Processing, Please wait...

  • Publisher Home
  • Home
  • ๐Ÿ”™ Back
  • ๐Ÿ“š Journals
    • โš™๏ธ IJIEC - Industrial Engineering Computations
    • ๐ŸŒ IJDNS - Data and Network Science
    • ๐Ÿงช CCL - Current Chemistry Letters
    • ๐Ÿ’น AC - Accounting
    • ๐ŸŽฏ DSL - Decision Science Letters
    • ๐Ÿš› USCM - Uncertain Supply Chain Management
    • ๐Ÿ—๏ธ JPM - Journal of Project Management
    • ๐Ÿฅ HE - Healthcare Engineering
    • ๐Ÿ“ˆ SCI - Scientometrica
    • ๐Ÿ”ฉ ESM - Engineering Solid Mechanics
    • ๐ŸŒฟ JFS - Journal of Future Sustainability
    • ๐Ÿ’ผ MSL - Management Science Letters
  • ๐Ÿ“ Submit Article
  • ๐Ÿ“Š Statistics
  • ๐Ÿ“‹ About
    • ๐Ÿ“„ About Us
    • ๐Ÿ“ฐ Blog
    • ๐Ÿ“ข News
    • ๐Ÿ“ง Contact
  • ๐Ÿ“บ Tutorial
  • Search:
  • Advanced Search

Growing Science » Tags cloud » Control charts

โญ Highly Cited Articles

  • Jaya Algorithm
  • Rao Algorithm
  • TLBO Algorithm
  • ChatGPT and Blended Learning

Journals

  • IJIEC (840)
  • IJDS (1032)
  • DSL (759)
  • ESM (434)
  • CCL (563)
  • JPM (350)
  • AC (572)
  • JFS (106)
  • MSL (2658)
  • USCM (1104)
  • HE (55)
  • SCI (53)

๐Ÿ”‘ Keywords

Jordan(175)
Supply chain management(172)
Vietnam(154)
Customer satisfaction(124)
Performance(117)
Supply chain(115)
Artificial intelligence(108)
Service quality(101)
Competitive advantage(100)
SMEs(95)
Tehran Stock Exchange(94)
Sustainability(94)
optimization(88)
Financial performance(86)
TOPSIS(85)
Trust(85)
Genetic Algorithm(81)
Organizational performance(81)
Job satisfaction(81)
Knowledge Management(80)


» Show all keywords

โœ๏ธ Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(70)
Mohammad Reza Iravani(65)
Endri Endri(45)
Hotlan Siagian(43)
Muhammad Alshurideh(42)
Dmaithan Almajali(39)
Jumadil Saputra(37)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Sautma Ronni Basana(33)
Barween Al Kurdi(32)
Basrowi Basrowi(31)
Mohammad Khodaei Valahzaghard(30)
Haitham M. Alzoubi(30)
Ni Nyoman Kerti Yasa(30)
Hassan Ghodrati(30)
Shankar Chakraborty(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Mahmoud Allahham(28)


» Show all authors

๐ŸŒ Countries

1. Algeria (52)
2. Angola (2)
3. Argentina (22)
4. Armenia (2)
5. Australia (52)
6. Austria (2)
7. Bahrain (26)
8. Bangladesh (58)
9. Belarus (4)
10. Belgium (3)
11. Benin (2)
12. Benin Republic (1)
13. Bhutan (1)
14. Bosnia and Herzegovina (1)
15. Botswana (9)
16. Brazil (40)
17. Brunei (1)
18. Bulgaria (1)
19. Burkina Faso (1)
20. Cameroon (1)
Total: 121 countries

Show all countries
Sort articles by: ๐Ÿ“– Volume | ๐Ÿ“… Date | โญ Most Rates | ๐Ÿ‘๏ธ Most Views | ๐Ÿš€ Rising Stars | ๐Ÿ”— Citations (Scopus) | ๐Ÿ”ฅ Hot Papers
1.

Application of EWMA chart for monitoring process mean in paper industry Pages 571-576 PDF Download PDF

Authors: S. Ramesh, B.A. Vasu

doi 10.5267/j.msl.2019.1.006

๐Ÿ”‘ Keywords: Statistical process control, Paper machine, Bulk density, Control Limits, EWMA, Control charts

Abstract:
This paper presents a statistical process control (SPC) chart for variables in a new feature for the paper machine in the paper industry. The traditional control charts like X-bar and R charts may be inadequate sometimes when the process exhibits abnormal situations which could lead to false decisions. When we are interested in detecting small shifts, Exponentially Weighted Moving average (EWMA) control chart provides the correct picture to make right decisions without affecting the process unnecessarily. This study is aimed at designing EWMA control chart in paper manufacturing process.
Details
  • 0
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: MSL | Year: 2019 | Volume: 9 | Issue: 4 | Views: 2268

 
2.

Predicting project duration and cost, and selecting the best action plan using statistical methods for earned value management Pages 157-166 PDF Download PDF

Authors: Sajad Soltan, Maryam Ashrafi

doi 10.5267/j.jpm.2020.3.002

๐Ÿ”‘ Keywords: Project management, Earned value management, Control charts, Action plan selection, Duration forecasting, Cost forecasting, Empirical database

Abstract:
Nowadays, with the increasing number of projects in organizations, managers are enthusiastic about managing and controlling projects, and as projects become more complex and cause unforeseen risks, project management becomes even more critical. Using the earned value management method to control the current status of projects, and predicting the future status of projects has had many advantages. Representing the status of the project, and predicting the project performance by various indicators are some features of this method. As these indicators are deterministic, the risk of the prediction increases when the number of risks goes up in a project. Therefore, statistical methods can be employed to estimate the statistical distribution of risks and notably boost predicting accuracy. The purpose of this paper is to present a method for predicting project duration and cost of the project and selecting the best action plan. Control charts are used along with the earned value management method to increase accuracy. This model also provides the possibility of selecting the best action plan to improve project performance. Moreover, this method can be applied in each project phase separately. Finally, a case study is used to investigate the validity of the proposed method.
Details
  • 51
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2020 | Volume: 5 | Issue: 3 | Views: 4534

 
3.

Prioritization and selection of parameters for control chart implementation based on technical criticality and cost criticality Pages 203-210 PDF Download PDF

Authors: Sirintra Tan-intara-art, Napassavong Rojanarowan

doi 10.5267/j.dsl.2013.04.001

๐Ÿ”‘ Keywords: Control charts, Cost of quality, Failure costs, Parameter prioritization, Parameter selection, Statistical process control

Abstract:
An important problem in control chart implementation is the availability of resources to collect and analyze data for control charts implementation. This paper proposes a method to prioritize and select final product parameters to control. The prioritization is based on cost of quality and technical criticality of those parameters. The prioritization method is demonstrated by a case study of flexible printed circuit manufacturing.
Details
  • 17
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: DSL | Year: 2013 | Volume: 2 | Issue: 3 | Views: 2527

 
4.

Application of six sigma DMAIC methodology to reduce service resolution time in a service organization Pages 43-50 PDF Download PDF

Authors: Virender Narula, Sandeep Grover Grover

doi 10.5267/j.ac.2015.11.005

๐Ÿ”‘ Keywords: Process variation, Common causes, Special causes, Control charts

Abstract:
The popularity of Six Sigma, as a means for improving quality, has grown exponentially in recent years. It is a proven methodology to achieve breakthrough improvement in process performance that generates significant savings to bottom line of an organization. This paper illustrates how Six Sigma methodology may be used to improve service processes. The purpose of this paper is to develop Six Sigma DMAIC methodologies that would help service organizations look into their processes. In addition, it demonstrates the vital linkages between process improvement and process variation. The study identifies critical process parameters and suggests a team structure for Six Sigma project in service operations.
Details
  • 34
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: AC | Year: 0 | Volume: 1 | Issue: 1 | Views: 3176

 

® 2010-2026 GrowingScience.Com