Processing, Please wait...

  • Publisher Home
  • Home
  • 🔙 Back
  • 📚 Journals
    • ⚙️ IJIEC - Industrial Engineering Computations
    • 🌐 IJDNS - Data and Network Science
    • 🧪 CCL - Current Chemistry Letters
    • 💹 AC - Accounting
    • 🎯 DSL - Decision Science Letters
    • 🚛 USCM - Uncertain Supply Chain Management
    • 🏗️ JPM - Journal of Project Management
    • 🏥 HE - Healthcare Engineering
    • 📈 SCI - Scientometrica
    • 🔩 ESM - Engineering Solid Mechanics
    • 🌿 JFS - Journal of Future Sustainability
    • 💼 MSL - Management Science Letters
  • 📝 Submit Article
  • 📊 Statistics
  • 📋 About
    • 📄 About Us
    • 📰 Blog
    • 📢 News
    • 📧 Contact
  • 📺 Tutorial
  • Search:
  • Advanced Search

Growing Science » International Journal of Industrial Engineering Computations » A two-phase fuzzy programming model for a complex bi-objective no-wait flow shop scheduling

⭐ Highly Cited Articles

  • Jaya Algorithm
  • Rao Algorithm
  • TLBO Algorithm
  • ChatGPT and Blended Learning

Journals

  • IJIEC (840)
  • IJDS (1032)
  • DSL (759)
  • ESM (434)
  • CCL (563)
  • JPM (350)
  • AC (572)
  • JFS (106)
  • MSL (2658)
  • USCM (1104)
  • HE (56)
  • SCI (53)

IJIEC Volumes

    • ▼ Volume 17 (113)
      • Issue 1 (21)
      • Issue 2 (30)
      • Issue 3 (26)
      • Issue 4 (36)
    • ▼ Volume 16 (75)
      • Issue 1 (12)
      • Issue 2 (15)
      • Issue 3 (19)
      • Issue 4 (29)
    • ▼ Volume 15 (55)
      • Issue 1 (19)
      • Issue 2 (15)
      • Issue 3 (12)
      • Issue 4 (9)
    • ▼ Volume 14 (50)
      • Issue 1 (11)
      • Issue 2 (15)
      • Issue 3 (9)
      • Issue 4 (15)
    • ▼ Volume 13 (41)
      • Issue 1 (10)
      • Issue 2 (8)
      • Issue 3 (10)
      • Issue 4 (13)
    • ▼ Volume 12 (29)
      • Issue 1 (9)
      • Issue 2 (6)
      • Issue 3 (8)
      • Issue 4 (6)
    • ▼ Volume 11 (36)
      • Issue 1 (9)
      • Issue 2 (8)
      • Issue 3 (9)
      • Issue 4 (10)
    • ▼ Volume 10 (34)
      • Issue 1 (8)
      • Issue 2 (10)
      • Issue 3 (8)
      • Issue 4 (8)
    • ▼ Volume 9 (32)
      • Issue 1 (9)
      • Issue 2 (6)
      • Issue 3 (7)
      • Issue 4 (10)
    • ▼ Volume 8 (30)
      • Issue 1 (9)
      • Issue 2 (7)
      • Issue 3 (8)
      • Issue 4 (6)
    • ▼ Volume 7 (47)
      • Issue 1 (10)
      • Issue 2 (14)
      • Issue 3 (10)
      • Issue 4 (13)
    • ▼ Volume 6 (39)
      • Issue 1 (7)
      • Issue 2 (12)
      • Issue 3 (10)
      • Issue 4 (10)
    • ▼ Volume 5 (47)
      • Issue 1 (13)
      • Issue 2 (12)
      • Issue 3 (12)
      • Issue 4 (10)
    • ▼ Volume 4 (50)
      • Issue 1 (14)
      • Issue 2 (10)
      • Issue 3 (12)
      • Issue 4 (14)
    • ▼ Volume 3 (77)
      • Issue 1 (10)
      • Issue 2 (15)
      • Issue 3 (20)
      • Issue 4 (12)
      • Issue 5 (20)
    • ▼ Volume 2 (68)
      • Issue 1 (12)
      • Issue 2 (20)
      • Issue 3 (20)
      • Issue 4 (16)
    • ▼ Volume 1 (17)
      • Issue 1 (9)
      • Issue 2 (8)

🔑 Keywords

Jordan(175)
Supply chain management(172)
Vietnam(154)
Customer satisfaction(124)
Performance(117)
Supply chain(115)
Artificial intelligence(108)
Service quality(101)
Competitive advantage(100)
SMEs(95)
Tehran Stock Exchange(94)
Sustainability(94)
optimization(88)
Financial performance(86)
TOPSIS(85)
Trust(85)
Organizational performance(81)
Job satisfaction(81)
Genetic Algorithm(81)
Social media(80)


» Show all keywords

✍️ Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(70)
Mohammad Reza Iravani(65)
Endri Endri(45)
Hotlan Siagian(43)
Muhammad Alshurideh(42)
Dmaithan Almajali(39)
Jumadil Saputra(37)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Sautma Ronni Basana(33)
Barween Al Kurdi(32)
Basrowi Basrowi(31)
Mohammad Khodaei Valahzaghard(30)
Haitham M. Alzoubi(30)
Ni Nyoman Kerti Yasa(30)
Hassan Ghodrati(30)
Shankar Chakraborty(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Mahmoud Allahham(28)


» Show all authors

🌍 Countries

1. Algeria (52)
2. Angola (2)
3. Argentina (22)
4. Armenia (2)
5. Australia (52)
6. Austria (2)
7. Bahrain (26)
8. Bangladesh (58)
9. Belarus (4)
10. Belgium (3)
11. Benin (2)
12. Benin Republic (1)
13. Bhutan (1)
14. Bosnia and Herzegovina (1)
15. Botswana (9)
16. Brazil (40)
17. Brunei (1)
18. Bulgaria (1)
19. Burkina Faso (1)
20. Cameroon (1)
Total: 121 countries

Show all countries
International Journal of Industrial Engineering Computations
ISSN 1923-2934 (Online) - ISSN 1923-2926 (Print)
Quarterly Publication
Volume 3 Issue 4 pp. 617-626, 2012

A two-phase fuzzy programming model for a complex bi-objective no-wait flow shop scheduling Pages 617-626 PDF Download PDF

Authors: Mahdi Naderi-Beni, Reza Tavakkoli-Moghaddam, Bahman Naderi, Ehsan Ghobadian, Alireza Pourrousta

📋 Author Affiliations:
Mahdi Naderi-Beni1, Reza Tavakkoli-Moghaddam ORCID 2, Bahman Naderi ORCID 3, Ehsan Ghobadian1, Alireza Pourroust1
1 Department of Industrial Engineering, Islamic Azad University, South Tehran Branch, Tehran, Iran
2 Department of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran
3 Young Researchers Club, Qazvin Branch, Islamic Azad University, Qazvin, Iran
doi 10.5267/j.ijiec.2012.03.005
7 Source: Scopus
Crossref 2 Source: CrossRef

🔑 Keywords: Flowshop, No-wait, Setup times, Removal times, bi-objective, Two phase fuzzy programming

Abstract: In this paper, we study no-wait flow shop problem where setup times depend on sequence of operations. The proposed problem considers sequence-independent removal times, release date with an additional assumption that there are some preliminary setup times. There are two objectives of weighted mean tardiness and makespan associated with the proposed model of this paper. We formulate the resulted problem as a mixed integer programming, where a two-phase fuzzy programming is implemented to solve the model. To examine the performance of the proposed model, we generate several sample data, randomly and compare the results with other methods. The preliminary results indicate that the proposed two-phase model of this paper performed relatively better than Zimmerman & apos; s single-phase fuzzy method.

How to cite this paper
APA: Naderi-Beni, M., Tavakkoli-Moghaddam, R., Naderi, B., Ghobadian, E & Pourrousta, A. (2012). A two-phase fuzzy programming model for a complex bi-objective no-wait flow shop scheduling. International Journal of Industrial Engineering Computations, 3(4), 617-626.
Chicago/Turabian: Naderi-Beni, M., Tavakkoli-Moghaddam, R., Naderi, B., Ghobadian, E & Pourrousta, A. 2012. "A two-phase fuzzy programming model for a complex bi-objective no-wait flow shop scheduling." International Journal of Industrial Engineering Computations 3, no. 4 (2012): 617-626.
AMA: Naderi-Beni, M., Tavakkoli-Moghaddam, R., Naderi, B., Ghobadian, E & Pourrousta, A. A two-phase fuzzy programming model for a complex bi-objective no-wait flow shop scheduling. International Journal of Industrial Engineering Computations. 2012;3(4):617-626.

References
Aldowaisan, T., & Allahverdi, A. (1998). Total flowtime in no-wait flowshops with separated setup times. Computers & Operation Research, 25, 757-765.

Aldowaisan, T. (2001). A new heuristic and dominance relations for no-wait flow shops with setups. Computers & Operations Research, 28, 563-584.

Allahverdi, A., Gupta, J.N.D., & Aldowaisan, T. (1999). A review of scheduling research involving setup considerations. Omega, The International Journal of Management science, 27, 219-239.

Allahvedi, A., Ng, C.T., Cheng, T.C.E., & Kovalyov, M.Y. (2008). A survey of scheduling problems with setups or costs. European Journal of Operational Research, 187, 985-1032.

Bianco, L., Dell’Olmo, P., & Giordani.S. (1999). Flowshop no-wait scheduling with sequence dependent setup times and release dates. INFOR, 37, 3-19.

Eren, T. (2007). A multicriteria flowshop scheduling problem with setup times. Journal of Materials Processing Technology, 186, 60-65.

Eren, T. (2009). A bicriteria parallel machine scheduling with a learning effect of setup and removal times. Applied Mathematical Programming, 33, 1141-1150.

Eren, T. (2010). A bicriteria m-machine flowshop scheduling with sequence-dependent setup times. Applied Mathematical Programming, 34, 284-293.

Franca, P.M., Tin, Jr.G., & Buriol, L.S. (2006). Genetic algorithms for the no-wait flowshop sequencing problem with time restrictions. International Journal of Production Research, 44(5), 939-957.

Gharegozli, A.H., Tavakkoli-Moghaddam, R., & Zaerpour, N. (2009). A fuzzy-mixed-integer goal programming model for a parallel-machine scheduling problem with sequence-dependent setup times and release dates. Robotics and Computers-Integrated Manufacturing, 25, 853-859.

Graham, R.L., Lawler, E.L., Lenstra, J.K., & Rinnooy Kan, A.H.G. (1979). Optimization and approximation in deterministic sequencing and scheduling: A survey. Annals of Discrete Mathematics, 5, 287-326.

Gupta, J.N.D., Strusevich, V.A., & Zwaneveld, C.M. (1997). Two-stage operations research models with setup and removal times separated. Computers & Operations Research, 24(11), 1025-1031.

Hall, N.G., & Sriskandarajah, C. (1996). A survey of scheduling problems with blocking and no-wait in process. Operations Research, 44, 510-525.

Ishibuchi, H., Yamamoto, M., Misaki, S., & Tanaka, H. (1994). Local search algorithms for flow shop scheduling with fuzzy due-dates. International Journal of Production Economics, 33, 53-66.

Javadi, B., Saidi-Mehrabad, M., Haji, A., Mahdavi, I., Jolai, F., & Mahdavi-Amiri, N. (2008). No-wait flow shop scheduling using fuzzy multi-objective linear programming. Journal of Franklin Institute, 345, 452-467.

Jenabi, M., Naderi, B., & Ghomi, S.M.T.F. (2010). A bi-objective case of no-wait flowshops. IEEE, Changsha, 1048-1056.

Khademi-Zare, H., & Fakhrzad, M.B. (2011). Solving flexible flow-shop problem with a hybrid genetic algorithm and data mining: A fuzzy approach. Expert Systems with Applications, 38(6), 7609-7615.

Li, X.Q., Zhang, B., & Li, H. (2006). Computing efficient solutions to fuzzy multiple objective linear programming problems. Fuzzy Sets and Systems, 157, 1328-1332.

Liu, B., Wang, L., & Jin, Y.H. (2007). An effective hybrid particle swarm optimization for no-wait flow shop scheduling. International Journal of Advanced Manufacturing Technology, 31, 1001-1011.

Mirabi, M. (2010). Ant colony optimization technique for the sequence-dependent flowshop scheduling problem. International Journal of Advanced Manufacturing Technology, 55(1-4), 317-326.

Pan, Q.K., Tasgetiren, M.F., & Liang, Y.C. (2008). A discrete particle swarm optimization algorithm for the no-wait flowshop scheduling problem. Computers & Operations Research, 35, 2807-2839.

Pinedo, M.L. (2008). Scheduling: Theory Algorithms and Systems. Third Edition, Springer.

Ruiz, R., & Allahverdi, A. (2007). No-wait flowshop with separated setup times to minimize maximum lateness. International Journal of Advanced Manufacturing Technology, 35, 551-565.

Ruiz, R., Serifoglu, F.S., & Urlings, T. (2008). Modeling realistic hybrid flexible flowshop scheduling problems. Computer & Operations Research, 35, 1151-1175.

Stafford, E.F., & Tseng, F.T. (2002). Two models for family of flowshop sequencing problems. European Journal of Operational Research, 142, 282-293.

Tavakkoli-Moghaddam, R., Javadi, B., Jolai, F., & Ghodratnama, A. (2010). The use of a fuzzy multi-objective linear programming for solving a multi-objective single machine scheduling problem. Applied Soft Computing, 10, 919-925.

Tseng, L.Y., & Lin, Y.T. (2010). A hybrid genetic algorithm for no-wait flowshop scheduling problem. International Journal of Production Economics, 128, 144-152.

Wang, C., Li, X., & Wang, Q. (2010). Accelerated tabu search for no-wait flowshop scheduling problem with maximum lateness criterion. European Journal of Operational Research, 206, 64-72.

Wang, X., & Cheng, T.C.E. (2006). A heuristic approach for two-machine no-wait flowshop scheduling with due dates and class setups. Computers & Operations Research, 33, 1326-1344.

Wu, H.C. (2010). Solving the fuzzy earliness and tardiness in scheduling problems by using genetic algorithms. Expert Systems with Applications, 37, 4860-4866.

Yao, J.S., & Feng, T.S. (2002). Constructing a fuzzy flow-shop sequencing model based on statistical data. International Journal of Approximate Reasoning, 29, 215-234.

Zimmerman.H.J., (1978), Fuzzy programming with several objective functions, Fuzzy Sets and Systems, 1, 45-55.
  • 51
  • 1
  • 2
  • 3
  • 4
  • 5

📚 Journal: International Journal of Industrial Engineering Computations | 📅 Year: 2012 | 📖 Volume: 3 | 📄 Issue: 4 | 👁️ Views: 3048 | 📊 Crossref: 2

Related Articles:
  • A new effective heuristic method for the no-wait flowshop with sequence-dependent setup times problem
  • A discrete firefly meta-heuristic with local search for makespan minimization in permutation flow shop scheduling problems
  • Some heuristics for the hybrid flow shop scheduling problem with setup and assembly operations
  • Scheduling stochastic two-machine flow shop problems to minimize expected makespan
  • An imperialist competitive algorithm for a bi-objective parallel machine scheduling problem with load balancing consideration

📝 Ready to share your research?

International Journal of Industrial Engineering Computations is accepting new submissions for upcoming issues. Join our community of authors and publish your work with us.

✓ Open access
✓ Rigorous peer review
✓ Fast publication
📤 Submit Your Manuscript →

📖 Author Guidelines

® 2010-2026 GrowingScience.Com