Processing, Please wait...

  • Publisher Home
  • Home
  • 🔙 Back
  • 📚 Journals
    • ⚙️ IJIEC - Industrial Engineering Computations
    • 🌐 IJDNS - Data and Network Science
    • 🧪 CCL - Current Chemistry Letters
    • 💹 AC - Accounting
    • 🎯 DSL - Decision Science Letters
    • 🚛 USCM - Uncertain Supply Chain Management
    • 🏗️ JPM - Journal of Project Management
    • 🏥 HE - Healthcare Engineering
    • 📈 SCI - Scientometrica
    • 🔩 ESM - Engineering Solid Mechanics
    • 🌿 JFS - Journal of Future Sustainability
    • 💼 MSL - Management Science Letters
  • 📝 Submit Article
  • 📊 Statistics
  • 📋 About
    • 📄 About Us
    • 📰 Blog
    • 📢 News
    • 📧 Contact
  • 📺 Tutorial
  • Search:
  • Advanced Search

Growing Science » Uncertain Supply Chain Management » Minimization of multiproduct fabrication cost featuring rework, commonality, external provider, and postponement

⭐ Highly Cited Articles

  • Jaya Algorithm
  • Rao Algorithm
  • TLBO Algorithm
  • ChatGPT and Blended Learning

Journals

  • IJIEC (840)
  • IJDS (1032)
  • DSL (759)
  • ESM (434)
  • CCL (563)
  • JPM (350)
  • AC (572)
  • JFS (106)
  • MSL (2658)
  • USCM (1104)
  • HE (54)
  • SCI (52)

USCM Volumes

    • ▼ Volume 15 (5)
      • Issue 1 (5)
    • ▼ Volume 14 (22)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (7)
    • ▼ Volume 13 (62)
      • Issue 1 (15)
      • Issue 2 (15)
      • Issue 3 (15)
      • Issue 4 (17)
    • ▼ Volume 12 (244)
      • Issue 1 (55)
      • Issue 2 (59)
      • Issue 3 (63)
      • Issue 4 (67)
    • ▼ Volume 11 (190)
      • Issue 1 (42)
      • Issue 2 (45)
      • Issue 3 (50)
      • Issue 4 (53)
    • ▼ Volume 10 (150)
      • Issue 1 (28)
      • Issue 2 (32)
      • Issue 3 (44)
      • Issue 4 (46)
    • ▼ Volume 9 (117)
      • Issue 1 (25)
      • Issue 2 (26)
      • Issue 3 (32)
      • Issue 4 (34)
    • ▼ Volume 8 (82)
      • Issue 1 (20)
      • Issue 2 (15)
      • Issue 3 (17)
      • Issue 4 (30)
    • ▼ Volume 7 (57)
      • Issue 1 (8)
      • Issue 2 (19)
      • Issue 3 (14)
      • Issue 4 (16)
    • ▼ Volume 6 (25)
      • Issue 1 (7)
      • Issue 2 (6)
      • Issue 3 (6)
      • Issue 4 (6)
    • ▼ Volume 5 (26)
      • Issue 1 (6)
      • Issue 2 (6)
      • Issue 3 (8)
      • Issue 4 (6)
    • ▼ Volume 4 (31)
      • Issue 1 (10)
      • Issue 2 (6)
      • Issue 3 (6)
      • Issue 4 (9)
    • ▼ Volume 3 (39)
      • Issue 1 (9)
      • Issue 2 (13)
      • Issue 3 (10)
      • Issue 4 (7)
    • ▼ Volume 2 (32)
      • Issue 1 (7)
      • Issue 2 (5)
      • Issue 3 (10)
      • Issue 4 (10)
    • ▼ Volume 1 (22)
      • Issue 1 (4)
      • Issue 2 (6)
      • Issue 3 (6)
      • Issue 4 (6)

🔑 Keywords

Jordan(175)
Supply chain management(172)
Vietnam(154)
Customer satisfaction(124)
Performance(117)
Supply chain(115)
Artificial intelligence(108)
Service quality(101)
Competitive advantage(100)
SMEs(95)
Sustainability(94)
Tehran Stock Exchange(94)
optimization(88)
Financial performance(86)
TOPSIS(85)
Trust(85)
Genetic Algorithm(81)
Organizational performance(81)
Job satisfaction(81)
Social media(80)


» Show all keywords

✍️ Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(70)
Mohammad Reza Iravani(65)
Endri Endri(45)
Hotlan Siagian(43)
Muhammad Alshurideh(42)
Dmaithan Almajali(39)
Jumadil Saputra(37)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Sautma Ronni Basana(33)
Barween Al Kurdi(32)
Basrowi Basrowi(31)
Mohammad Khodaei Valahzaghard(30)
Haitham M. Alzoubi(30)
Ni Nyoman Kerti Yasa(30)
Hassan Ghodrati(30)
Shankar Chakraborty(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Mahmoud Allahham(28)


» Show all authors

🌍 Countries

1. Algeria (52)
2. Angola (2)
3. Argentina (22)
4. Armenia (2)
5. Australia (52)
6. Austria (2)
7. Bahrain (26)
8. Bangladesh (58)
9. Belarus (4)
10. Belgium (3)
11. Benin (2)
12. Benin Republic (1)
13. Bhutan (1)
14. Bosnia and Herzegovina (1)
15. Botswana (9)
16. Brazil (40)
17. Brunei (1)
18. Bulgaria (1)
19. Burkina Faso (1)
20. Cameroon (1)
Total: 121 countries

Show all countries
Uncertain Supply Chain Management
ISSN 2291-6830 (Online) - ISSN 2291-6822 (Print)
Quarterly Publication
Volume 10 Issue 2 pp. 353-364, 2022

Minimization of multiproduct fabrication cost featuring rework, commonality, external provider, and postponement Pages 353-364 PDF Download PDF

Authors: Peng-Cheng Sung, Chia-Ming Lai, Yunsen Wang, Yuan-Shyi P. Chiu

📋 Author Affiliations:
P.-C. Sung1, C.-M. Lai ORCID 1, Y. Wang ORCID 2, Y.-S.P. Chiu1
1 Department of Industrial Engineering and Management, Chaoyang University of Technology, Taiwan
2 Department of Accounting and Finance, Feliciano School of Business, Montclair State University, NJ, United States
doi 10.5267/j.uscm.2022.1.003
Crossref 3 Source: CrossRef

🔑 Keywords: Multiproduct fabrication, Supply chain, Commonality, External provider, Postponement

Abstract: This study presents a multiproduct fabrication cost-minimization model featuring external providers, commonality, rework, and postponement in the supply chain environment. Customers’ requirements simultaneously emphasize quality, variety, and fast response time in current markets. To satisfy customer needs, most manufacturers in various industries (e.g., clothing, household goods, automotive, etc.) plan their multiproduct fabrication by incorporating a postponement strategy, rework process, and an outsourcing option. Motivated by the viewpoints above, this study offers a decision support system to address customers’ external expectations while optimizing internal operating expenses and machine utilization. We propose a single-machine, two-stage delayed differentiation system under a rotation cycle policy. All needed common parts are made in stage one, and stage two fabricates different end products. An external provider is hired to supply partially needed common parts to shorten uptime. The defective items are inevitably produced in both stages. They are categorized and reworked to maintain the desired product quality. Finally, we derive an optimal cost-minimization rotation cycle for our model and use a numerical example to investigate the collective and individual influences of reworking, postponement, and outsourcing to external providers on the multiproduct fabrication problem. In summary, this study can offer an optimization solution for production planning in various modern industries.

How to cite this paper
APA: Sung, P., Lai, C., Wang, Y & Chiu, Y. (2022). Minimization of multiproduct fabrication cost featuring rework, commonality, external provider, and postponement. Uncertain Supply Chain Management, 10(2), 353-364.
Chicago/Turabian: Sung, P., Lai, C., Wang, Y & Chiu, Y. 2022. "Minimization of multiproduct fabrication cost featuring rework, commonality, external provider, and postponement." Uncertain Supply Chain Management 10, no. 2 (2022): 353-364.
AMA: Sung, P., Lai, C., Wang, Y & Chiu, Y. Minimization of multiproduct fabrication cost featuring rework, commonality, external provider, and postponement. Uncertain Supply Chain Management. 2022;10(2):353-364.

References
Abboud, N.E. (1996). The markovian two-echelon repairable item provisioning problem. Journal of the Operational Research Society, 47(2), 284-296.
Abukhader, K.M.S., & Onbaşıoğlu, D.Ç. (2021). The effects of total quality management practices on employee performance and the effect of training as a moderating variable. Uncertain Supply Chain Management, 9(3), 521-528.
Al-Salamah, M. (2019). Economic production quantity in an imperfect manufacturing process with synchronous and asynchronous flexible rework rates. Operations Research Perspectives, 6, Art. No. 100103, 1-11.
Al Taweel, A.M. (2019). Sustainable reaction/separation engineering: A critical tool for the long-term wellbeing of the world. Journal of King Saud University - Engineering Sciences, 31(2), 105.
Araz, C., Ozfirat, P.M., & Ozkarahan, I. (2007). An integrated multi-criteria decision-making methodology for outsourcing management. Computers & Operations Research, 34(12), 3738-3756.
Arnold, U. (2000). New dimensions of outsourcing: a combination of transaction cost economics and the core competencies concept. European Journal of Purchasing & Supply Management, 6(1), 23-29.
Chiu, Y.-S.P., Chiu, V., Wang, Y., & Hwang, M.-H. (2020a). A postponement model for multi-item replenishment decision considering overtime, commonality, and quality reassurance. International Journal of Industrial Engineering Computations, 11(4), 509-524.
Chiu, Y.-S.P., Zhao, Z.-Y., Chiu, S.W., & Chiu, V. (2020b). A vendor-buyer coordinated system featuring an unreliable machine, scrap, outsourcing, and multiple shipments. International Journal of Industrial Engineering Computations, 11(3), 341-358.
Chiu, S.W., Chiu, T., Chiu, Y-S.P., & Lin, H-D. (2021). Economic manufacturing quantity model with machine failure, overtime, and rework/disposal of nonconforming items. Management and Production Engineering Review, 12(1), 3-16.
Dan-asabe, B., Yaro, S.A., Yawas, D.S., & Aku, S.Y. (2019). Statistical modeling and optimization of the flexural strength, water absorption and density of a doum palm-Kankara clay filler hybrid composite. Journal of King Saud University - Engineering Sciences, 31(4), 385-394.
Daryanto, Y., & Christata, B.R. (2021). Optimal order quantity considering carbon emission costs, defective items, and partial backorder. Uncertain Supply Chain Management, 9(2), 307-316.
Duan, J., Li, H., & Zhang, Q. (2021) Multiobjective optimization of buffer capacity allocation in multiproduct unreliable production lines using improved adaptive NSGA-II algorithm. Kuwait Journal of Science, 48(1), 72-84.
Guericke, S., Koberstein, A., Schwartz, F., & Voß, S. (2012). A stochastic model for the implementation of postponement strategies in global distribution networks. Decision Support Systems, 53, 294-305.
Homolka, S., Zallet, J., Albert, H., Witt, A-K., & Kranzer, K. (2019). Introduction of quality management in a National Reference Laboratory in Germany. PLoS ONE, 14 (10), Art. No. e0222925.
İnkaya, T., Armbruster, D., Li, H., & Kempf, K.G. (2018). Product variety strategies for vertically differentiated products in a two-stage supply chain. International Journal of Production Research, 56(17), 5930-5944.
Iyer, A.V., Deshpande, V., & Wu, Z. (2003). A postponement model for demand management. Management Science, 49(8), 983-1002.
Jewkes, E.M., & Alfa, A.S. (2009). A queueing model of delayed product differentiation. European Journal of Operational Research, 199, 734-743.
Kaipia, R., & Turkulainen, V. (2016). Managing integration in outsourcing relationships - The influence of cost and quality priorities. Industrial Marketing Management, 61, 114-129.
Krishnamoorthi, C., & Panayappan, S. (2013). An EPQ model for an imperfect production system with rework and shortages. International Journal of Operational Research, 17(1), 104-124.
Li, J. (2004). Performance analysis of production systems with rework loops. IIE Transactions, 36(8), 755-765.
Sadjadi, S.J., Asadi, H., Sadeghian, R., & Sahebi, H. (2018). Retailer Stackelberg game in a supply chain with pricing and service decisions and simple price discount contract. PLoS ONE, 13(4), Art. No. e0195109.
Skowronski, K., Benton, W.C. Jr. (2018). The influence of intellectual property rights on poaching in manufacturing outsourcing. Production and Operations Management, 27(3), 531-552.
Siouris, G.-J., Skilogianni, D., Karagrigoriou, A. (2019). Post model correction in risk analysis and management. International Journal of Mathematical, Engineering and Management Sciences, 4(3), 542-566.
Suroso, A.I., Tandra, H., Syaukat, Y., Najib, M. (2021). The issue in Indonesian palm oil stock decision making: Sustainable and risk criteria. Decision Science Letters, 10(3), 241-246.
  • 17
  • 1
  • 2
  • 3
  • 4
  • 5

📚 Journal: Uncertain Supply Chain Management | 📅 Year: 2022 | 📖 Volume: 10 | 📄 Issue: 2 | 👁️ Views: 1483 | 📊 Crossref: 3

Related Articles:
  • A producer-retailer incorporated multi-item EPQ problem with delayed differentiation, the expedited rate for common parts, multi-delivery and scrap
  • A delayed differentiation multiproduct model with the outsourcing of common parts, overtime strategy for end products, and quality reassurance
  • A multi-item batch fabrication problem featuring delayed product differentiation, outsourcing, and quality assurance
  • A postponement model for multi-item replenishment decision considering overtime, commonality, and quality reassurance
  • Determining the fabrication runtime for a buyer-vendor system with stochastic breakdown, accelerated rate, repairable items, and multi-delivery strategy

📝 Ready to share your research?

Uncertain Supply Chain Management is accepting new submissions for upcoming issues. Join our community of authors and publish your work with us.

✓ Open access
✓ Rigorous peer review
✓ Fast publication
📤 Submit Your Manuscript →

📖 Author Guidelines

® 2010-2026 GrowingScience.Com