Processing, Please wait...

  • Home
  • About Us
  • Search:
  • Advanced Search

Growing Science » Authors » Zhong-Yun Zhao

Journals

  • IJIEC (747)
  • MSL (2643)
  • DSL (668)
  • CCL (508)
  • USCM (1092)
  • ESM (413)
  • AC (562)
  • JPM (271)
  • IJDS (912)
  • JFS (91)
  • HE (26)
  • SCI (26)

Keywords

Supply chain management(166)
Jordan(161)
Vietnam(149)
Customer satisfaction(120)
Performance(113)
Supply chain(110)
Service quality(98)
Competitive advantage(95)
Tehran Stock Exchange(94)
SMEs(87)
optimization(86)
Trust(83)
Financial performance(83)
Sustainability(81)
TOPSIS(81)
Job satisfaction(80)
Factor analysis(78)
Social media(78)
Genetic Algorithm(77)
Knowledge Management(77)


» Show all keywords

Authors

Naser Azad(82)
Mohammad Reza Iravani(64)
Zeplin Jiwa Husada Tarigan(62)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(39)
Jumadil Saputra(36)
Dmaithan Almajali(36)
Muhammad Turki Alshurideh(35)
Barween Al Kurdi(32)
Ahmad Makui(32)
Basrowi Basrowi(31)
Hassan Ghodrati(31)
Mohammad Khodaei Valahzaghard(30)
Sautma Ronni Basana(29)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)
Haitham M. Alzoubi(27)


» Show all authors

Countries

Iran(2181)
Indonesia(1289)
Jordan(786)
India(786)
Vietnam(504)
Saudi Arabia(452)
Malaysia(441)
United Arab Emirates(220)
China(206)
Thailand(153)
United States(110)
Turkey(106)
Ukraine(104)
Egypt(98)
Canada(92)
Peru(88)
Pakistan(85)
United Kingdom(80)
Morocco(79)
Nigeria(78)


» Show all countries
Sort articles by: Volume | Date | Most Rates | Most Views | Reviews | Alphabet
1.

Investigating the collective impact of postponement, scrap, and external suppliers on multiproduct replenishing decision Pages 147-156 Right click to download the paper Download PDF

Authors: Yuan-Shyi P. Chiu, Zhong-Yun Zhao, Fan-Yun Pai, Tiffany Chiu

DOI: 10.5267/j.ijiec.2022.9.001

Keywords: Multiproduct replenishing decision, Delayed differentiation, External supplier, Postponement, Product quality issue, Scrap

Abstract:
This study examines the collective impact of postponement, scrap, and subcontracting standard components on the multiproduct replenishing decisions. Rapid response, desirable quality, and various goods guide the client’s demands in today’s competitive market. Therefore, many manufacturing firms search for alternative fabrication and outsourcing strategies during the production planning stage to satisfy the client’s expectations, minimize fabrication-inventory costs, and smoothen machine utilization. To effectively help producers meet today's client's needs and enhance their competitive advantage, we develop a two-stage multiproduct replenishing system incorporating scraps, standard parts subcontracting, commonality, and delayed differentiation. To reduce the production uptime, stage one has a hybrid fabrication process for the common components (i.e., a partial outsourcing strategy), and stage two manufactures the finished multiproduct. In-house fabrication processes in both stages are imperfect; a screening process detects and removes scraps to maintain the finished batch quality. We determine the cost-minimized operating cycle. The findings reveal the collective impact of postponement, scrap, and external suppliers on this multi-product replenishment problem and can be used to facilitate production planning and decision-making.
Details
  • 34
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2023 | Volume: 14 | Issue: 1 | Views: 1045 | Reviews: 0

 
2.

A vendor-buyer coordinated system featuring an unreliable machine, scrap, outsourcing, and multiple shipments Pages 341-358 Right click to download the paper Download PDF

Authors: Yuan-Shyi Peter Chiu, Zhong-Yun Zhao, Singa Wang Chiu, Victoria Chiu

DOI: 10.5267/j.ijiec.2020.1.004

Keywords: Fabrication runtime, Unreliable machine, Outsourcing, Vendor-buyer coordinated system, Multi-shipment, Scrap

Abstract:
Operating in today’s highly competitive global markets, transnational enterprises always seek to optimize internal vendor-buyer coordinated systems to ensure timeliness and quality deliveries, given the reality of unreliable machines and limited capacity. To facilitate accurate decision making to help organizations gain competitive advantages in such situations, this study explores an intra-supply-chain problem featuring a partial outsourcing batch fabrication plan, random scrap, Poisson-distributed breakdown rate, and multiple shipments of end-product. First, we build a model to characterize the problem clearly. Then, we carry out formulations, analyses, and derivations of the model to attain the problem’s cost function. We then use differential calculus and propose a specific algorithm to confirm the convexity of the obtained cost function and derive the optimal runtime. Finally, we offer a numerical illustration to demonstrate the result’s applicability for other business circumstances. Additional elements of the problem are then discussed, including the individual and combined influence of variations in scrap, outsourcing, breakdown, and shipping frequency. The features of an optimal operating policy and cost relevant parameters are now revealed to assist management with strategic planning and decision making in real-world intra-supply-chain environments.

Details
  • 0
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2020 | Volume: 11 | Issue: 3 | Views: 1394 | Reviews: 0

 

® 2010-2026 GrowingScience.Com