replenishment policy for an integrated production inventory deteriorating model considering green component-value design and remanufacturing. International Journal of Production Research, 47(5), 1343-1368.
Yang, P. C., & Wee, M. H. (2001). An arborescent inventory model in a supply chain system. Production Planning and Control, 12, 728-735.
Biswas, P., & Sarker, R.B. (2008). Optimal batch quantity models for a lean production system with in-cycle rework and scrap. International Journal of Production Research, 46, 6585-6610.
Cardenas, E.L., & Barron. (2007). Optimizing inventory decisions in a multi-stage multi-customer supply chain. Transportation Research, 43, 647-654.
Cardenas, E.L., & Barron. (2008). Optimal manufacturing batch size with rework in a single stage production system. Computers and Industrial Engineering, 55, 758-765.
Cardenas, E.L., & Barron. (2009b). Economic production quantity with rework process at a single stage manufacturing system with planned backorders. Computers and Industrial Engineering, 57, 1105-1113.
Chang, H. H., & Chend, T. F. (2010). Economic production quantity model with backordering, rework and machine failure taking place in stock piling time. Wseas Transactions on Information Science and Applications, 7, 463-473.
Chiu, S. W., Ting, C. K., & Chiu, Y. S. P. (2007). Optimal production lot sizing with rework, scrap rate, and service level constraint. Mathematical and Computer Modelling, 46(3), 535-549.
Chiu, S. W., Wang, S. L., & Chiu, Y. S. P. (2007). Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns. European Journal of Operational Research, 180(2), 664-676.
Chiu, P.Y. (2003). Determining the optimal lot size for the finite production model with random defective rate, the rework process and backlogging. Engineering Optimization, 5, 427-437.
Chiu, Y. S. P., Chiu, S. W., & Chao, H. C. (2006). Numerical method for determination of reworking or scraping the defective items in a finite production rate model. Communications in numerical methods in engineering, 22(5), 377-386.
Peter Chiu, Y. S., Chen, K. K., Cheng, F. T., & Wu, M. F. (2010). Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown. Computers & mathematics with applications, 59(2), 919-932.
Chung, J.C., & Wee, M. H. (2010). Green-product-design and information-technology investment on replenishment model with remanufacturing. International Journal of Computer Integrated Manufacturing, 23, 466-485.
Hafshejani, K. F., Valmohammadi, C., & Khakpoor, A. (2012). Retracted: Using genetic algorithm approach to solve a multi-product EPQ model with defective items, rework, and constrained space. Journal of Industrial Engineering International, 8(1), 1-8.
Haji, B., Haji, R., & Haji, A. (2009). Optimal batch production with rework and non-zero setup cost for rework. International Conference on Computers and Industrial Engineering, 857-862.
Jamal, A. M. M., Sarker, B. R., & Mondal, S. (2004). Optimal manufacturing batch size with rework process at a single-stage production system. Computers & Industrial Engineering, 47(1), 77-89.
Jalbar, B., Gutiérrez, J. M., & Sicilia, J. (2008). Policies for a single-vendor multi-buyer system with finite production rate. Decision Support Systems, 46(1), 84-100.
Khouja, M., & Mehrez, A. (1994). An economic production lot size model with imperfect quality and variable production rate. Journal of the Operational Research Society, 45, 1405-1417.
Kim, H.C., & Hong, Y. (1999). An optimal run length in deteriorating production processes. International Journal of Production Economics, 58, 183-189.
Krishnamoorthi, C., & Panayappan, S. (2013). An EPQ model for an imperfect production system with rework and shortages. International Journal of Operations Research, 17, 104-124.
Lee, L. H., & Rosenblatt, J.M. (1987). Simultaneous determination of production cycle and inspection schedules in a production system. Management Sciences, 3, 1125-1136.
Liao, I.G., et al. (2009). Optimal economic production quantity policy for imperfect process with imperfect repair and maintenance. European Journal of Operational Research, 195,348-357.
Liu, J.J., & Yang, P. (1996). Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs. European Journal of Operational Research, 91, 517-527.
Pasandideh, S. H. R., Niaki, S. T. A., & Mirhosseyni, S. S. (2010). A parameter-tuned genetic algorithm to solve multi-product economic production quantity model with defective items, rework, and constrained space. The International Journal of Advanced Manufacturing Technology, 49(5-8), 827-837.
Rosenblatt, J.M., & Lee, L.H. (1986). Economic production cycles with imperfect production processes. IIE Transactions, 18, 48-55.
Sarkar, B., Sana, S. S., & Chaudhuri, K. (2010). Optimal reliability, production lot size and safety stock in an imperfect production system. International Journal of Mathematics in Operational Research, 2(4), 467-490.
Sarker, B. R., Jamal, A. M. M., & Mondal, S. (2008). Optimal batch sizing in a multi-stage production system with rework consideration. European Journal of Operational Research, 184(3), 915-929.
Sana, S. S., Goyal, S. K., & Chaudhuri, K. (2007). On a volume flexible inventory model for items with an imperfect production system. International Journal of Operational Research, 2(1), 64-80.
Sana, S. S., Goyal, S. K., & Chaudhuri, K. (2007a). An imperfect production process in a volume flexible inventory model. International Journal of Production Economics, 105(2), 548-559.
Sana, S.S., & Chaudhuri, S.K. (2010). An EMQ model in an imperfect production process. International Journal of Systems Science, 41, 635-646.
Sana, S.S. (2010). A production inventory model in an imperfect production process. European Journal of Operational Research, 200, 451-464.
Sana, S.S. (2010a). An economic production lot size model in an imperfect production system. European Journal of Operational Research, 201, 158-170.
Sana, S.S. (2011). A production inventory model of imperfect quality products in a three layer supply chain. Decision Support Systems, 50, 539-547.
Pal, B., Sana, S. S., & Chaudhuri, K. (2012). Three-layer supply chain–a production-inventory model for reworkable items. Applied Mathematics and Computation, 219(2), 530-543.
Wee, M.H., & Chung, J.C. (2009). Optimizing replenishment policy for an integrated production inventory deteriorating model considering green component-value design and remanufacturing. International Journal of Production Research, 47(5), 1343-1368.
Yang, P. C., & Wee, M. H. (2001). An arborescent inventory model in a supply chain system. Production Planning and Control, 12, 728-735.