How to cite this paper
Jalilibal, Z., Bozorgi-Amiri, A & Khosravi, R. (2018). A hybrid lexicographic and VIKOR approach for prioritizing construction projects by considering sustainable development criteria.Journal of Project Management, 3(3), 131-142.
Refrences
Abdollahi, M., Arvan, M., & Razmi, J. (2015). An integrated approach for supplier portfolio selection: Lean or agile? Expert Systems with Applications, 42(1), 679-690.
Amiri, M. P. (2010). Project selection for oil-fields development by using the AHP and fuzzy TOPSIS methods. Expert Systems with Applications, 37(9), 6218-6224.
Arbel, A., & Vargas, L. G. (1993). Preference simulation and preference programming: robustness issues in priority derivation. European Journal of Operational Research, 69(2), 200-209.
Baynal, K., Sarı, T., & Koçdağ, V. (2016). A combined AHP-PROMETHEE approach for project selection and a case study in the Turkish textile industry. European Journal of Business and Social Sciences, 5(01), 202-216.
Charnes, A., Clark, C. T., Cooper, W. W., & Golany, B. (1984). A developmental study of data en-velopment analysis in measuring the efficiency of maintenance units in the US air forces. Annals of Operations Research, 2(1), 95-112.
Duckstein, L., & Opricovic, S. (1980). Multiobjective optimization in river basin development. Water Resources Research, 16(1), 14-20.
Hwang, C.L., & Yoon, K. (1981). Multiple Attribute Decision Making: Methods and Applications. New York: Springer-Verlag.
Jabbarzadeh, A. (2018). Application of the AHP and TOPSIS in project management. Journal of Project Management, 3(2), 125-130.
Khalili-Damghani, K., Sadi-Nezhad, S., Lotfi, F. H., & Tavana, M. (2013). A hybrid fuzzy rule-based multi-criteria framework for sustainable project portfolio selection. Information Sciences, 220, 442-462.
Opricovic, S., & Tzeng, G. H. (2007). Extended VIKOR method in comparison with outranking methods. European journal of operational research, 178(2), 514-529.
Pangsri, P. (2015). Application of the multi criteria decision making methods for project selection. Universal Journal of Management, 3(1), 15-20.
Rahmani, N., Talebpour, A., & Ahmadi, T. (2012). Developing a multi criteria model for stochastic IT portfolio selection by AHP method. Procedia-Social and Behavioral Sciences, 62, 1041-1045.
Rathi, R., Khanduja, D., & Sharma, S. (2016). A fuzzy MADM approach for project selection: a six sigma case study. Decision Science Letters, 5(2), 255-268.
Saaty, T. L. (1989). Group decision making and the AHP. In The analytic hierarchy process (pp. 59-67). Springer, Berlin, Heidelberg.
Saaty, T. L. (2013). Analytic network process. Encyclopedia of operations research and management science, 64-72.
Sadjadi, S., & Sadi-Nezhad, S. (2017). Ranking Canadian oil and gas projects using TOPSIS. Journal of Project Management, 2(3), 87-92.
Salehi, K. (2015). A hybrid fuzzy MCDM approach for project selection problem. Decision Science Letters, 4(1), 109-116.
Siew, R. Y. J. (2016). Integrating sustainability into construction project portfolio management. KSCE Journal of Civil Engineering, 20(1), 101-108.
Taylan, O., Bafail, A. O., Abdulaal, R. M., & Kabli, M. R. (2014). Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies. Applied Soft Computing, 17, 105-116.
Wang, N., Wei, K., & Sun, H. (2013). Whole life project management approach to sustainability. Journal of Management in Engineering, 30(2), 246-255.
Xing, Y., Horner, R. M. W., El-Haram, M. A., & Bebbington, J. (2009). A framework model for assessing sustainability impacts of urban development. Paper presented at the Accounting Forum.
Yousefi, A., & Hadi-Vencheh, A. (2016). Selecting six sigma projects: MCDM or DEA? Journal of Modelling in Management, 11(1), 309-325.
Yu, P. L. (1973). A class of solutions for group decision problems. Management Science, 19(8), 936-946.
Amiri, M. P. (2010). Project selection for oil-fields development by using the AHP and fuzzy TOPSIS methods. Expert Systems with Applications, 37(9), 6218-6224.
Arbel, A., & Vargas, L. G. (1993). Preference simulation and preference programming: robustness issues in priority derivation. European Journal of Operational Research, 69(2), 200-209.
Baynal, K., Sarı, T., & Koçdağ, V. (2016). A combined AHP-PROMETHEE approach for project selection and a case study in the Turkish textile industry. European Journal of Business and Social Sciences, 5(01), 202-216.
Charnes, A., Clark, C. T., Cooper, W. W., & Golany, B. (1984). A developmental study of data en-velopment analysis in measuring the efficiency of maintenance units in the US air forces. Annals of Operations Research, 2(1), 95-112.
Duckstein, L., & Opricovic, S. (1980). Multiobjective optimization in river basin development. Water Resources Research, 16(1), 14-20.
Hwang, C.L., & Yoon, K. (1981). Multiple Attribute Decision Making: Methods and Applications. New York: Springer-Verlag.
Jabbarzadeh, A. (2018). Application of the AHP and TOPSIS in project management. Journal of Project Management, 3(2), 125-130.
Khalili-Damghani, K., Sadi-Nezhad, S., Lotfi, F. H., & Tavana, M. (2013). A hybrid fuzzy rule-based multi-criteria framework for sustainable project portfolio selection. Information Sciences, 220, 442-462.
Opricovic, S., & Tzeng, G. H. (2007). Extended VIKOR method in comparison with outranking methods. European journal of operational research, 178(2), 514-529.
Pangsri, P. (2015). Application of the multi criteria decision making methods for project selection. Universal Journal of Management, 3(1), 15-20.
Rahmani, N., Talebpour, A., & Ahmadi, T. (2012). Developing a multi criteria model for stochastic IT portfolio selection by AHP method. Procedia-Social and Behavioral Sciences, 62, 1041-1045.
Rathi, R., Khanduja, D., & Sharma, S. (2016). A fuzzy MADM approach for project selection: a six sigma case study. Decision Science Letters, 5(2), 255-268.
Saaty, T. L. (1989). Group decision making and the AHP. In The analytic hierarchy process (pp. 59-67). Springer, Berlin, Heidelberg.
Saaty, T. L. (2013). Analytic network process. Encyclopedia of operations research and management science, 64-72.
Sadjadi, S., & Sadi-Nezhad, S. (2017). Ranking Canadian oil and gas projects using TOPSIS. Journal of Project Management, 2(3), 87-92.
Salehi, K. (2015). A hybrid fuzzy MCDM approach for project selection problem. Decision Science Letters, 4(1), 109-116.
Siew, R. Y. J. (2016). Integrating sustainability into construction project portfolio management. KSCE Journal of Civil Engineering, 20(1), 101-108.
Taylan, O., Bafail, A. O., Abdulaal, R. M., & Kabli, M. R. (2014). Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies. Applied Soft Computing, 17, 105-116.
Wang, N., Wei, K., & Sun, H. (2013). Whole life project management approach to sustainability. Journal of Management in Engineering, 30(2), 246-255.
Xing, Y., Horner, R. M. W., El-Haram, M. A., & Bebbington, J. (2009). A framework model for assessing sustainability impacts of urban development. Paper presented at the Accounting Forum.
Yousefi, A., & Hadi-Vencheh, A. (2016). Selecting six sigma projects: MCDM or DEA? Journal of Modelling in Management, 11(1), 309-325.
Yu, P. L. (1973). A class of solutions for group decision problems. Management Science, 19(8), 936-946.