Growing Science » Authors » Ming-Hon Hwang
Authors: Singa Wang Chiu, Victoria Chiu, Ming-Hon Hwang, Yuan-Shyi Peter Chiu
DOI: 10.5267/j.ijiec.2021.1.001
Keywords: Multiproduct batch manufacturing, Delayed differentiation, Overtime, Outsourcing, Quality reassurance
Journal: IJIEC | Year: 2021 | Volume: 12 | Issue: 2 | Views: 1356 | Reviews: 0
Authors: Yuan-Shyi Peter Chiu, Victoria Chiu, Yunsen Wang, Ming-Hon Hwang
DOI: 10.5267/j.ijiec.2020.6.001
Keywords: Multiproduct replenishment decision, Postponement, Overtime, Product quality reassurance, Commonality, Common cycle time
Journal: IJIEC | Year: 2020 | Volume: 11 | Issue: 4 | Views: 1555 | Reviews: 0
Authors: Yuan-Shyi Peter Chiu, Hui-Cun Chen, Huei-Hsin Chang, Ming-Hon Hwang
DOI: 10.5267/j.ijiec.2019.4.001
Keywords: Multi-item fabrication, External provider, Rework, Vendor-buyer integrated system, Rotation cycle, Intra-supply chain, Distribution frequency
Journal: IJIEC | Year: 2019 | Volume: 10 | Issue: 4 | Views: 1422 | Reviews: 0
Authors: Hong-Dar Lin, Tiffany Chiu, Ming-Hon Hwang, Yuan-Shyi Peter Chiu
DOI: 10.5267/j.uscm.2022.2.007
Keywords: Multi-item system, Fabrication-shipment policy, Scrap, Rework, Multi-delivery, Overtime
Journal: USCM | Year: 2022 | Volume: 10 | Issue: 3 | Views: 710 | Reviews: 0
® 2010-2024 GrowingScience.Com