Processing, Please wait...

  • Home
  • About Us
  • Search:
  • Advanced Search

Growing Science » Tags cloud » Multi-item manufacturing-delivery

Journals

  • IJIEC (747)
  • MSL (2643)
  • DSL (668)
  • CCL (508)
  • USCM (1092)
  • ESM (413)
  • AC (562)
  • JPM (271)
  • IJDS (912)
  • JFS (91)
  • HE (32)
  • SCI (26)

Keywords

Supply chain management(166)
Jordan(161)
Vietnam(149)
Customer satisfaction(120)
Performance(113)
Supply chain(110)
Service quality(98)
Competitive advantage(95)
Tehran Stock Exchange(94)
SMEs(87)
optimization(86)
Financial performance(83)
Trust(83)
TOPSIS(83)
Sustainability(81)
Job satisfaction(80)
Factor analysis(78)
Social media(78)
Knowledge Management(77)
Artificial intelligence(77)


» Show all keywords

Authors

Naser Azad(82)
Mohammad Reza Iravani(64)
Zeplin Jiwa Husada Tarigan(63)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(39)
Jumadil Saputra(36)
Dmaithan Almajali(36)
Muhammad Turki Alshurideh(35)
Barween Al Kurdi(32)
Ahmad Makui(32)
Basrowi Basrowi(31)
Hassan Ghodrati(31)
Mohammad Khodaei Valahzaghard(30)
Sautma Ronni Basana(29)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)
Haitham M. Alzoubi(27)


» Show all authors

Countries

Iran(2183)
Indonesia(1290)
India(787)
Jordan(786)
Vietnam(504)
Saudi Arabia(453)
Malaysia(441)
United Arab Emirates(220)
China(206)
Thailand(153)
United States(111)
Turkey(106)
Ukraine(104)
Egypt(98)
Canada(92)
Peru(88)
Pakistan(85)
United Kingdom(80)
Morocco(79)
Nigeria(78)


» Show all countries
Sort articles by: Volume | Date | Most Rates | Most Views | Reviews | Alphabet
1.

The joint influence of quality assurance and postponement on a hybrid multi-item manufacturing-delivery decision-making Pages 821-836 Right click to download the paper Download PDF

Authors: Yuan-Shyi P. Chiu, Hung-Yi Chen, Victoria Chiu, Singa Wang Chiu, Hsiao-Chun Wu

DOI: 10.5267/j.ijiec.2023.6.002

Keywords: Multi-item manufacturing-delivery, Postponement, Subcontracting, Quality assurance, Supply-chain, Multiple deliveries

Abstract:
The present research explores the collective influence of quality assurance and postponement on a hybrid multiproduct replenishing-delivery decision-making. Assume the required multiproduct has a standard (common) component, and our replenishing-delivery model has incorporated a two-phase postponement strategy. The first phase makes all standard components and hires an external supplier to partially provide the required parts to cut short the needed uptime. In contrast, the second phase fabricates the finished multiproduct in sequence. To ensure the desired merchandise quality, we apply a quality-assurance action to the in-house processes to screen and remove scrap items and rework the repairable defects in both stages. Upon completing each merchandise, these products are transported to the customer in n fixed-quantity shipment in fixed-time intervals. We employ math modeling and formulating approaches to gain the overall supply-chain operating expenses comprising subcontracting, fabricating, stock holding, transportation, and customer holding costs. By minimizing system operating expenses, this research determines the optimal replenishing-delivery policy. Lastly, we give a numerical example to demonstrate our study’s applicability and usefulness/capability for facilitating managerial decision-making.
Details
  • 17
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2023 | Volume: 14 | Issue: 4 | Views: 914 | Reviews: 0

 

® 2010-2026 GrowingScience.Com