How to cite this paper
Gharakhani, M., Taghipour, T & Farahani, K. (2010). A robust multi-objective production planning.International Journal of Industrial Engineering Computations , 1(1), 73-78.
Refrences
Ben-Tal, A., & Nemirovski, A. (2000). Robust solutions of linear programming problems contaminated with uncertain data. Mathematical Programming, 88, 411- 421.
Bertsimas, D., & Sim, M. (2003). Robust discrete optimization and network flows, Mathematical Programming Series B, 98, 49-71.
Kenné J P, Gharbi, A, Beit, M. (2007). Age-dependent production planning and maintenance strategies in unreliable manufacturing systems with lost sale, European Journal of Operational Research, 178, 408-420.
Khademi Zare H, Fatemi Ghomi S M T, Karimi B (2006), Developing a heuristic algorithm for order production planning using network models under uncertainty conditions, Applied Mathematics and Computation, 182, 1208-1218.
Misra KB. (1972), Reliability optimization of series–parallel system, IEEE Transaction on Reliability, 21,230–8.
Nikoofal, M E, Sadjadi, S. J. (2010). A robust optimization model for p-median problem with uncertain edge lengths, International Journal of Advanced Manufacturing Technology, to appear.
Ramirez-Marquez JE, Coit DW, Konak A (2004). Redundancy allocation for serie- s–parallel systems using a max–min approach, IIE Transaction, 36, 891–898.
Sadjadi, S.J., & Omrani, H. (2008). Data envelopment analysis with uncertain data: An application for Iranian electricity distribution companies, Energy Policy, 36, 4247– 4254.
Shafia, M. A., Sadjadi, S. J. & Jamili, A. (2010). Robust train formation, Journal of Rail and Rapid Transit, 224, 75-90.
Soyster, A. L. (1973). Convex programming with eet-inclusive constraints and applications to inexact linear programming, Operations Research, 21, 1154-1157.
Sadjadi, S J, Habibian, H & Khaledi, V. (2009). A multi-objective decision making approach for solving quadratic multiple response surface problems, International Journal of Contemporary Mathematical Sciences, 3, 1595-1606.
Sadjadi, S J, Soltani, R, (2009). An efficient heuristic versus a robust hybrid meta-heuristic for general framework of serial-parallel redundancy problem. Reliability Engineering and System Safety, 94, 1703-1710.
Bertsimas, D., & Sim, M. (2003). Robust discrete optimization and network flows, Mathematical Programming Series B, 98, 49-71.
Kenné J P, Gharbi, A, Beit, M. (2007). Age-dependent production planning and maintenance strategies in unreliable manufacturing systems with lost sale, European Journal of Operational Research, 178, 408-420.
Khademi Zare H, Fatemi Ghomi S M T, Karimi B (2006), Developing a heuristic algorithm for order production planning using network models under uncertainty conditions, Applied Mathematics and Computation, 182, 1208-1218.
Misra KB. (1972), Reliability optimization of series–parallel system, IEEE Transaction on Reliability, 21,230–8.
Nikoofal, M E, Sadjadi, S. J. (2010). A robust optimization model for p-median problem with uncertain edge lengths, International Journal of Advanced Manufacturing Technology, to appear.
Ramirez-Marquez JE, Coit DW, Konak A (2004). Redundancy allocation for serie- s–parallel systems using a max–min approach, IIE Transaction, 36, 891–898.
Sadjadi, S.J., & Omrani, H. (2008). Data envelopment analysis with uncertain data: An application for Iranian electricity distribution companies, Energy Policy, 36, 4247– 4254.
Shafia, M. A., Sadjadi, S. J. & Jamili, A. (2010). Robust train formation, Journal of Rail and Rapid Transit, 224, 75-90.
Soyster, A. L. (1973). Convex programming with eet-inclusive constraints and applications to inexact linear programming, Operations Research, 21, 1154-1157.
Sadjadi, S J, Habibian, H & Khaledi, V. (2009). A multi-objective decision making approach for solving quadratic multiple response surface problems, International Journal of Contemporary Mathematical Sciences, 3, 1595-1606.
Sadjadi, S J, Soltani, R, (2009). An efficient heuristic versus a robust hybrid meta-heuristic for general framework of serial-parallel redundancy problem. Reliability Engineering and System Safety, 94, 1703-1710.