Processing, Please wait...

  • Home
  • About Us
  • Search:
  • Advanced Search

Growing Science » Tags cloud » Assembly flow shop

Journals

  • IJIEC (747)
  • MSL (2643)
  • DSL (668)
  • CCL (508)
  • USCM (1092)
  • ESM (413)
  • AC (562)
  • JPM (271)
  • IJDS (912)
  • JFS (91)
  • HE (32)
  • SCI (26)

Keywords

Supply chain management(166)
Jordan(161)
Vietnam(149)
Customer satisfaction(120)
Performance(113)
Supply chain(110)
Service quality(98)
Competitive advantage(95)
Tehran Stock Exchange(94)
SMEs(87)
optimization(86)
Financial performance(83)
Trust(83)
TOPSIS(83)
Sustainability(81)
Job satisfaction(80)
Factor analysis(78)
Social media(78)
Knowledge Management(77)
Artificial intelligence(77)


» Show all keywords

Authors

Naser Azad(82)
Mohammad Reza Iravani(64)
Zeplin Jiwa Husada Tarigan(63)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(39)
Jumadil Saputra(36)
Dmaithan Almajali(36)
Muhammad Turki Alshurideh(35)
Barween Al Kurdi(32)
Ahmad Makui(32)
Basrowi Basrowi(31)
Hassan Ghodrati(31)
Mohammad Khodaei Valahzaghard(30)
Sautma Ronni Basana(29)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)
Haitham M. Alzoubi(27)


» Show all authors

Countries

Iran(2183)
Indonesia(1290)
India(787)
Jordan(786)
Vietnam(504)
Saudi Arabia(453)
Malaysia(441)
United Arab Emirates(220)
China(206)
Thailand(153)
United States(111)
Turkey(106)
Ukraine(104)
Egypt(98)
Canada(92)
Peru(88)
Pakistan(85)
United Kingdom(80)
Morocco(79)
Nigeria(78)


» Show all countries
Sort articles by: Volume | Date | Most Rates | Most Views | Reviews | Alphabet
1.

Heuristics for production scheduling problem with machining and assembly operations Pages 185-198 Right click to download the paper Download PDF

Authors: A S Bhongade, P.M. Khodke

DOI: 10.5267/j.ijiec.2011.09.003

Keywords: Production scheduling, Assembly flow shop, Heuristics, Makespan

Abstract:
This work deals with production scheduling problem in an assembly flow shop, having parts machining followed by their subsequent assembly operations. Limited heuristics available on the problem, are based on unrealistic assumption that every part is processed on all machines. In this paper, two heuristics NEH_BB and Disjunctive are proposed to solve assembly flow shop scheduling problem where every part may not be processed on each machine. Exhaustive computational experiments are conducted with 60 trials each. The methods are found to be applicable to large size problems. The objective functions used for comparison are makespan and computational time. Disjunctive method takes very less computational time as compared to NEH_BB and hence claimed to be the better among available approaches for finding solution in assembly flow shop problems.
Details
  • 51
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2012 | Volume: 3 | Issue: 2 | Views: 3061 | Reviews: 0

 

® 2010-2026 GrowingScience.Com