Processing, Please wait...

  • Home
  • About Us
  • Search:
  • Advanced Search

Growing Science » Tags cloud » Aircraft shaft parts manufacturing systems

Journals

  • IJIEC (747)
  • MSL (2643)
  • DSL (668)
  • CCL (508)
  • USCM (1092)
  • ESM (413)
  • AC (562)
  • JPM (271)
  • IJDS (912)
  • JFS (91)
  • HE (32)
  • SCI (26)

Keywords

Supply chain management(166)
Jordan(161)
Vietnam(149)
Customer satisfaction(120)
Performance(113)
Supply chain(110)
Service quality(98)
Competitive advantage(95)
Tehran Stock Exchange(94)
SMEs(87)
optimization(86)
Financial performance(83)
Trust(83)
TOPSIS(83)
Sustainability(81)
Job satisfaction(80)
Factor analysis(78)
Social media(78)
Knowledge Management(77)
Artificial intelligence(77)


» Show all keywords

Authors

Naser Azad(82)
Mohammad Reza Iravani(64)
Zeplin Jiwa Husada Tarigan(63)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(39)
Jumadil Saputra(36)
Dmaithan Almajali(36)
Muhammad Turki Alshurideh(35)
Barween Al Kurdi(32)
Ahmad Makui(32)
Basrowi Basrowi(31)
Hassan Ghodrati(31)
Mohammad Khodaei Valahzaghard(30)
Sautma Ronni Basana(29)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)
Haitham M. Alzoubi(27)


» Show all authors

Countries

Iran(2183)
Indonesia(1290)
India(787)
Jordan(786)
Vietnam(504)
Saudi Arabia(453)
Malaysia(441)
United Arab Emirates(220)
China(206)
Thailand(153)
United States(111)
Turkey(106)
Ukraine(104)
Egypt(98)
Canada(92)
Peru(88)
Pakistan(85)
United Kingdom(80)
Morocco(79)
Nigeria(78)


» Show all countries
Sort articles by: Volume | Date | Most Rates | Most Views | Reviews | Alphabet
1.

A multi-objective fuzzy flexible job shop scheduling problem considering the maximization of processing quality Pages 491-502 Right click to download the paper Download PDF

Authors: Jiarui Li, Zailin Guan

DOI: 10.5267/j.ijiec.2023.12.011

Keywords: Fuzzy flexible job shop scheduling problem, Multi-objective optimization, Spider monkey optimization algorithm, Aircraft shaft parts manufacturing systems

Abstract:
This paper analyzes practical production characteristics, including customer's stringent quality requirements and uncertain processing time in aircraft shaft parts manufacturing. Considering the above characteristics, we propose a multi-objective fuzzy aircraft shaft parts production scheduling problem considering the maximization of production quality. We define this problem as a multi-objective fuzzy flexible job shop scheduling problem (MO-fFJSP) with fuzzy processing time. To address this problem, we developed an improved multi-objective spider monkey optimization (IMOSMO) algorithm. IMOSMO integrates strategies such as genetic operators, variable neighborhood search and Pareto optimization theory on the framework of the conventional Spider Monkey Optimization (SMO) framework and discretize the continuous SMO algorithm to solve MO-fFJSP. To enhance the efficiency of the algorithm, we further adjust the sequence of the local leader learning phase and the global leader learning phase within the proposed IMOSMO framework. We conduct a comparative analysis between the performance of IMOSMO and NSGA-Ⅱ using 28 cases of varying scales. The computational results demonstrate the superiority of our algorithm over NSGA-Ⅱ in terms of both solution diversity and quality. Moreover, the performance of the proposed algorithm upgrades as the problem scale increases.
Details
  • 34
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2024 | Volume: 15 | Issue: 2 | Views: 965 | Reviews: 0

 

® 2010-2026 GrowingScience.Com