Processing, Please wait...

  • Home
  • About Us
  • Search:
  • Advanced Search

Growing Science » Tags cloud » No-wait

Journals

  • IJIEC (747)
  • MSL (2643)
  • DSL (668)
  • CCL (508)
  • USCM (1092)
  • ESM (413)
  • AC (562)
  • JPM (271)
  • IJDS (912)
  • JFS (91)
  • HE (26)
  • SCI (26)

Keywords

Supply chain management(166)
Jordan(161)
Vietnam(149)
Customer satisfaction(120)
Performance(113)
Supply chain(110)
Service quality(98)
Competitive advantage(95)
Tehran Stock Exchange(94)
SMEs(87)
optimization(86)
Trust(83)
Financial performance(83)
Sustainability(81)
TOPSIS(81)
Job satisfaction(80)
Factor analysis(78)
Social media(78)
Genetic Algorithm(77)
Knowledge Management(77)


» Show all keywords

Authors

Naser Azad(82)
Mohammad Reza Iravani(64)
Zeplin Jiwa Husada Tarigan(62)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(39)
Jumadil Saputra(36)
Dmaithan Almajali(36)
Muhammad Turki Alshurideh(35)
Barween Al Kurdi(32)
Ahmad Makui(32)
Basrowi Basrowi(31)
Hassan Ghodrati(31)
Mohammad Khodaei Valahzaghard(30)
Sautma Ronni Basana(29)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)
Haitham M. Alzoubi(27)


» Show all authors

Countries

Iran(2181)
Indonesia(1289)
Jordan(786)
India(786)
Vietnam(504)
Saudi Arabia(452)
Malaysia(441)
United Arab Emirates(220)
China(206)
Thailand(153)
United States(110)
Turkey(106)
Ukraine(104)
Egypt(98)
Canada(92)
Peru(88)
Pakistan(85)
United Kingdom(80)
Morocco(79)
Nigeria(78)


» Show all countries
Sort articles by: Volume | Date | Most Rates | Most Views | Reviews | Alphabet
1.

A hybrid artificial bee colony algorithm with an iterated local search mechanism for distributed no-wait flowshop problems with preventive maintenance Pages 307-322 Right click to download the paper Download PDF

Authors: Chuan-Chong Li, Yuan-Zhen Li, Lei-Lei Meng, Biao Zhang

DOI: 10.5267/j.ijiec.2025.2.003

Keywords: Distributed permutation flowshop scheduling, Makespan, No-wait, Preventive maintenance, Artificial bee colony algorim

Abstract:
In this paper, a distributed no-wait permutation flowshop scheduling problem with a preventive maintenance operation (PM/DNWPFSP) is investigated. A mixed-integer linear programming model for the PM/DNWPFSP is established. The problem characteristics and preventive maintenance characteristics of the PM/DNWPFSP are analyzed, and an accelerated calculation method of the completion time is proposed. A hybrid artificial bee colony (HABC) algorithm with an iterated local search mechanism for neighborhood search is proposed. To improve the quality of the solution, the shift, the swap and the hybrid operators are conducted in the critical factory. A local search operator based on the shift, the swap and the hybrid operators is proposed to jump out of local optima. A large number of experiments are conducted to evaluate the performance of the proposed HABC. The experimental results show that the proposed HABC algorithm has many promising advantages in solving the PM/DNWPFSP.
Details
  • 0
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2025 | Volume: 16 | Issue: 2 | Views: 319 | Reviews: 0

 
2.

More effective heuristics for a two-machine no-wait flowshop to minimize maximum lateness Pages 543-556 Right click to download the paper Download PDF

Authors: Harun Aydilek, Asiye Aydilek, Muberra Allahverdi, Ali Allahverdi

DOI: 10.5267/j.ijiec.2022.7.002

Keywords: Flowshop scheduling, Uncertain setup times, No-wait, Maximum lateness, Dominance relations, Heuristics

Abstract:
We address a manufacturing environment with the no-wait constraint which is common in industries such as metal, plastic, and semiconductor. Setup times are modelled as uncertain with the objective of minimizing maximum lateness which is an important performance measure for customer satisfaction. This problem has been addressed in scheduling literature for the two-machine no-wait flowshop where dominance relations were presented. Recently, another dominance relation was presented and shown to be about 90% more efficient than the earlier ones. In the current paper, we propose two new dominance relations, which are less restrictive than the earlier ones in the literature. The new dominance relations are shown to be 140% more efficient than the most recent one in the literature. As the level of uncertainty increases, the newly proposed dominance relation performs better, which is another strength of the newly proposed dominance relation. Moreover, we also propose constructive heuristics and show that the best of the newly proposed heuristics is 95% more efficient than the existing one in the literature under the same CPU time.
Details
  • 0
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2022 | Volume: 13 | Issue: 4 | Views: 1231 | Reviews: 0

 
3.

An algorithm for a no-wait flowshop scheduling problem for minimizing total tardiness with a constraint on total completion time Pages 43-50 Right click to download the paper Download PDF

Authors: Ali Allahverdi, Harun Aydilek, Asiye Aydilek

DOI: 10.5267/j.ijiec.2021.8.003

Keywords: Algorithm, Scheduling, Statistical analysis, No-wait

Abstract:
We consider a no-wait m-machine flowshop scheduling problem which is common in different manufacturing industries such as steel, pharmaceutical, and chemical. The objective is to minimize total tardiness since it minimizes penalty costs and loss of customer goodwill. We also consider the performance measure of total completion time which is significant in environments where reducing holding cost is important. We consider both performance measures with the objective of minimizing total tardiness subject to the constraint that total completion time is bounded. Given that the problem is NP-hard, we propose an algorithm. We conduct extensive computational experiments to compare the performance of the proposed algorithm with those of three well performing benchmark algorithms in the literature. Computational results indicate that the proposed algorithm reduces the error of the best existing benchmark algorithm by 88% under the same CPU times. The results are confirmed by extensive statistical analysis. Specifically, ANOVA analysis is conducted to justify the difference between the performances of the algorithms, and a test of hypothesis is performed to justify that the proposed algorithm is significantly better than the best existing benchmark algorithm with a significance level of 0.01.
Details
  • 0
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2022 | Volume: 13 | Issue: 1 | Views: 1417 | Reviews: 0

 
4.

An improved algorithm to minimize the total completion time in a two-machine no-wait flow-shop with uncertain setup times Pages 1-12 Right click to download the paper Download PDF

Authors: Muberra Allahverdi

DOI: 10.5267/j.jpm.2021.9.001

Keywords: Flowshop scheduling, No-wait, Setup time, Uncertainty, Total completion time

Abstract:
Since scheduling literature has a wide range of uncertainties, it is crucial to take these into account when solving performance measure problems. Otherwise, the performance may severely be affected in a negative way. In this paper, an algorithm is proposed to minimize the total completion time (TCT) of a two-machine no-wait flowshop with uncertain setup times within lower and upper bounds. The results are compared to the best existing algorithm in scheduling literature: the programming language Python is used to generate random samples with respect to various distributions, and the TCT of the proposed algorithm is compared to that of the best existing one. Results reveal that the proposed one significantly outperforms the best one given in literature for all considered distributions. Specifically, the average percentage improvement of the proposed algorithm over the best existing one is over 90%. A test of hypothesis is conducted to further confirm the results.
Details
  • 17
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2022 | Volume: 7 | Issue: 1 | Views: 1069 | Reviews: 0

 
5.

A two-phase fuzzy programming model for a complex bi-objective no-wait flow shop scheduling Pages 617-626 Right click to download the paper Download PDF

Authors: Mahdi Naderi-Beni, Reza Tavakkoli-Moghaddam, Bahman Naderi, Ehsan Ghobadian, Alireza Pourrousta

DOI: 10.5267/j.ijiec.2012.03.005

Keywords: Flowshop, No-wait, Setup times, Removal times, bi-objective, Two phase fuzzy programming

Abstract:
In this paper, we study no-wait flow shop problem where setup times depend on sequence of operations. The proposed problem considers sequence-independent removal times, release date with an additional assumption that there are some preliminary setup times. There are two objectives of weighted mean tardiness and makespan associated with the proposed model of this paper. We formulate the resulted problem as a mixed integer programming, where a two-phase fuzzy programming is implemented to solve the model. To examine the performance of the proposed model, we generate several sample data, randomly and compare the results with other methods. The preliminary results indicate that the proposed two-phase model of this paper performed relatively better than Zimmerman & apos; s single-phase fuzzy method.