Processing, Please wait...

  • Home
  • About Us
  • Search:
  • Advanced Search

Growing Science » Journal of Project Management » Predicting project duration and cost, and selecting the best action plan using statistical methods for earned value management

Journals

  • IJIEC (747)
  • MSL (2643)
  • DSL (668)
  • CCL (508)
  • USCM (1092)
  • ESM (413)
  • AC (562)
  • JPM (271)
  • IJDS (912)
  • JFS (96)
  • HE (32)
  • SCI (26)

JPM Volumes

    • Volume 1 (8)
      • Issue 1 (5)
      • Issue 2 (3)
    • Volume 2 (13)
      • Issue 1 (4)
      • Issue 2 (3)
      • Issue 3 (3)
      • Issue 4 (3)
    • Volume 3 (17)
      • Issue 1 (4)
      • Issue 2 (5)
      • Issue 3 (4)
      • Issue 4 (4)
    • Volume 4 (24)
      • Issue 1 (4)
      • Issue 2 (8)
      • Issue 3 (8)
      • Issue 4 (4)
    • Volume 5 (20)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • Volume 6 (20)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • Volume 7 (21)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (6)
    • Volume 8 (21)
      • Issue 1 (6)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • Volume 9 (35)
      • Issue 1 (6)
      • Issue 2 (5)
      • Issue 3 (9)
      • Issue 4 (15)
    • Volume 10 (68)
      • Issue 1 (15)
      • Issue 2 (21)
      • Issue 3 (13)
      • Issue 4 (19)
    • Volume 11 (24)
      • Issue 1 (24)

Keywords

Supply chain management(166)
Jordan(161)
Vietnam(149)
Customer satisfaction(120)
Performance(113)
Supply chain(111)
Service quality(98)
Competitive advantage(95)
Tehran Stock Exchange(94)
SMEs(87)
optimization(86)
Trust(83)
TOPSIS(83)
Financial performance(83)
Sustainability(82)
Job satisfaction(80)
Factor analysis(78)
Social media(78)
Artificial intelligence(77)
Knowledge Management(77)


» Show all keywords

Authors

Naser Azad(82)
Mohammad Reza Iravani(64)
Zeplin Jiwa Husada Tarigan(63)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(39)
Jumadil Saputra(36)
Dmaithan Almajali(36)
Muhammad Turki Alshurideh(35)
Barween Al Kurdi(32)
Ahmad Makui(32)
Basrowi Basrowi(31)
Hassan Ghodrati(31)
Mohammad Khodaei Valahzaghard(30)
Sautma Ronni Basana(29)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)
Haitham M. Alzoubi(27)


» Show all authors

Countries

Iran(2184)
Indonesia(1290)
India(788)
Jordan(786)
Vietnam(504)
Saudi Arabia(453)
Malaysia(441)
United Arab Emirates(220)
China(206)
Thailand(153)
United States(111)
Turkey(106)
Ukraine(104)
Egypt(98)
Canada(92)
Peru(88)
Pakistan(85)
United Kingdom(80)
Morocco(79)
Nigeria(78)


» Show all countries

Journal of Project Management

ISSN 2371-8374 (Online) - ISSN 2371-8366 (Print)
Quarterly Publication
Volume 5 Issue 3 pp. 157-166 , 2020

Predicting project duration and cost, and selecting the best action plan using statistical methods for earned value management Pages 157-166 Right click to download the paper Download PDF

Authors: Sajad Soltan, Maryam Ashrafi

DOI: 10.5267/j.jpm.2020.3.002

Keywords: Project management, Earned value management, Control charts, Action plan selection, Duration forecasting, Cost forecasting, Empirical database

Abstract: Nowadays, with the increasing number of projects in organizations, managers are enthusiastic about managing and controlling projects, and as projects become more complex and cause unforeseen risks, project management becomes even more critical. Using the earned value management method to control the current status of projects, and predicting the future status of projects has had many advantages. Representing the status of the project, and predicting the project performance by various indicators are some features of this method. As these indicators are deterministic, the risk of the prediction increases when the number of risks goes up in a project. Therefore, statistical methods can be employed to estimate the statistical distribution of risks and notably boost predicting accuracy. The purpose of this paper is to present a method for predicting project duration and cost of the project and selecting the best action plan. Control charts are used along with the earned value management method to increase accuracy. This model also provides the possibility of selecting the best action plan to improve project performance. Moreover, this method can be applied in each project phase separately. Finally, a case study is used to investigate the validity of the proposed method.

How to cite this paper
Soltan, S & Ashrafi, M. (2020). Predicting project duration and cost, and selecting the best action plan using statistical methods for earned value management.Journal of Project Management, 5(3), 157-166.

Refrences
Baqerin, M. H., Shafahi, Y., & Kashani, H. (2016). Application of Weibull analysis to evaluate and forecast schedule performance in repetitive projects. Journal of Construction Engineer-ing and Management, 142(2), 04015058.
Batselier, J., & Vanhoucke, M. (2015). Evaluation of deterministic state-of-the-art forecasting approaches for project duration based on earned value management. International Journal of Project Management, 33(7), 1588-1596.
Batselier, J., & Vanhoucke, M. (2017). Improving project forecast accuracy by integrating earned value management with exponential smoothing and reference class forecasting. Inter-national Journal of Project Management, 35(1), 28-43.
Chen, H. L., Chen, W. T., & Lin, Y. L. (2016). Earned value project management: Improving the predictive power of planned value. International Journal of Project Management, 34(1), 22-29.
Colin, J., & Vanhoucke, M. (2016). Empirical perspective on activity durations for project-management simulation studies. Journal of Construction Engineering and Management, 142(1), 04015047.
Fleming, Q. W., & Koppelman, J. M. (2016, December). Earned value project management. Project Management Institute.
Ghorbani, R., Ghousi, R., & Makui, A. (2019). Location of compressed natural gas stations using multi-objective flow refueling location model in the two-way highways: A case study in Iran. Journal of Industrial and Systems Engineering, 12(2), 95-112.
Guide, P. M. B. O. K. (2017). A guide to the project management body of knowledge. Sixth Edit. Project Management Institute, Inc.
Hunter, H., Fitzgerald, R., & Barlow, D. (2014). Improved cost monitoring and control through the Earned Value Management System. Acta Astronautica, 93, 497-500.
Kerzner, H. (2015). Project management 2.0: leveraging tools, distributed collaboration, and metrics for project success. John Wiley & Sons.
Khamooshi, H., & Golafshani, H. (2014). EDM: Earned Duration Management, a new approach to schedule performance management and measurement. International Journal of Project Management, 32(6), 1019-1041.
Liu, S. S., & Lin, Y. C. (2008). Project performance evaluation based on statistical process con-trol techniques. Journal of Construction Engineering and Management, 134(10), 813-819.
Lipke, W. (2002). A study of the normality of earned value management indicators. The Meas-urable News, 4(1), 6.
Lipke, W. (2003). Schedule is different The Measurable News. College of Performance Man-agement of the Project Management Institute.
Lipke, W., Zwikael, O., Henderson, K., & Anbari, F. (2009). Prediction of project outcome: The application of statistical methods to earned value management and earned schedule perfor-mance indexes. International Journal of Project Management, 27(4), 400-407.
Martens, A., & Vanhoucke, M. (2018). An empirical validation of the performance of project control tolerance limits. Automation in Construction, 89, 71-85.
Mortaji, S. T. H., Noorossana, R., & Bagherpour, M. (2015). Project completion time and cost prediction using change point analysis. Journal of Management in Engineering, 31(5), 04014086.
OR-AS. (2019, November 13). Retrieved from Online consultation of the real-life project data-base Website: Web site: http://www.projectmanagement.ugent.be/research/data/realdata
Valle, J. A., & Soares, C. A. P. (2006). The use of earned value analysis (EVA) in the cost man-agement of construction projects. In Proc., Project Management Institute Global Congress, Newtown Square, PA (pp. 1-11).
  • 51
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: Journal of Project Management | Year: 2020 | Volume: 5 | Issue: 3 | Views: 4013 | Reviews: 0

Related Articles:
  • Project scheduling and forecasting by laws of physical movement
  • The advantage of project risk management tools
  • A modified earned value management using activity based costing
  • Diagnosing the success of the construction projects during the initial phas ...
  • A fuzzy neural network to estimate at completion costs of construction proj ...

Add Reviews

Name:*
E-Mail:
Review:
Bold Italic Underline Strike | Align left Center Align right | Insert smilies Insert link URLInsert protected URL Select color | Add Hidden Text Insert Quote Convert selected text from selection to Cyrillic (Russian) alphabet Insert spoiler
winkwinkedsmileam
belayfeelfellowlaughing
lollovenorecourse
requestsadtonguewassat
cryingwhatbullyangry
Security Code: *
Include security image CAPCHA.
Refresh Code

® 2010-2026 GrowingScience.Com