Processing, Please wait...

  • Home
  • 📚 Journals
    • ⚙️ IJIEC - Industrial Engineering Computations
    • 🌐 IJDNS - Data and Network Science
    • 🧪 CCL - Current Chemistry Letters
    • 📊 AC - Accounting
    • 🎯 DSL - Decision Science Letters
    • 🚛 USCM - Uncertain Supply Chain Management
    • 🏗️ JPM - Journal of Project Management
    • 🏥 HE - Healthcare Engineering
    • 📈 SCI - Scientometrica
    • 🔩 ESM - Engineering Solid Mechanics
    • 🌱 JFS - Journal of Future Sustainability
    • 💼 MSL - Management Science Letters
  • 📝 Submit Article
  • 📊 Statistics
  • 📋 About
    • 📄 About Us
    • 📰 Blog
    • 📢 News
    • 📧 Contact
  • 📺 Tutorial
  • Search:
  • Advanced Search

Growing Science » International Journal of Industrial Engineering Computations » A branch and bound for single machine stochastic scheduling to minimize the maximum lateness

📚 Highly Cited Articles

  • Jaya Algorithm
  • Rao Algorithm
  • TLBO Algorithm
  • Discrete Firefly
  • ChatGPT and Blended Learning

Journals

  • IJIEC (803)
  • MSL (2648)
  • DSL (722)
  • CCL (544)
  • USCM (1099)
  • ESM (428)
  • AC (562)
  • JPM (323)
  • IJDS (992)
  • JFS (101)
  • HE (42)
  • SCI (41)

IJIEC Volumes

    • Volume 17 (77)
      • Issue 1 (21)
      • Issue 2 (30)
      • Issue 3 (26)
    • Volume 16 (75)
      • Issue 1 (12)
      • Issue 2 (15)
      • Issue 3 (19)
      • Issue 4 (29)
    • Volume 15 (55)
      • Issue 1 (19)
      • Issue 2 (15)
      • Issue 3 (12)
      • Issue 4 (9)
    • Volume 14 (50)
      • Issue 1 (11)
      • Issue 2 (15)
      • Issue 3 (9)
      • Issue 4 (15)
    • Volume 13 (41)
      • Issue 1 (10)
      • Issue 2 (8)
      • Issue 3 (10)
      • Issue 4 (13)
    • Volume 12 (29)
      • Issue 1 (9)
      • Issue 2 (6)
      • Issue 3 (8)
      • Issue 4 (6)
    • Volume 11 (36)
      • Issue 1 (9)
      • Issue 2 (8)
      • Issue 3 (9)
      • Issue 4 (10)
    • Volume 10 (34)
      • Issue 1 (8)
      • Issue 2 (10)
      • Issue 3 (8)
      • Issue 4 (8)
    • Volume 9 (32)
      • Issue 1 (9)
      • Issue 2 (6)
      • Issue 3 (7)
      • Issue 4 (10)
    • Volume 8 (30)
      • Issue 1 (9)
      • Issue 2 (7)
      • Issue 3 (8)
      • Issue 4 (6)
    • Volume 7 (47)
      • Issue 1 (10)
      • Issue 2 (14)
      • Issue 3 (10)
      • Issue 4 (13)
    • Volume 6 (39)
      • Issue 1 (7)
      • Issue 2 (12)
      • Issue 3 (10)
      • Issue 4 (10)
    • Volume 5 (47)
      • Issue 1 (13)
      • Issue 2 (12)
      • Issue 3 (12)
      • Issue 4 (10)
    • Volume 4 (50)
      • Issue 1 (14)
      • Issue 2 (10)
      • Issue 3 (12)
      • Issue 4 (14)
    • Volume 3 (76)
      • Issue 1 (9)
      • Issue 2 (15)
      • Issue 3 (20)
      • Issue 4 (12)
      • Issue 5 (20)
    • Volume 2 (68)
      • Issue 1 (12)
      • Issue 2 (20)
      • Issue 3 (20)
      • Issue 4 (16)
    • Volume 1 (17)
      • Issue 1 (9)
      • Issue 2 (8)

🔑 Keywords

Supply chain management(168)
Jordan(167)
Vietnam(154)
Customer satisfaction(124)
Performance(116)
Supply chain(113)
Artificial intelligence(98)
Competitive advantage(98)
Service quality(98)
Tehran Stock Exchange(94)
SMEs(92)
Sustainability(91)
optimization(88)
Trust(84)
Financial performance(84)
TOPSIS(84)
Job satisfaction(81)
Genetic Algorithm(80)
Knowledge Management(80)
Social media(79)


» Show all keywords

✍️ Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(67)
Mohammad Reza Iravani(64)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(40)
Dmaithan Almajali(38)
Jumadil Saputra(36)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Barween Al Kurdi(32)
Hassan Ghodrati(31)
Basrowi Basrowi(31)
Sautma Ronni Basana(31)
Haitham M. Alzoubi(30)
Mohammad Khodaei Valahzaghard(30)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)


» Show all authors

🌍 Countries

1. Algeria (52)
2. Angola (1)
3. Argentina (22)
4. Armenia (2)
5. Australia (52)
6. Austria (2)
7. Bahrain (26)
8. Bangladesh (56)
9. Belarus (3)
10. Belgium (3)
11. Benin (2)
12. Benin Republic (1)
13. Bhutan (1)
14. Bosnia and Herzegovina (1)
15. Botswana (8)
16. Brazil (39)
17. Brunei (1)
18. Bulgaria (1)
19. Burkina Faso (1)
20. Cameroon (1)
Total: 121 countries

Show all countries

International Journal of Industrial Engineering Computations

ISSN 1923-2934 (Online) - ISSN 1923-2926 (Print)
Quarterly Publication
Volume 3 Issue 3 pp. 499-510 , 2012

A branch and bound for single machine stochastic scheduling to minimize the maximum lateness Pages 499-510 Right click to download the paper Download PDF

Authors: Hamidreza Haddad, Mohammad Ebrahim Arbabian, Keyvan Kamandani Pour

doi 10.5267/j.ijiec.2011.11.001
Crossmark

Keywords: Deterioration, Single machine, Stochastic scheduling, Tardy jobs

Abstract: This paper studies the problem of single machine stochastic scheduling with random processing times, deterministic due dates and an independent setup time. The jobs are also deteriorated based on the position, which their processes are done. The objective function is to find a schedule of jobs, which minimizes the expected value of maximum lateness. A branch and bound scheme is presented to solve the problem analytically and a simulated annealing meta-heuristic (SA) is also provided for solving the problem in larger scales. Computational experiments demonstrate that the proposed SA is capable of finding near optimal solutions with very low gap.

How to cite this paper

Haddad, H., Arbabian, M & Pour, K. (2012). A branch and bound for single machine stochastic scheduling to minimize the maximum lateness.International Journal of Industrial Engineering Computations , 3(3), 499-510.

References
Balut, S. (1973). Scheduling to minimize the number of late jobs when set-up and processing times are uncertain. Management Science, 19, 1283–1288.

Cai, X., & Zhou, S. (1997). Scheduling stochastic jobs with asymmetric earliness and tardiness penalties. Naval Research Logistics, 44, 531–557.

Chang, C., & Yao, D. (1993). Rearrangement, majorization and stochastic scheduling. Mathematics of Operations Research, 18, 658–684.

Cheng, T. (1986). Optimal due-date assignment for a single machine sequencing problem with random processing times. International Journal of Systems Science, 17, 1039-1144.

Cheng, T. (1991). Optimal assignment of slack due-dates and sequencing of jobs with random processing times on a single machine. European Journal of Operational Research, 51, 348-353.

De, P., Ghosh, E., & Wells, E. (1991). On the minimization of the weighted number of tardy jobs with random processing times and deadline. Computers and Operations Research, 18, 457–463.

Gutjahr ,W., & Pflug, G. (1996). Simulated annealing for noisy cost functions. Journal of Global Optimization, 8, 1-13.

Gutjahr, W., Hellmayr, A., & Pflug, G. (1999). Optimal stochastic single-machine-tardiness scheduling by stochastic branch-and-bound. European Journal of Operational Research, 117, 396-413.

Jang, W. (2002). Dynamic scheduling of stochastic jobs on a single machine. European Journal of Operational Research, 138, 518–530.

Norkin, I., Ermoliev, Y., & Ruszczynski, A. (1994.). On optimal allocations of indivisibles under uncertainty. Austria: Laxenburg.

Pinedo, M. (1983). Stochastic scheduling with release dates and due dates. Operations Research, 31, 559–572.

Portougal, V., & Trietsch, D. (2006). Setting due dates in a stochastic single machine environment. Computers & Operations Research, 33, 1681–1694.

Sarin S. C, Erel, E., Steiner, G. (1991). Sequencing jobs on a single machine with a common due dates and stochastic processing times. European Journal of Operational Research, 51, 188–198.

Seo, D., Klein, C., & Jang, W. (2005). Single machine stochastic scheduling to minimize the expected number of tardy jobs using mathematical programming models. Computers & Industrial Engineering, 48, 153–161.

Soroush, H., & Fredendall, L. (1994). The stochastic single machine scheduling problem with earliness and tardiness costs. European Journal of Operational Research, 77, 287–302.

Soroush, H. (2007). Minimizing the weighted number of early and tardy jobs in a stochastic single machine scheduling problem. European Journal of Operational Research, 181, 266–287.

Soroush, H., (2010). Solving a stochastic single machine problem with initial idle time and quadratic objective. Computers & Operations Research, 37, 1328–1347.

Soroush, H., (1999). Sequencing and due-date determination in the stochastic single machine problem with earliness and tardiness costs. European Journal of Operational Research, 113, 450-468.

Van Laarhoven, P., & Aarts, E,H.(1988). Simulated Annealing: Theory and Applications. Kluwer Academic Publishers, Dordrecht.
  • 34
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: International Journal of Industrial Engineering Computations | Year: 2012 | Volume: 3 | Issue: 3 | Views: 2963 | Reviews: 0

Related Articles:
  • Optimization costs of the single-machine scheduling problem with maintenance activities by using genetic algorithm
  • Minimizing total weighted tardiness for the single machine scheduling problem with dependent setup time and precedence constraints
  • Single-machine batch scheduling minimizing weighted flow times and delivery costs with job release times
  • Just-in-time preemptive single machine problem with costs of earliness/tardiness, interruption and work-in-process
  • A new mathematical model for single machine batch scheduling problem for minimizing maximum lateness with deteriorating jobs

📝 Ready to share your research?

International Journal of Industrial Engineering Computations is accepting new submissions for upcoming issues. Join our community of authors and publish your work with us.

✓ Open access
✓ Rigorous peer review
✓ Fast publication
📤 Submit Your Manuscript →

📖 Author Guidelines


Add Reviews

Name:*
E-Mail:
Review:
Bold Italic Underline Strike | Align left Center Align right | Insert smilies Insert link URLInsert protected URL Select color | Add Hidden Text Insert Quote Convert selected text from selection to Cyrillic (Russian) alphabet Insert spoiler
winkwinkedsmileam
belayfeelfellowlaughing
lollovenorecourse
requestsadtonguewassat
cryingwhatbullyangry
Security Code: *
Include security image CAPCHA.
Refresh Code

® 2010-2026 GrowingScience.Com