Processing, Please wait...

  • Publisher Home
  • Home
  • 🔙 Back
  • 📚 Journals
    • ⚙️ IJIEC - Industrial Engineering Computations
    • 🌐 IJDNS - Data and Network Science
    • 🧪 CCL - Current Chemistry Letters
    • 💹 AC - Accounting
    • 🎯 DSL - Decision Science Letters
    • 🚛 USCM - Uncertain Supply Chain Management
    • 🏗️ JPM - Journal of Project Management
    • 🏥 HE - Healthcare Engineering
    • 📈 SCI - Scientometrica
    • 🔩 ESM - Engineering Solid Mechanics
    • 🌿 JFS - Journal of Future Sustainability
    • 💼 MSL - Management Science Letters
  • 📝 Submit Article
  • 📊 Statistics
  • 📋 About
    • 📄 About Us
    • 📰 Blog
    • 📢 News
    • 📧 Contact
  • 📺 Tutorial
  • Search:
  • Advanced Search

Growing Science » Journal of Project Management » An ordered precedence constrained flow shop scheduling problem with machine specific preventive maintenance

⭐ Highly Cited Articles

  • Jaya Algorithm
  • Rao Algorithm
  • TLBO Algorithm
  • ChatGPT and Blended Learning

Journals

  • IJIEC (840)
  • IJDS (1032)
  • DSL (759)
  • ESM (434)
  • CCL (563)
  • JPM (350)
  • AC (572)
  • JFS (106)
  • MSL (2658)
  • USCM (1104)
  • HE (56)
  • SCI (53)

JPM Volumes

    • ▼ Volume 11 (103)
      • Issue 1 (24)
      • Issue 2 (22)
      • Issue 3 (30)
      • Issue 4 (27)
    • ▼ Volume 10 (68)
      • Issue 1 (15)
      • Issue 2 (21)
      • Issue 3 (13)
      • Issue 4 (19)
    • ▼ Volume 9 (35)
      • Issue 1 (6)
      • Issue 2 (5)
      • Issue 3 (9)
      • Issue 4 (15)
    • ▼ Volume 8 (21)
      • Issue 1 (6)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • ▼ Volume 7 (21)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (6)
    • ▼ Volume 6 (20)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • ▼ Volume 5 (20)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • ▼ Volume 4 (24)
      • Issue 1 (4)
      • Issue 2 (8)
      • Issue 3 (8)
      • Issue 4 (4)
    • ▼ Volume 3 (17)
      • Issue 1 (4)
      • Issue 2 (5)
      • Issue 3 (4)
      • Issue 4 (4)
    • ▼ Volume 2 (13)
      • Issue 1 (4)
      • Issue 2 (3)
      • Issue 3 (3)
      • Issue 4 (3)
    • ▼ Volume 1 (8)
      • Issue 1 (5)
      • Issue 2 (3)

🔑 Keywords

Jordan(175)
Supply chain management(172)
Vietnam(154)
Customer satisfaction(124)
Performance(117)
Supply chain(115)
Artificial intelligence(108)
Service quality(101)
Competitive advantage(100)
SMEs(95)
Tehran Stock Exchange(94)
Sustainability(94)
optimization(88)
Financial performance(86)
TOPSIS(85)
Trust(85)
Organizational performance(81)
Job satisfaction(81)
Genetic Algorithm(81)
Social media(80)


» Show all keywords

✍️ Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(70)
Mohammad Reza Iravani(65)
Endri Endri(45)
Hotlan Siagian(43)
Muhammad Alshurideh(42)
Dmaithan Almajali(39)
Jumadil Saputra(37)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Sautma Ronni Basana(33)
Barween Al Kurdi(32)
Basrowi Basrowi(31)
Mohammad Khodaei Valahzaghard(30)
Haitham M. Alzoubi(30)
Ni Nyoman Kerti Yasa(30)
Hassan Ghodrati(30)
Shankar Chakraborty(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Mahmoud Allahham(28)


» Show all authors

🌍 Countries

1. Algeria (52)
2. Angola (2)
3. Argentina (22)
4. Armenia (2)
5. Australia (52)
6. Austria (2)
7. Bahrain (26)
8. Bangladesh (58)
9. Belarus (4)
10. Belgium (3)
11. Benin (2)
12. Benin Republic (1)
13. Bhutan (1)
14. Bosnia and Herzegovina (1)
15. Botswana (9)
16. Brazil (40)
17. Brunei (1)
18. Bulgaria (1)
19. Burkina Faso (1)
20. Cameroon (1)
Total: 121 countries

Show all countries
Journal of Project Management
ISSN 2371-8374 (Online) - ISSN 2371-8366 (Print)
Quarterly Publication
Volume 8 Issue 1 pp. 45-56, 2023

An ordered precedence constrained flow shop scheduling problem with machine specific preventive maintenance Pages 45-56 PDF Download PDF

Authors: T. Jayanth Kumar, M. Thangaraj

📋 Author Affiliations:
T.J. Kumar ORCID , M. Thangaraj ORCID
¹ Department of Mathematics, Faculty of Engineering and Technology, Jain University, Karnataka, Bangalore, India
doi 10.5267/j.jpm.2022.8.002
9 Source: Scopus
Crossref Source: CrossRef

🔑 Keywords: Flow shop-scheduling problem, Heuristic algorithm, Preventive Maintenance

Abstract: In reality, the machines may interrupt because of the nature of deterioration of the machines. Thus, it is inevitable to perform maintenance alongside production planning. The preventive maintenance is a schedule of strategic operations that are performed prior to the failure occurring, to retain the system operating at the preferred level of consistency. Thus, preventive maintenance plays a significant role in flow shop scheduling models. With its practical significance, this study addresses a practical three-machine n jobs flow shop-scheduling problem (FSSP) in which machine specific preventive maintenance, where each machine is given with a maintenance schedule is considered. In addition, a practical ordered precedence constraint in which some set of jobs has to process in the specified order irrespective of their processing times is also considered. The problem’s goal is to establish the optimal job sequence and preventive maintenance such that the overall cost of tardiness and preventive maintenance is as minimum as possible. An efficient heuristic approach is designed to tackle the present model, resulting in total cost savings. A comparative analysis is not conducted due to absence of studies on the current problem in the literature. However, Computational experiments are carried out on some test instances and results are reported. The reported results may be useful for future studies.


How to cite this paper
APA: Kumar, T & Thangaraj, M. (2023). An ordered precedence constrained flow shop scheduling problem with machine specific preventive maintenance. Journal of Project Management, 8(1), 45-56.
Chicago/Turabian: Kumar, T & Thangaraj, M. 2023. "An ordered precedence constrained flow shop scheduling problem with machine specific preventive maintenance." Journal of Project Management 8, no. 1 (2023): 45-56.
AMA: Kumar, T & Thangaraj, M. An ordered precedence constrained flow shop scheduling problem with machine specific preventive maintenance. Journal of Project Management. 2023;8(1):45-56.

References
Allahverdi, A., & Allahverdi, M. (2018). Two-machine no-wait flowshop scheduling problem with uncertain setup times to minimize maximum lateness. Computational and Applied Mathematics, 37(5), 6774-6794.
Allahverdi, A., & Al-Anzi, F. S. (2006). A branch-and-bound algorithm for three-machine flowshop scheduling problem to minimize total completion time with separate setup times. European Journal of Operational Research, 169(3), 767-780.
Allahverdi, A., Aydilek, H., & Aydilek, A. (2022). An algorithm for a no-wait flowshop scheduling problem for mini-mizing total tardiness with a constraint on total completion time. International Journal of Industrial Engineering Computations, 13(1), 43-50.
Baskar, A., & Xavior, A. (2012). A Simple Model to Optimize General Flow Shop Scheduling Problems with Known Break down Time and Weights of Jobs. Procedia Engineering, 38(1), 191-196.
Baskar, A., & Xavior, M. A. (2014). Optimization of makespan in job and machine priority environment. Procedia En-gineering, 97, 22-28.
Bożejko, W., Smutnicki, C., Uchroński, M., & Wodecki, M. (2020). Cyclic Two Machine Flow Shop with Disjoint Se-quence-Dependent Setups. In Modelling and Performance Analysis of Cyclic Systems (pp. 31-47). Springer, Cham.
Cheng, S. R., Yin, Y., Wen, C. H., Lin, W. C., Wu, C. C., & Liu, J. (2017). A two-machine flowshop scheduling problem with precedence constraint on two jobs. Soft Computing, 21(8), 2091-2103.
Fernandez-Viagas, V., & Framinan, J. M. (2014). On insertion tie-breaking rules in heuristics for the permutation flow-shop scheduling problem. Computers & Operations Research, 45, 60-67.
Framinan, J. M., Leisten, R., & Rajendran, C. (2003). Different initial sequences for the heuristic of Nawaz, Enscore and Ham to minimize makespan, idletime or flowtime in the static permutation flowshop sequencing problem. Interna-tional Journal of Production Research, 41(1), 121-148.
Gao, J., & Chen, R. (2011). A hybrid genetic algorithm for the distributed permutation flowshop scheduling problem." International Journal of Computational Intelligence Systems, 4(4), 497-508.
Gladky, A. A., Shafransky, Y. M., & Strusevich, V. A. (2004). Flow shop scheduling problems under machine–dependent precedence constraints. Journal of combinatorial optimization, 8(1), 13-28.
Hatami, S., Ruiz, R., & Andrés-Romano, C. (2015). Heuristics and metaheuristics for the distributed assembly permuta-tion flowshop scheduling problem with sequence dependent setup times. International Journal of Production Eco-nomics, 169, 76-88.
Janaki, E., & Mohamed Ismail, A. (2020). Flow Shop Scheduling in Which Processing Time Connected with Probabili-ties and Job Delay Due to Maintenance for M* N Machine. In Information and Communication Technology for Sus-tainable Development (pp. 651-657). Springer, Singapore.
Johnson, S. M. (1954). Optimal two‐and three‐stage production schedules with setup times included. Naval research lo-gistics quarterly, 1(1), 61-68.
Jolai, F., Rabiee, M., & Asefi, H. (2012). A novel hybrid meta-heuristic algorithm for a no-wait flexible flow shop scheduling problem with sequence dependent setup times. International Journal of Production Research, 50(24), 7447-7466.
Kalczynski, P. J., & Kamburowski, J. (2008). An improved NEH heuristic to minimize makespan in permutation flow shops. Computers & Operations Research, 35(9), 3001-3008.
Lee, J. Y., & Kim, Y. D. (2017). Minimizing total tardiness in a two-machine flowshop scheduling problem with availa-bility constraint on the first machine. Computers & Industrial Engineering, 114, 22-30.
Li, W., Nault, B. R., & Ye, H. (2019). Trade-off balancing in scheduling for flow shop production and perioperative pro-cesses. European Journal of Operational Research, 273(3), 817-830.
Liang, Z., Zhong, P., Liu, M., Zhang, C., & Zhang, Z. (2022). A computational efficient optimization of flow shop scheduling problems. Scientific Reports, 12(1), 1-16.
Lin, S. W., & Ying, K. C. (2016). Minimizing makespan for solving the distributed no-wait flowshop scheduling prob-lem. Computers & Industrial Engineering, 99, 202-209.
Marichelvam, M. K., Tosun, Ö., & Geetha, M. (2017). Hybrid monkey search algorithm for flow shop scheduling prob-lem under makespan and total flow time. Applied Soft Computing, 55, 82-92.
Ren, T., Wang, X., Liu, T., Wu, C. C., Bai, D., Lin, L., & Guo, M. (2021). Exact and metaheuristic algorithms for flow-shop scheduling problems with release dates. Engineering Optimization, 1-17.
Ruiz, R., García-Díaz, J. C., & Maroto, C. (2007). Considering scheduling and preventive maintenance in the flowshop sequencing problem. Computers & Operations Research, 34(11), 3314-3330.
Salido, M. A., Escamilla, J., Giret, A., & Barber, F. (2016). A genetic algorithm for energy-efficiency in job-shop scheduling. The International Journal of Advanced Manufacturing Technology, 85(5), 1303-1314.
Semančo, P., & Modrák, V. (2011, October). Hybrid GA-based improvement heuristic with makespan criterion for flow-shop scheduling problems. In International Conference on ENTERprise Information Systems (pp. 11-18). Springer, Berlin, Heidelberg.
Shao, W., Pi, D., & Shao, Z. (2017). Optimization of makespan for the distributed no-wait flow shop scheduling prob-lem with iterated greedy algorithms. Knowledge-Based Systems, 137, 163-181.
Taillard, E. (1990). Some efficient heuristic methods for the flow shop sequencing problem. European journal of Op-erational research, 47(1), 65-74.
Thangaraj, M., Kumar, T., & Nandan, K. (2022). A precedence constrained flow shop scheduling problem with transpor-tation time, breakdown times, and weighted jobs. Journal of Project Management, 7(4), 229-240.
Wang, H., Huang, M., & Wang, J. (2019). An effective metaheuristic algorithm for flowshop scheduling with deteriorat-ing jobs. Journal of Intelligent Manufacturing, 30(7), 2733-2742.
Ye, H., Wang, X., & Liu, K. (2020). Adaptive preventive maintenance for flow shop scheduling with resumable pro-cessing. IEEE Transactions on Automation Science and Engineering, 18(1), 106-113.
  • 34
  • 1
  • 2
  • 3
  • 4
  • 5

📚 Journal: Journal of Project Management | 📅 Year: 2023 | 📖 Volume: 8 | 📄 Issue: 1 | 👁️ Views: 1214 | 📊 Crossref:

Related Articles:
  • A precedence constrained flow shop scheduling problem with transportation time, breakdown times, and weighted jobs
  • An improved algorithm to minimize the total completion time in a two-machine no-wait flow-shop with uncertain setup times
  • An improved NEH heuristic to minimize makespan for flow shop scheduling problems
  • Evaluating the performance of constructive heuristics for the blocking flow shop scheduling problem with setup times
  • Solving group scheduling problem in no-wait flexible flowshop with random machine breakdown

📝 Ready to share your research?

Journal of Project Management is accepting new submissions for upcoming issues. Join our community of authors and publish your work with us.

✓ Open access
✓ Rigorous peer review
✓ Fast publication
📤 Submit Your Manuscript →

📖 Author Guidelines

® 2010-2026 GrowingScience.Com