How to cite this paper
Salam, A., Defersha, F & Bhuiyan, N. (2012). A case study to estimate costs using Neural Networks and regression based models.Decision Science Letters , 1(1), 1-10.
Refrences
Assaf, S. A. & Al-Hejji, S. (2006).Causes of delay in large construction projects. International Journal of Project Management, 24 (4), 349-356.
Colmer, G., Dunkley, M., Gray, K., Pugh, P., & Williamson, A. (1999). Estimating the cost of new technology products. International Journal of Technology Management, 17(7-8), 840-846.
Bashir, H. A., & Thomson, V. (2004). Estimating design effort for GE hydro projects. Computer & Industrial Engineering, 46(2), 195-204.
Boehm, B. W. (1981). Software Engineering Economy. New Jersey: Prentice-Hall Inc.
Bounds, G. (1998). The last word on project management. IIE Solutions, 30(11), 41-43.
Frimpong, Y. (2000). Project management in developing countries: causes of delay and cost overruns in construction of groundwater projects. Masters Research Project: University of Technology, Sydney, Australia.
Huang, S. C., & Huang, Y.-F. (1991). Bounds on the numbers of neurons in multilayer perceptrons. IEEE Transaction on Neural Networks, 2: 47 – 55.
Kecman, V.(2001). Learning and Soft Computing. Cambridge: MIT Press.
Kutner, M.H., Nachtsheim, C. J., Neter, J., & Li, W.(2004). Applied Linear Statistical Models(5th Edition), New York: McGraw-Hill/Irwin.
Muralidhar, K., Parsa, R., & Sarathy, R.(1999).A general additive data perturbation method for database security. Management Science, 45(10), 1399-1415.
Murmann, P. A. (1994). Expected development time reductions in the German mechanical engineering industry. Journal of Product Innovation Management, 11 (3), 236-252.
Norris, K.P. (1971). The Accuracy of project cost and duration estimates in industrial R & D. R & D Management, 2 (1), 25-36.
Pandya, A. S. & Macy, R. B. (1996). Pattern Recognition with Neural Networks in C++.Florida: CRC Press.
Salam, A., Bhuiyan, N., Gouw, G.J., & Raza, S. A. (2009).Estimating design effort for the compressor design department: A case study at Pratt & Whitney Canada. Design Studies, 30(3), 303-319.
Salam, A.M., Bhuiyan, N.F., Gouw, G.J., & Raza, S. A. (2008). A case study to estimate design effort for Pratt & Whitney Canada. International Journal of Management Science and Engineering Management, 3 (4), 284-293.
Salam, A., Bhuiyan, N., Gouw, G., & Raza, A. (2008). Measuring Design Effort in Product Development. Germany: VDM Verlag.
Snyman, J. A. (2005). Practical mathematical optimization: an introduction to basic optimization theory and classical and new gradient-based algorithms. New York: Springer.
Walston, C. E., & Felix, C. P. (1977). A method of programming measurement and estimation. IBM System Journal, 16(1), 54-73.
Colmer, G., Dunkley, M., Gray, K., Pugh, P., & Williamson, A. (1999). Estimating the cost of new technology products. International Journal of Technology Management, 17(7-8), 840-846.
Bashir, H. A., & Thomson, V. (2004). Estimating design effort for GE hydro projects. Computer & Industrial Engineering, 46(2), 195-204.
Boehm, B. W. (1981). Software Engineering Economy. New Jersey: Prentice-Hall Inc.
Bounds, G. (1998). The last word on project management. IIE Solutions, 30(11), 41-43.
Frimpong, Y. (2000). Project management in developing countries: causes of delay and cost overruns in construction of groundwater projects. Masters Research Project: University of Technology, Sydney, Australia.
Huang, S. C., & Huang, Y.-F. (1991). Bounds on the numbers of neurons in multilayer perceptrons. IEEE Transaction on Neural Networks, 2: 47 – 55.
Kecman, V.(2001). Learning and Soft Computing. Cambridge: MIT Press.
Kutner, M.H., Nachtsheim, C. J., Neter, J., & Li, W.(2004). Applied Linear Statistical Models(5th Edition), New York: McGraw-Hill/Irwin.
Muralidhar, K., Parsa, R., & Sarathy, R.(1999).A general additive data perturbation method for database security. Management Science, 45(10), 1399-1415.
Murmann, P. A. (1994). Expected development time reductions in the German mechanical engineering industry. Journal of Product Innovation Management, 11 (3), 236-252.
Norris, K.P. (1971). The Accuracy of project cost and duration estimates in industrial R & D. R & D Management, 2 (1), 25-36.
Pandya, A. S. & Macy, R. B. (1996). Pattern Recognition with Neural Networks in C++.Florida: CRC Press.
Salam, A., Bhuiyan, N., Gouw, G.J., & Raza, S. A. (2009).Estimating design effort for the compressor design department: A case study at Pratt & Whitney Canada. Design Studies, 30(3), 303-319.
Salam, A.M., Bhuiyan, N.F., Gouw, G.J., & Raza, S. A. (2008). A case study to estimate design effort for Pratt & Whitney Canada. International Journal of Management Science and Engineering Management, 3 (4), 284-293.
Salam, A., Bhuiyan, N., Gouw, G., & Raza, A. (2008). Measuring Design Effort in Product Development. Germany: VDM Verlag.
Snyman, J. A. (2005). Practical mathematical optimization: an introduction to basic optimization theory and classical and new gradient-based algorithms. New York: Springer.
Walston, C. E., & Felix, C. P. (1977). A method of programming measurement and estimation. IBM System Journal, 16(1), 54-73.