Processing, Please wait...

  • Publisher Home
  • Home
  • 🔙 Back
  • 📚 Journals
    • ⚙️ IJIEC - Industrial Engineering Computations
    • 🌐 IJDNS - Data and Network Science
    • 🧪 CCL - Current Chemistry Letters
    • 💹 AC - Accounting
    • 🎯 DSL - Decision Science Letters
    • 🚛 USCM - Uncertain Supply Chain Management
    • 🏗️ JPM - Journal of Project Management
    • 🏥 HE - Healthcare Engineering
    • 📈 SCI - Scientometrica
    • 🔩 ESM - Engineering Solid Mechanics
    • 🌿 JFS - Journal of Future Sustainability
    • 💼 MSL - Management Science Letters
  • 📝 Submit Article
  • 📊 Statistics
  • 📋 About
    • 📄 About Us
    • 📰 Blog
    • 📢 News
    • 📧 Contact
  • 📺 Tutorial
  • Search:
  • Advanced Search

Growing Science » Tags cloud » Fuzzy flexible job shop scheduling problem

⭐ Highly Cited Articles

  • Jaya Algorithm
  • Rao Algorithm
  • TLBO Algorithm
  • ChatGPT and Blended Learning

Journals

  • IJIEC (840)
  • IJDS (1032)
  • DSL (759)
  • ESM (434)
  • CCL (563)
  • JPM (350)
  • AC (572)
  • JFS (106)
  • MSL (2658)
  • USCM (1104)
  • HE (57)
  • SCI (53)

🔑 Keywords

Jordan(175)
Supply chain management(172)
Vietnam(154)
Customer satisfaction(124)
Performance(117)
Supply chain(115)
Artificial intelligence(108)
Service quality(101)
Competitive advantage(100)
SMEs(95)
Sustainability(94)
Tehran Stock Exchange(94)
optimization(88)
Financial performance(86)
TOPSIS(85)
Trust(85)
Organizational performance(81)
Job satisfaction(81)
Genetic Algorithm(81)
Social media(80)


» Show all keywords

✍️ Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(70)
Mohammad Reza Iravani(65)
Endri Endri(45)
Hotlan Siagian(43)
Muhammad Alshurideh(42)
Dmaithan Almajali(39)
Jumadil Saputra(37)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Sautma Ronni Basana(33)
Barween Al Kurdi(32)
Basrowi Basrowi(31)
Mohammad Khodaei Valahzaghard(30)
Haitham M. Alzoubi(30)
Ni Nyoman Kerti Yasa(30)
Hassan Ghodrati(30)
Shankar Chakraborty(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Mahmoud Allahham(28)


» Show all authors

🌍 Countries

1. Algeria (52)
2. Angola (2)
3. Argentina (22)
4. Armenia (2)
5. Australia (52)
6. Austria (2)
7. Bahrain (26)
8. Bangladesh (58)
9. Belarus (4)
10. Belgium (3)
11. Benin (2)
12. Benin Republic (1)
13. Bhutan (1)
14. Bosnia and Herzegovina (1)
15. Botswana (9)
16. Brazil (40)
17. Brunei (1)
18. Bulgaria (1)
19. Burkina Faso (1)
20. Cameroon (1)
Total: 121 countries

Show all countries
Sort articles by: 📖 Volume | 📅 Date | ⭐ Most Rates | 👁️ Most Views | 🚀 Rising Stars | 🔗 Citations (Scopus) | 🔥 Hot Papers
1.

A multi-objective fuzzy flexible job shop scheduling problem considering the maximization of processing quality Pages 491-502 PDF Download PDF

Authors: Jiarui Li, Zailin Guan

doi 10.5267/j.ijiec.2023.12.011

🔑 Keywords: Fuzzy flexible job shop scheduling problem, Multi-objective optimization, Spider monkey optimization algorithm, Aircraft shaft parts manufacturing systems

Abstract:
This paper analyzes practical production characteristics, including customer's stringent quality requirements and uncertain processing time in aircraft shaft parts manufacturing. Considering the above characteristics, we propose a multi-objective fuzzy aircraft shaft parts production scheduling problem considering the maximization of production quality. We define this problem as a multi-objective fuzzy flexible job shop scheduling problem (MO-fFJSP) with fuzzy processing time. To address this problem, we developed an improved multi-objective spider monkey optimization (IMOSMO) algorithm. IMOSMO integrates strategies such as genetic operators, variable neighborhood search and Pareto optimization theory on the framework of the conventional Spider Monkey Optimization (SMO) framework and discretize the continuous SMO algorithm to solve MO-fFJSP. To enhance the efficiency of the algorithm, we further adjust the sequence of the local leader learning phase and the global leader learning phase within the proposed IMOSMO framework. We conduct a comparative analysis between the performance of IMOSMO and NSGA-Ⅱ using 28 cases of varying scales. The computational results demonstrate the superiority of our algorithm over NSGA-Ⅱ in terms of both solution diversity and quality. Moreover, the performance of the proposed algorithm upgrades as the problem scale increases.
Details
  • 34
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2024 | Volume: 15 | Issue: 2 | Views: 1422

 

® 2010-2026 GrowingScience.Com