How to cite this paper
Hsu, J & Hsu, L. (2014). A supplement to an EOQ model with imperfect quality items, inspection errors, shortage backordering, and sales return.International Journal of Industrial Engineering Computations , 5(2), 199-210.
Refrences
C?rdenas-Barr?n, L.E., (2000). Observation on: “Economic production quantity model for items with imperfect quality” [Int. J. Prod. Econ. 64 (2000) 59-64]. International Journal of Production Economics, 67 (2), 201.
C?rdenas-Barr?n, L.E., (2009). Economic production quantity with rework process at a single stage manufacturing system with planned backorders. Computers and Industrial Engineering, 57 (3), 1105-1113.
Chang, H.C., (2013). An economic production quantity model with consolidating shipments of imperfect quality items: A note. International Journal of Production Economics, 144 (2), 507-509.
Eroglu, A., & Ozdemir, G., (2007). An economic order quantity model with defective items and shortages. International Journal of Production Economics, 106 (2), 544-549.
Goyal, S. K., & C?rdenas-Barr?n, L. E., (2002). Note on: economic production quantity model for items with imperfect quality – a practical approach. International Journal of Production Economics, 77, 85–87.
Harris, F.W., (1913). How many parts to make at once. Factory, The Magazine of Management, 10 (2), 135-136, & 152.
Hsu, L.F., (2012). A note on “An economic order quantity (EOQ) for items with imperfect quality and inspection errors.” International Journal of Industrial Engineering Computations, 3 (4), 695-702.
Hsu, J.T., & Hsu, L.F., (2013a). An EOQ model with imperfect quality items, inspection errors, shortage backordering, and sales return. International Journal of Production Economics, 143 (1), 162-170.
Hsu, J.T., & Hsu, L.F., (2013b). Two EPQ models with imperfect production processes, inspection errors, planned backorders, and sales returns. Computers & Industrial Engineering, 64 (1),389-402.
Hughes, T.J.R., (1987). The Finite Element Method. Prentice-Hall, Inc., Englewood Cliffs, NJ.
Khan, M., Jaber, M.Y., Guiffrida, A.L., & Zolfaghari, S., (2011a). A review of the extensions of a modified EOQ model for imperfect quality items. International Journal of Production Economics, 132 (1), 1-12.
Khan, M., Jaber, M.Y., & Bonney, M., (2011b). An economic order quantity (EOQ) for items with imperfect quality and inspection errors. International Journal of Production Economics, 133 (1), 113-118.
Liao, G.L., & Sheu, S.H., (2011). Economic production quantity model for randomly failing production process with minimal repair and imperfect maintenance. International Journal of Production Economics, 130 (1), 118-124.
Maddah, B., & Jaber, M.Y., (2008). Economic order quantity for items with imperfect quality: revisited. International Journal of Production Economics, 112 (2), 808-815.
Ouang, L.Y., & Chang, C.T., (2013). Optimal production lot with imperfect production process under permissible delay in payments and complete backlogging. International Journal of Production Economics, 144 (2), 610-617.
Papachristos, S., & Konstantaras, I., (2006). Economic ordering quantity models for items with imperfect quality. International Journal of Production Economics, 100 (1), 148–154.
Raouf, A., Jain, J.K., & Sathe, P.T., (1983). A cost-minimization model for multicharacteristic component inspection. IIE Transactions, 15 (3), 187–194.
Rezaie, J., & Salimi, N., (2012). Economic order quantity and purchasing price for items with imperfect quality when inspection shifts from buyer to supplier. International Journal of Production Economics, 137 (1), 11-18.
Salameh, M.K., & Jaber, M.Y., (2000). Economic production quantity model for items with imperfect quality. International Journal of Production Economics, 64 (1), 59-64.
Yassine, A., Maddah, B., & Salameh, M., (2012). Disaggregation and consolidation of imperfect quality shipments in an extended EPQ model. International Journal of Production Economics, 135 (1), 345-352.
Yoo, S.H., Kim, D., & Park, M.S., (2009). Economic production quantity model with imperfect-quality items, two-way imperfect inspection and sales return. International Journal of Production Economics, 121 (1), 255-265.
Yoo, S.H., Kim, D., & Park, M.S., (2012). Lot sizing and quality investment with quality cost analyses for imperfect production and inspection processes with commercial return. International Journal of Production Economics, 140 (2), 922-933.
C?rdenas-Barr?n, L.E., (2009). Economic production quantity with rework process at a single stage manufacturing system with planned backorders. Computers and Industrial Engineering, 57 (3), 1105-1113.
Chang, H.C., (2013). An economic production quantity model with consolidating shipments of imperfect quality items: A note. International Journal of Production Economics, 144 (2), 507-509.
Eroglu, A., & Ozdemir, G., (2007). An economic order quantity model with defective items and shortages. International Journal of Production Economics, 106 (2), 544-549.
Goyal, S. K., & C?rdenas-Barr?n, L. E., (2002). Note on: economic production quantity model for items with imperfect quality – a practical approach. International Journal of Production Economics, 77, 85–87.
Harris, F.W., (1913). How many parts to make at once. Factory, The Magazine of Management, 10 (2), 135-136, & 152.
Hsu, L.F., (2012). A note on “An economic order quantity (EOQ) for items with imperfect quality and inspection errors.” International Journal of Industrial Engineering Computations, 3 (4), 695-702.
Hsu, J.T., & Hsu, L.F., (2013a). An EOQ model with imperfect quality items, inspection errors, shortage backordering, and sales return. International Journal of Production Economics, 143 (1), 162-170.
Hsu, J.T., & Hsu, L.F., (2013b). Two EPQ models with imperfect production processes, inspection errors, planned backorders, and sales returns. Computers & Industrial Engineering, 64 (1),389-402.
Hughes, T.J.R., (1987). The Finite Element Method. Prentice-Hall, Inc., Englewood Cliffs, NJ.
Khan, M., Jaber, M.Y., Guiffrida, A.L., & Zolfaghari, S., (2011a). A review of the extensions of a modified EOQ model for imperfect quality items. International Journal of Production Economics, 132 (1), 1-12.
Khan, M., Jaber, M.Y., & Bonney, M., (2011b). An economic order quantity (EOQ) for items with imperfect quality and inspection errors. International Journal of Production Economics, 133 (1), 113-118.
Liao, G.L., & Sheu, S.H., (2011). Economic production quantity model for randomly failing production process with minimal repair and imperfect maintenance. International Journal of Production Economics, 130 (1), 118-124.
Maddah, B., & Jaber, M.Y., (2008). Economic order quantity for items with imperfect quality: revisited. International Journal of Production Economics, 112 (2), 808-815.
Ouang, L.Y., & Chang, C.T., (2013). Optimal production lot with imperfect production process under permissible delay in payments and complete backlogging. International Journal of Production Economics, 144 (2), 610-617.
Papachristos, S., & Konstantaras, I., (2006). Economic ordering quantity models for items with imperfect quality. International Journal of Production Economics, 100 (1), 148–154.
Raouf, A., Jain, J.K., & Sathe, P.T., (1983). A cost-minimization model for multicharacteristic component inspection. IIE Transactions, 15 (3), 187–194.
Rezaie, J., & Salimi, N., (2012). Economic order quantity and purchasing price for items with imperfect quality when inspection shifts from buyer to supplier. International Journal of Production Economics, 137 (1), 11-18.
Salameh, M.K., & Jaber, M.Y., (2000). Economic production quantity model for items with imperfect quality. International Journal of Production Economics, 64 (1), 59-64.
Yassine, A., Maddah, B., & Salameh, M., (2012). Disaggregation and consolidation of imperfect quality shipments in an extended EPQ model. International Journal of Production Economics, 135 (1), 345-352.
Yoo, S.H., Kim, D., & Park, M.S., (2009). Economic production quantity model with imperfect-quality items, two-way imperfect inspection and sales return. International Journal of Production Economics, 121 (1), 255-265.
Yoo, S.H., Kim, D., & Park, M.S., (2012). Lot sizing and quality investment with quality cost analyses for imperfect production and inspection processes with commercial return. International Journal of Production Economics, 140 (2), 922-933.