Processing, Please wait...

  • Publisher Home
  • Home
  • 🔙 Back
  • 📚 Journals
    • ⚙️ IJIEC - Industrial Engineering Computations
    • 🌐 IJDNS - Data and Network Science
    • 🧪 CCL - Current Chemistry Letters
    • 💹 AC - Accounting
    • 🎯 DSL - Decision Science Letters
    • 🚛 USCM - Uncertain Supply Chain Management
    • 🏗️ JPM - Journal of Project Management
    • 🏥 HE - Healthcare Engineering
    • 📈 SCI - Scientometrica
    • 🔩 ESM - Engineering Solid Mechanics
    • 🌿 JFS - Journal of Future Sustainability
    • 💼 MSL - Management Science Letters
  • 📝 Submit Article
  • 📊 Statistics
  • 📋 About
    • 📄 About Us
    • 📰 Blog
    • 📢 News
    • 📧 Contact
  • 📺 Tutorial
  • Search:
  • Advanced Search

Growing Science » International Journal of Industrial Engineering Computations » An algorithm for a no-wait flowshop scheduling problem for minimizing total tardiness with a constraint on total completion time

⭐ Highly Cited Articles

  • Jaya Algorithm
  • Rao Algorithm
  • TLBO Algorithm
  • ChatGPT and Blended Learning

Journals

  • IJIEC (840)
  • IJDS (1032)
  • DSL (759)
  • ESM (434)
  • CCL (563)
  • JPM (350)
  • AC (572)
  • JFS (106)
  • MSL (2658)
  • USCM (1104)
  • HE (57)
  • SCI (53)

IJIEC Volumes

    • ▼ Volume 17 (113)
      • Issue 1 (21)
      • Issue 2 (30)
      • Issue 3 (26)
      • Issue 4 (36)
    • ▼ Volume 16 (75)
      • Issue 1 (12)
      • Issue 2 (15)
      • Issue 3 (19)
      • Issue 4 (29)
    • ▼ Volume 15 (55)
      • Issue 1 (19)
      • Issue 2 (15)
      • Issue 3 (12)
      • Issue 4 (9)
    • ▼ Volume 14 (50)
      • Issue 1 (11)
      • Issue 2 (15)
      • Issue 3 (9)
      • Issue 4 (15)
    • ▼ Volume 13 (41)
      • Issue 1 (10)
      • Issue 2 (8)
      • Issue 3 (10)
      • Issue 4 (13)
    • ▼ Volume 12 (29)
      • Issue 1 (9)
      • Issue 2 (6)
      • Issue 3 (8)
      • Issue 4 (6)
    • ▼ Volume 11 (36)
      • Issue 1 (9)
      • Issue 2 (8)
      • Issue 3 (9)
      • Issue 4 (10)
    • ▼ Volume 10 (34)
      • Issue 1 (8)
      • Issue 2 (10)
      • Issue 3 (8)
      • Issue 4 (8)
    • ▼ Volume 9 (32)
      • Issue 1 (9)
      • Issue 2 (6)
      • Issue 3 (7)
      • Issue 4 (10)
    • ▼ Volume 8 (30)
      • Issue 1 (9)
      • Issue 2 (7)
      • Issue 3 (8)
      • Issue 4 (6)
    • ▼ Volume 7 (47)
      • Issue 1 (10)
      • Issue 2 (14)
      • Issue 3 (10)
      • Issue 4 (13)
    • ▼ Volume 6 (39)
      • Issue 1 (7)
      • Issue 2 (12)
      • Issue 3 (10)
      • Issue 4 (10)
    • ▼ Volume 5 (47)
      • Issue 1 (13)
      • Issue 2 (12)
      • Issue 3 (12)
      • Issue 4 (10)
    • ▼ Volume 4 (50)
      • Issue 1 (14)
      • Issue 2 (10)
      • Issue 3 (12)
      • Issue 4 (14)
    • ▼ Volume 3 (77)
      • Issue 1 (10)
      • Issue 2 (15)
      • Issue 3 (20)
      • Issue 4 (12)
      • Issue 5 (20)
    • ▼ Volume 2 (68)
      • Issue 1 (12)
      • Issue 2 (20)
      • Issue 3 (20)
      • Issue 4 (16)
    • ▼ Volume 1 (17)
      • Issue 1 (9)
      • Issue 2 (8)

🔑 Keywords

Jordan(175)
Supply chain management(172)
Vietnam(154)
Customer satisfaction(124)
Performance(117)
Supply chain(115)
Artificial intelligence(108)
Service quality(101)
Competitive advantage(100)
SMEs(95)
Sustainability(94)
Tehran Stock Exchange(94)
optimization(88)
Financial performance(86)
TOPSIS(85)
Trust(85)
Organizational performance(81)
Job satisfaction(81)
Genetic Algorithm(81)
Social media(80)


» Show all keywords

✍️ Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(70)
Mohammad Reza Iravani(65)
Endri Endri(45)
Hotlan Siagian(43)
Muhammad Alshurideh(42)
Dmaithan Almajali(39)
Jumadil Saputra(37)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Sautma Ronni Basana(33)
Barween Al Kurdi(32)
Basrowi Basrowi(31)
Mohammad Khodaei Valahzaghard(30)
Haitham M. Alzoubi(30)
Ni Nyoman Kerti Yasa(30)
Hassan Ghodrati(30)
Shankar Chakraborty(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Mahmoud Allahham(28)


» Show all authors

🌍 Countries

1. Algeria (52)
2. Angola (2)
3. Argentina (22)
4. Armenia (2)
5. Australia (52)
6. Austria (2)
7. Bahrain (26)
8. Bangladesh (58)
9. Belarus (4)
10. Belgium (3)
11. Benin (2)
12. Benin Republic (1)
13. Bhutan (1)
14. Bosnia and Herzegovina (1)
15. Botswana (9)
16. Brazil (40)
17. Brunei (1)
18. Bulgaria (1)
19. Burkina Faso (1)
20. Cameroon (1)
Total: 121 countries

Show all countries
International Journal of Industrial Engineering Computations
ISSN 1923-2934 (Online) - ISSN 1923-2926 (Print)
Quarterly Publication
Volume 13 Issue 1 pp. 43-50, 2022

An algorithm for a no-wait flowshop scheduling problem for minimizing total tardiness with a constraint on total completion time Pages 43-50 PDF Download PDF

Authors: Ali Allahverdi, Harun Aydilek, Asiye Aydilek

📋 Author Affiliations:
Ali Allahverdi1, Harun Aydilek ORCID 2, Asiye Aydilek ORCID 3
1 Industrial & Management Systems Eng. Dept., Kuwait University, Kuwait, N/A
2 Department of Mathematics & Natural Sciences, Gulf University for Science and Technology, Kuwait, N/A
3 Department of Economics & Finance, Gulf University for Science and Technology, Kuwait, N/A
doi 10.5267/j.ijiec.2021.8.003
15 Source: Scopus
Crossref 7 Source: CrossRef

🔑 Keywords: Algorithm, Scheduling, Statistical analysis, No-wait

Abstract: We consider a no-wait m-machine flowshop scheduling problem which is common in different manufacturing industries such as steel, pharmaceutical, and chemical. The objective is to minimize total tardiness since it minimizes penalty costs and loss of customer goodwill. We also consider the performance measure of total completion time which is significant in environments where reducing holding cost is important. We consider both performance measures with the objective of minimizing total tardiness subject to the constraint that total completion time is bounded. Given that the problem is NP-hard, we propose an algorithm. We conduct extensive computational experiments to compare the performance of the proposed algorithm with those of three well performing benchmark algorithms in the literature. Computational results indicate that the proposed algorithm reduces the error of the best existing benchmark algorithm by 88% under the same CPU times. The results are confirmed by extensive statistical analysis. Specifically, ANOVA analysis is conducted to justify the difference between the performances of the algorithms, and a test of hypothesis is performed to justify that the proposed algorithm is significantly better than the best existing benchmark algorithm with a significance level of 0.01.


How to cite this paper
APA: Allahverdi, A., Aydilek, H & Aydilek, A. (2022). An algorithm for a no-wait flowshop scheduling problem for minimizing total tardiness with a constraint on total completion time. International Journal of Industrial Engineering Computations, 13(1), 43-50.
Chicago/Turabian: Allahverdi, A., Aydilek, H & Aydilek, A. 2022. "An algorithm for a no-wait flowshop scheduling problem for minimizing total tardiness with a constraint on total completion time." International Journal of Industrial Engineering Computations 13, no. 1 (2022): 43-50.
AMA: Allahverdi, A., Aydilek, H & Aydilek, A. An algorithm for a no-wait flowshop scheduling problem for minimizing total tardiness with a constraint on total completion time. International Journal of Industrial Engineering Computations. 2022;13(1):43-50.

References
Aldowaisan, T., & Allahverdi, A. (2004). New heuristics for m-machine no-wait flowshop to minimize total completion time. Omega, 32(5), 345-352.
Allahverdi, A. (2012). Minimizing total tardiness in no-wait flowshops. Foundations of Computing and Decision Sciences, 37(3), 149-162.
Allahverdi, A. (2015). The third comprehensive survey on scheduling problems with setup times/costs. European Journal of Operational Research, 246(2), 345-378.
Allahverdi, A. (2016). A survey of scheduling problems with no-wait in process. European Journal of Operational Research, 255(3), 665-686.
Allahverdi, A., & Aldowaisan, T. (2004). No-wait flowshops with bicriteria of makespan and maximum lateness. European Journal of Operational Research, 152(1), 132-147.
Allahverdi, A., & Aydilek, H. (2013). Algorithms for no-wait flowshops with total completion time subject to makespan. The International Journal of Advanced Manufacturing Technology, 68(9-12), 2237-2251.
Allahverdi, A., & Aydilek, H. (2014). Total completion time with makespan constraint in no-wait flowshops with setup times. European Journal of Operational Research, 238(3), 724-734.
Allahverdi, A., Aydilek, H., & Aydilek, A. (2018). No-wait flowshop scheduling problem with two criteria; total tardiness and makespan. European Journal of Operational Research, 269(2), 590-601.
Allahverdi, A., Aydilek, H., & Aydilek, A. (2020). No-wait flowshop scheduling problem with separate setup times to minimize total tardiness subject to makespan. Applied Mathematics and Computation, 365, 124688.
Arabameri, S., & Salmasi, N. (2013). Minimization of weighted earliness and tardiness for no-wait sequence-dependent setup times flowshop scheduling problem. Computers & Industrial Engineering, 64(4), 902-916.
Aydilek, H., & Allahverdi, A. (2012). Heuristics for no-wait flowshops with makespan subject to mean completion time. Applied Mathematics and Computation, 219(1), 351-359.
Aydilek, H., & Allahverdi, A. (2013). New heuristics for no-wait flowshops with performance measures of makespan and mean completion time. International Journal of Operations Research, 10, 29-37.
Chen, C. L., Neppalli, R. V., & Aljaber, N. (1996). Genetic algorithms applied to the continuous flow shop problem. Computers & Industrial Engineering, 30(4), 919-929.
Ding, J., Song, S., Zhang, R., Gupta, J. N., & Wu, C. (2015). Accelerated methods for total tardiness minimisation in no-wait flowshops. International Journal of Production Research, 53(4), 1002-1018.
Fink, A., & Voß, S. (2003). Solving the continuous flow-shop scheduling problem by metaheuristics. European Journal of Operational Research, 151(2), 400-414.
Framinan, J. M., Nagano, M. S., & Moccellin, J. V. (2010). An efficient heuristic for total flowtime minimisation in no-wait flowshops. The International Journal of Advanced Manufacturing Technology, 46(9-12), 1049-1057.
Hall, N. G., & Sriskandarajah, C. (1996). A survey of machine scheduling problems with blocking and no-wait in process. Operations research, 44(3), 510-525.
Hecker, F. T., Stanke, M., Becker, T., & Hitzmann, B. (2014). Application of a modified GA, ACO and a random search procedure to solve the production scheduling of a case study bakery. Expert systems with applications, 41(13), 5882-5891.
Jenabi, M., Naderi, B., & Ghomi, S. F. (2010, September). A bi-objective case of no-wait flowshops. In 2010 IEEE Fifth International Conference on Bio-Inspired Computing: Theories and Applications (BIC-TA) (pp. 1048-1056). IEEE.
Lee, J. Y., & Kim, Y. D. (2017). Minimizing total tardiness in a two-machine flowshop scheduling problem with availability constraint on the first machine. Computers & Industrial Engineering, 114, 22-30.
Liu, G., Song, S., & Wu, C. (2013). Some heuristics for no-wait flowshops with total tardiness criterion. Computers & operations research, 40(2), 521-525.
Nagano, M. S., Da Silva, A. A., & Lorena, L. A. N. (2012). A new evolutionary clustering search for a no-wait flow shop problem with set-up times. Engineering Applications of Artificial Intelligence, 25(6), 1114-1120.
Pan, Q. K., Tasgetiren, M. F., & Liang, Y. C. (2008). A discrete particle swarm optimization algorithm for the no-wait flowshop scheduling problem. Computers & Operations Research, 35(9), 2807-2839.
Pan, Q. K., & Wang, L. (2008). A novel multi-objective particle swarm optimization algorithm for no-wait flow shop scheduling problems. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 222(4), 519-539.
Pan, Q. K., Wang, L., & Qian, B. (2009). A novel differential evolution algorithm for bi-criteria no-wait flow shop scheduling problems. Computers & Operations Research, 36(8), 2498-2511.
Qian, B., Wang, L., Huang, D. X., & Wang, X. (2009). Multi-objective no-wait flow-shop scheduling with a memetic algorithm based on differential evolution. Soft Computing, 13(8), 847-869.
Rajendran, C., & Chaudhuri, D. (1990). Heuristic algorithms for continuous flow‐shop problem. Naval Research Logistics (NRL), 37(5), 695-705.
Ruiz, R., & Allahverdi, A. (2009). New heuristics for no-wait flow shops with a linear combination of makespan and maximum lateness. International Journal of Production Research, 47(20), 5717-5738.
Ruiz-Torres, A. J., Paletta, G., & M’Hallah, R. (2017). Makespan minimisation with sequence-dependent machine deterioration and maintenance events. International Journal of Production Research, 55(2), 462-479.
Shao, Z., Pi, D., & Shao, W. (2017). Self-adaptive discrete invasive weed optimization for the blocking flow-shop scheduling problem to minimize total tardiness. Computers & Industrial Engineering, 111, 331-351.
Shyu, S. J., Lin, B. M., & Yin, P. Y. (2004). Application of ant colony optimization for no-wait flowshop scheduling problem to minimize the total completion time. Computers & industrial engineering, 47(2-3), 181-193.
T'kindt, V., & Billaut, J. C. (2006). Multicriteria scheduling: theory, models and algorithms. Springer Science & Business Media.
Wang, Y., Tang, J., Pan, Z., & Yan, C. (2015). Particle swarm optimization-based planning and scheduling for a laminar-flow operating room with downstream resources. Soft Computing, 19(10), 2913-2926.
  • 0
  • 1
  • 2
  • 3
  • 4
  • 5

📚 Journal: International Journal of Industrial Engineering Computations | 📅 Year: 2022 | 📖 Volume: 13 | 📄 Issue: 1 | 👁️ Views: 1656 | 📊 Crossref: 7

Related Articles:
  • An improved algorithm to minimize the total completion time in a two-machine no-wait flow-shop with uncertain setup times
  • Minimization of total tardiness in no-wait flowshop production systems with preventive maintenance
  • Heuristics for no-wait flow shop scheduling problem
  • M-machine, no-wait flowshop scheduling with sequence dependent setup times and truncated learning function to minimize the makespan
  • A new effective heuristic method for the no-wait flowshop with sequence-dependent setup times problem

📝 Ready to share your research?

International Journal of Industrial Engineering Computations is accepting new submissions for upcoming issues. Join our community of authors and publish your work with us.

✓ Open access
✓ Rigorous peer review
✓ Fast publication
📤 Submit Your Manuscript →

📖 Author Guidelines

® 2010-2026 GrowingScience.Com