How to cite this paper
Valavi, D & Pramod, V. (2015). A hybrid fuzzy MCDM approach to maintenance Quality Function Deployment.Decision Science Letters , 4(1), 79-108.
Refrences
Carnevalli, J. A., & Miguel, P. C. (2008). Review, analysis and classification of the literature on QFD—Types of research, difficulties and benefits. International Journal of Production Economics, 114(2), 737-754.
Chan, F. T. S., Lau, H. C. W., Ip, R. W. L., Chan, H. K., & Kong, S. (2005). Implementation of total productive maintenance: a case study. International Journal of Production Economics, 95(1), 71-94.
Chien, T. K., & Su, C. T. (2003). Using the QFD concept to resolve customer satisfaction strategy decisions. International Journal of Quality & Reliability Management, 20(3), 345-359.
Chun, Y., Qi-dong, Y., Li-bin, G., & Bing-bin, C. (2012, June). Research on the maintenance management performance appraisal of oil equipments based on fuzzy AHP method. In Robotics and Applications (ISRA), 2012 IEEE Symposium on (pp. 77-81). IEEE
Dekker, R. (1996). Applications of maintenance optimization models: a review and analysis. Reliability Engineering & System Safety, 51(3), 229-240.
Dehghanian, P., Fotuhi-Firuzabad, M., Bagheri-Shouraki, S., & Razi Kazemi, A. A. (2012). Critical component identification in reliability centered asset management of power distribution systems via fuzzy AHP. Systems Journal, IEEE, 6(4), 593-602
Gaonkar, R. S. P., Verma, A. K., & Srividya, A. (2008). Exploring fuzzy set concept in priority theory for maintenance strategy selection problem.International Journal of Applied Management and Technology, 6(3), 7.
Hunt, R. A., & Xavier, F. B. (2003). The leading edge in strategic QFD.International Journal of Quality & Reliability Management, 20(1), 56-73.
Karapetrovic, S., & Rosenbloom, E. S. (1999). A quality control approach to consistency paradoxes in AHP. European Journal of Operational Research,119(3), 704-718.
Kathawala, Y., & Motwani, J. (1994). Implementing quality function deployment: a systems approach. The TQM Magazine, 6(6), 31-37.
Kwong, C. K., & Bai, H. (2002). A fuzzy AHP approach to the determination of importance weights of customer requirements in quality function deployment.Journal of intelligent manufacturing, 13(5), 367-377.
Lootsma, F. A. (1980). Saaty & apos; s priority theory and the nomination of a senior professor in operations research. European Journal of Operational Research,4(6), 380-388.
Lu, M. H., & Kuei, C. H. (1995). Strategic marketing planning: a quality function deployment approach. International Journal of Quality & Reliability Management, 12(6), 85-96.
McKone, K. E., Schroeder, R. G., & Cua, K. O. (2001). The impact of total productive maintenance practices on manufacturing performance. Journal of operations management, 19(1), 39-58.
Mechefske, C. K., & Wang, Z. (2003). Using fuzzy linguistics to select optimum maintenance and condition monitoring strategies. Mechanical Systems and Signal Processing, 17(2), 305-316.
Ni, G., Xie, M., Wang, W., Wang, J., & Zhang, J. (2010, August). Research on the Risk Assessment Method of Vicarious Management Corporation Based on the Fuzzy AHP Method. In Information Science and Management Engineering (ISME), 2010 International Conference of (Vol. 2, pp. 531-535). IEEE.
Pramod, V. R., Devadasan, S. R., & Jagathy Raj, V. P. (2006). Customer voice adoption for maintenance quality improvement through MQFD and its receptivity analysis. International Journal of Management Practice, 2(2), 83-108.
Pramod, V. R., Devadasan, S. R., & Jagathy Raj, V. P. (2007). Receptivity analysis of TPM among internal customers. International Journal of Technology, Policy and Management, 7(1), 75-88.
Pramod, V. R., Sampath, K., Devadasan, S. R., & Jagathy Raj, V. P. (2007). Multicriteria decision making in maintenance quality function deployment through the analytical hierarchy process. International Journal of Industrial and Systems Engineering, 2(4), 454-478.
Pramod, V. R., Devadasan, S. R., Jagathy Raj, V. P., & Murugesh, R. (2008). MQFD and its receptivity analysis in an Indian electronic switches manufacturing company. International Journal of Management Practice, 3(1), 82-95.
Ross, T. J. (2009). Fuzzy logic with engineering applications. John Wiley & Sons.
Saaty, T. L. (1994). How to make a decision: the analytic hierarchy process.Interfaces, 24(6), 19-43.
Saaty, T. L. (2008). Decision making with the analytic hierarchy process.International journal of services sciences, 1(1), 83-98.
Sherwin, D. (2000). A review of overall models for maintenance management.Journal of Quality in Maintenance Engineering, 6(3), 138-164.
Thalia, S., Tuteja, A., & Dutta, M. (2013, February). Comparative performance analysis of information system security using crisp and fuzzy AHP methods. In Advance Computing Conference (IACC), 2013 IEEE 3rd International (pp. 983-988). IEEE.
Triantaphyllou, E., & Lin, C. T. (1996). Development and evaluation of five fuzzy multiattribute decision-making methods. international Journal of Approximate reasoning, 14(4), 281-310.
Verma, A. K., Srividya, A., & Prabhu Gaonkar, R. S. (2007). Technical Note: Fuzzy Set Solutions for Optimal Maintenance Strategy Selection. Opsearch, 44(3), 261.
Wang, Y., & Luan, X. (2012, August). The Green Supply Chain Evaluation and Construction of a Coal Chemical Enterprise in Hebei Province which Based on Fuzzy-AHP Method. In Industrial Control and Electronics Engineering (ICICEE), 2012 International Conference on (pp. 1146-1149). IEEE.
Yang,L., & Zhang,Y. (2010). Applicationof Fuzzy-AHP Method in the Evaluation of Logistics Capability in E-Commerce Environment.InCommunications and Intelligence Information Security (ICCIIS), 2010 International Conference on (pp. 228-231). IEEE.
Chan, F. T. S., Lau, H. C. W., Ip, R. W. L., Chan, H. K., & Kong, S. (2005). Implementation of total productive maintenance: a case study. International Journal of Production Economics, 95(1), 71-94.
Chien, T. K., & Su, C. T. (2003). Using the QFD concept to resolve customer satisfaction strategy decisions. International Journal of Quality & Reliability Management, 20(3), 345-359.
Chun, Y., Qi-dong, Y., Li-bin, G., & Bing-bin, C. (2012, June). Research on the maintenance management performance appraisal of oil equipments based on fuzzy AHP method. In Robotics and Applications (ISRA), 2012 IEEE Symposium on (pp. 77-81). IEEE
Dekker, R. (1996). Applications of maintenance optimization models: a review and analysis. Reliability Engineering & System Safety, 51(3), 229-240.
Dehghanian, P., Fotuhi-Firuzabad, M., Bagheri-Shouraki, S., & Razi Kazemi, A. A. (2012). Critical component identification in reliability centered asset management of power distribution systems via fuzzy AHP. Systems Journal, IEEE, 6(4), 593-602
Gaonkar, R. S. P., Verma, A. K., & Srividya, A. (2008). Exploring fuzzy set concept in priority theory for maintenance strategy selection problem.International Journal of Applied Management and Technology, 6(3), 7.
Hunt, R. A., & Xavier, F. B. (2003). The leading edge in strategic QFD.International Journal of Quality & Reliability Management, 20(1), 56-73.
Karapetrovic, S., & Rosenbloom, E. S. (1999). A quality control approach to consistency paradoxes in AHP. European Journal of Operational Research,119(3), 704-718.
Kathawala, Y., & Motwani, J. (1994). Implementing quality function deployment: a systems approach. The TQM Magazine, 6(6), 31-37.
Kwong, C. K., & Bai, H. (2002). A fuzzy AHP approach to the determination of importance weights of customer requirements in quality function deployment.Journal of intelligent manufacturing, 13(5), 367-377.
Lootsma, F. A. (1980). Saaty & apos; s priority theory and the nomination of a senior professor in operations research. European Journal of Operational Research,4(6), 380-388.
Lu, M. H., & Kuei, C. H. (1995). Strategic marketing planning: a quality function deployment approach. International Journal of Quality & Reliability Management, 12(6), 85-96.
McKone, K. E., Schroeder, R. G., & Cua, K. O. (2001). The impact of total productive maintenance practices on manufacturing performance. Journal of operations management, 19(1), 39-58.
Mechefske, C. K., & Wang, Z. (2003). Using fuzzy linguistics to select optimum maintenance and condition monitoring strategies. Mechanical Systems and Signal Processing, 17(2), 305-316.
Ni, G., Xie, M., Wang, W., Wang, J., & Zhang, J. (2010, August). Research on the Risk Assessment Method of Vicarious Management Corporation Based on the Fuzzy AHP Method. In Information Science and Management Engineering (ISME), 2010 International Conference of (Vol. 2, pp. 531-535). IEEE.
Pramod, V. R., Devadasan, S. R., & Jagathy Raj, V. P. (2006). Customer voice adoption for maintenance quality improvement through MQFD and its receptivity analysis. International Journal of Management Practice, 2(2), 83-108.
Pramod, V. R., Devadasan, S. R., & Jagathy Raj, V. P. (2007). Receptivity analysis of TPM among internal customers. International Journal of Technology, Policy and Management, 7(1), 75-88.
Pramod, V. R., Sampath, K., Devadasan, S. R., & Jagathy Raj, V. P. (2007). Multicriteria decision making in maintenance quality function deployment through the analytical hierarchy process. International Journal of Industrial and Systems Engineering, 2(4), 454-478.
Pramod, V. R., Devadasan, S. R., Jagathy Raj, V. P., & Murugesh, R. (2008). MQFD and its receptivity analysis in an Indian electronic switches manufacturing company. International Journal of Management Practice, 3(1), 82-95.
Ross, T. J. (2009). Fuzzy logic with engineering applications. John Wiley & Sons.
Saaty, T. L. (1994). How to make a decision: the analytic hierarchy process.Interfaces, 24(6), 19-43.
Saaty, T. L. (2008). Decision making with the analytic hierarchy process.International journal of services sciences, 1(1), 83-98.
Sherwin, D. (2000). A review of overall models for maintenance management.Journal of Quality in Maintenance Engineering, 6(3), 138-164.
Thalia, S., Tuteja, A., & Dutta, M. (2013, February). Comparative performance analysis of information system security using crisp and fuzzy AHP methods. In Advance Computing Conference (IACC), 2013 IEEE 3rd International (pp. 983-988). IEEE.
Triantaphyllou, E., & Lin, C. T. (1996). Development and evaluation of five fuzzy multiattribute decision-making methods. international Journal of Approximate reasoning, 14(4), 281-310.
Verma, A. K., Srividya, A., & Prabhu Gaonkar, R. S. (2007). Technical Note: Fuzzy Set Solutions for Optimal Maintenance Strategy Selection. Opsearch, 44(3), 261.
Wang, Y., & Luan, X. (2012, August). The Green Supply Chain Evaluation and Construction of a Coal Chemical Enterprise in Hebei Province which Based on Fuzzy-AHP Method. In Industrial Control and Electronics Engineering (ICICEE), 2012 International Conference on (pp. 1146-1149). IEEE.
Yang,L., & Zhang,Y. (2010). Applicationof Fuzzy-AHP Method in the Evaluation of Logistics Capability in E-Commerce Environment.InCommunications and Intelligence Information Security (ICCIIS), 2010 International Conference on (pp. 228-231). IEEE.