Processing, Please wait...

  • Publisher Home
  • Home
  • 🔙 Back
  • 📚 Journals
    • ⚙️ IJIEC - Industrial Engineering Computations
    • 🌐 IJDNS - Data and Network Science
    • 🧪 CCL - Current Chemistry Letters
    • 💹 AC - Accounting
    • 🎯 DSL - Decision Science Letters
    • 🚛 USCM - Uncertain Supply Chain Management
    • 🏗️ JPM - Journal of Project Management
    • 🏥 HE - Healthcare Engineering
    • 📈 SCI - Scientometrica
    • 🔩 ESM - Engineering Solid Mechanics
    • 🌿 JFS - Journal of Future Sustainability
    • 💼 MSL - Management Science Letters
  • 📝 Submit Article
  • 📊 Statistics
  • 📋 About
    • 📄 About Us
    • 📰 Blog
    • 📢 News
    • 📧 Contact
  • 📺 Tutorial
  • Search:
  • Advanced Search

Growing Science » Tags cloud » Stochastic scheduling

⭐ Highly Cited Articles

  • Jaya Algorithm
  • Rao Algorithm
  • TLBO Algorithm
  • ChatGPT and Blended Learning

Journals

  • IJIEC (840)
  • IJDS (1032)
  • DSL (759)
  • ESM (434)
  • CCL (563)
  • JPM (350)
  • AC (572)
  • JFS (106)
  • MSL (2658)
  • USCM (1104)
  • HE (55)
  • SCI (53)

🔑 Keywords

Jordan(175)
Supply chain management(172)
Vietnam(154)
Customer satisfaction(124)
Performance(117)
Supply chain(115)
Artificial intelligence(108)
Service quality(101)
Competitive advantage(100)
SMEs(95)
Tehran Stock Exchange(94)
Sustainability(94)
optimization(88)
Financial performance(86)
TOPSIS(85)
Trust(85)
Genetic Algorithm(81)
Organizational performance(81)
Job satisfaction(81)
Knowledge Management(80)


» Show all keywords

✍️ Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(70)
Mohammad Reza Iravani(65)
Endri Endri(45)
Hotlan Siagian(43)
Muhammad Alshurideh(42)
Dmaithan Almajali(39)
Jumadil Saputra(37)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Sautma Ronni Basana(33)
Barween Al Kurdi(32)
Basrowi Basrowi(31)
Mohammad Khodaei Valahzaghard(30)
Haitham M. Alzoubi(30)
Ni Nyoman Kerti Yasa(30)
Hassan Ghodrati(30)
Shankar Chakraborty(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Mahmoud Allahham(28)


» Show all authors

🌍 Countries

1. Algeria (52)
2. Angola (2)
3. Argentina (22)
4. Armenia (2)
5. Australia (52)
6. Austria (2)
7. Bahrain (26)
8. Bangladesh (58)
9. Belarus (4)
10. Belgium (3)
11. Benin (2)
12. Benin Republic (1)
13. Bhutan (1)
14. Bosnia and Herzegovina (1)
15. Botswana (9)
16. Brazil (40)
17. Brunei (1)
18. Bulgaria (1)
19. Burkina Faso (1)
20. Cameroon (1)
Total: 121 countries

Show all countries
Sort articles by: 📖 Volume | 📅 Date | ⭐ Most Rates | 👁️ Most Views | 🚀 Rising Stars | 🔗 Citations (Scopus) | 🔥 Hot Papers
1.

Performance evaluation of a GRASP-based approach for stochastic scheduling problems Pages 359-368 PDF Download PDF

Authors: Mayra Alejandra Cárdenas Duarte, Julián Alberto Rojas Cepeda, Eliana María González-Neira, David Barrera, Viviana Rojas Cortés, Gabriel Zambrano Rey

doi 10.5267/j.uscm.2017.4.002

🔑 Keywords: Stochastic scheduling, GRASP, Common random numbers, Monte Carlo simulation, Single machine

Abstract:
Stochastic scheduling addresses several forms of uncertainty to represent better production environments in the real world. Stochastic scheduling has applications on several areas such as logistics, transportation, production, and healthcare, among others. This paper aims to evaluate the performance of various greedy functions for a GRASP-based approach, under stochastic processing times. Since simulation is used for estimating the objective function, two simulation techniques, Monte Carlo simulation and Common Random Numbers (CRN), are used to compare the performance of different greedy (utility) functions within the GRASP. In order to validate the proposed methodology, the expected total weighted tardiness minimization for a single machine problem was taken as case study. Results showed that both, CRN and Monte Carlo, are not statistically different regarding the expected weighted tardiness results. However, CRN showed a better performance in terms of simulation replications and the confidence interval size for the difference between means. Furthermore, the statistical analysis confirmed that there is a significant difference between greedy functions.
Details
  • 0
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: USCM | Year: 2017 | Volume: 5 | Issue: 4 | Views: 2187

 
2.

A branch and bound for single machine stochastic scheduling to minimize the maximum lateness Pages 499-510 PDF Download PDF

Authors: Hamidreza Haddad, Mohammad Ebrahim Arbabian, Keyvan Kamandani Pour

doi 10.5267/j.ijiec.2011.11.001

🔑 Keywords: Deterioration, Single machine, Stochastic scheduling, Tardy jobs

Abstract:
This paper studies the problem of single machine stochastic scheduling with random processing times, deterministic due dates and an independent setup time. The jobs are also deteriorated based on the position, which their processes are done. The objective function is to find a schedule of jobs, which minimizes the expected value of maximum lateness. A branch and bound scheme is presented to solve the problem analytically and a simulated annealing meta-heuristic (SA) is also provided for solving the problem in larger scales. Computational experiments demonstrate that the proposed SA is capable of finding near optimal solutions with very low gap.
Details
  • 34
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2012 | Volume: 3 | Issue: 3 | Views: 3065

 
3.

Scheduling stochastic two-machine flow shop problems to minimize expected makespan Pages 163-174 PDF Download PDF

Authors: Mehdi Heydari, Mohammad Mahdavi Mazdeh, Mohammad Bayat

doi 10.5267/j.dsl.2013.04.005

🔑 Keywords: Expected makespan minimization, Flow shop scheduling, Stochastic flow shop, Stochastic scheduling

Abstract:
During the past few years, despite tremendous contribution on deterministic flow shop problem, there are only limited number of works dedicated on stochastic cases. This paper examines stochastic scheduling problems in two-machine flow shop environment for expected makespan minimization where processing times of jobs are normally distributed. Since jobs have stochastic processing times, to minimize the expected makespan, the expected sum of the second machine’s free times is minimized. In other words, by minimization waiting times for the second machine, it is possible to reach the minimum of the objective function. A mathematical method is proposed which utilizes the properties of the normal distributions. Furthermore, this method can be used as a heuristic method for other distributions, as long as the means and variances are available. The performance of the proposed method is explored using some numerical examples.
Details
  • 51
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: DSL | Year: 2013 | Volume: 2 | Issue: 3 | Views: 3898

 

® 2010-2026 GrowingScience.Com