Processing, Please wait...

  • Home
  • About Us
  • Search:
  • Advanced Search

Growing Science » Tags cloud » Action plan selection

Journals

  • IJIEC (747)
  • MSL (2643)
  • DSL (668)
  • CCL (508)
  • USCM (1092)
  • ESM (413)
  • AC (562)
  • JPM (271)
  • IJDS (912)
  • JFS (91)
  • HE (32)
  • SCI (26)

Keywords

Supply chain management(166)
Jordan(161)
Vietnam(149)
Customer satisfaction(120)
Performance(113)
Supply chain(110)
Service quality(98)
Competitive advantage(95)
Tehran Stock Exchange(94)
SMEs(87)
optimization(86)
Financial performance(83)
Trust(83)
TOPSIS(83)
Sustainability(81)
Job satisfaction(80)
Factor analysis(78)
Social media(78)
Knowledge Management(77)
Artificial intelligence(77)


» Show all keywords

Authors

Naser Azad(82)
Mohammad Reza Iravani(64)
Zeplin Jiwa Husada Tarigan(63)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(39)
Jumadil Saputra(36)
Dmaithan Almajali(36)
Muhammad Turki Alshurideh(35)
Barween Al Kurdi(32)
Ahmad Makui(32)
Basrowi Basrowi(31)
Hassan Ghodrati(31)
Mohammad Khodaei Valahzaghard(30)
Sautma Ronni Basana(29)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)
Haitham M. Alzoubi(27)


» Show all authors

Countries

Iran(2183)
Indonesia(1290)
India(787)
Jordan(786)
Vietnam(504)
Saudi Arabia(453)
Malaysia(441)
United Arab Emirates(220)
China(206)
Thailand(153)
United States(111)
Turkey(106)
Ukraine(104)
Egypt(98)
Canada(92)
Peru(88)
Pakistan(85)
United Kingdom(80)
Morocco(79)
Nigeria(78)


» Show all countries
Sort articles by: Volume | Date | Most Rates | Most Views | Reviews | Alphabet
1.

Predicting project duration and cost, and selecting the best action plan using statistical methods for earned value management Pages 157-166 Right click to download the paper Download PDF

Authors: Sajad Soltan, Maryam Ashrafi

DOI: 10.5267/j.jpm.2020.3.002

Keywords: Project management, Earned value management, Control charts, Action plan selection, Duration forecasting, Cost forecasting, Empirical database

Abstract:
Nowadays, with the increasing number of projects in organizations, managers are enthusiastic about managing and controlling projects, and as projects become more complex and cause unforeseen risks, project management becomes even more critical. Using the earned value management method to control the current status of projects, and predicting the future status of projects has had many advantages. Representing the status of the project, and predicting the project performance by various indicators are some features of this method. As these indicators are deterministic, the risk of the prediction increases when the number of risks goes up in a project. Therefore, statistical methods can be employed to estimate the statistical distribution of risks and notably boost predicting accuracy. The purpose of this paper is to present a method for predicting project duration and cost of the project and selecting the best action plan. Control charts are used along with the earned value management method to increase accuracy. This model also provides the possibility of selecting the best action plan to improve project performance. Moreover, this method can be applied in each project phase separately. Finally, a case study is used to investigate the validity of the proposed method.
Details
  • 51
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2020 | Volume: 5 | Issue: 3 | Views: 3951 | Reviews: 0

 

® 2010-2026 GrowingScience.Com