Processing, Please wait...

  • Home
  • About Us
  • Search:
  • Advanced Search

Growing Science » Authors » Shakuntala Singla

Journals

  • IJIEC (747)
  • MSL (2643)
  • DSL (668)
  • CCL (508)
  • USCM (1092)
  • ESM (413)
  • AC (562)
  • JPM (271)
  • IJDS (912)
  • JFS (96)
  • HE (32)
  • SCI (26)

Keywords

Supply chain management(166)
Jordan(161)
Vietnam(149)
Customer satisfaction(120)
Performance(113)
Supply chain(111)
Service quality(98)
Competitive advantage(95)
Tehran Stock Exchange(94)
SMEs(87)
optimization(86)
Trust(83)
TOPSIS(83)
Financial performance(83)
Sustainability(82)
Job satisfaction(80)
Factor analysis(78)
Social media(78)
Artificial intelligence(77)
Knowledge Management(77)


» Show all keywords

Authors

Naser Azad(82)
Mohammad Reza Iravani(64)
Zeplin Jiwa Husada Tarigan(63)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(39)
Jumadil Saputra(36)
Dmaithan Almajali(36)
Muhammad Turki Alshurideh(35)
Barween Al Kurdi(32)
Ahmad Makui(32)
Basrowi Basrowi(31)
Hassan Ghodrati(31)
Mohammad Khodaei Valahzaghard(30)
Sautma Ronni Basana(29)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)
Haitham M. Alzoubi(27)


» Show all authors

Countries

Iran(2184)
Indonesia(1290)
India(788)
Jordan(786)
Vietnam(504)
Saudi Arabia(453)
Malaysia(441)
United Arab Emirates(220)
China(206)
Thailand(153)
United States(111)
Turkey(106)
Ukraine(104)
Egypt(98)
Canada(92)
Peru(88)
Pakistan(85)
United Kingdom(80)
Morocco(79)
Nigeria(78)


» Show all countries
Sort articles by: Volume | Date | Most Rates | Most Views | Reviews | Alphabet
1.

No idle flow shop scheduling models with separated set-up times and concept of job weightage to optimize rental cost of machines Pages 101-108 Right click to download the paper Download PDF

Authors: Shakuntala Singla, Harshleen Kaur, Deepak Gupta, Jatinder Kaur

DOI: 10.5267/j.jpm.2024.2.001

Keywords: Flowshop, Set-up time, No idle, Sequence, Scheduling, Weightage

Abstract:
The current paper investigates a two-stage flow shop scheduling model with no idle restriction, in which the time taken by machines to set-up is separately considered from the processing time. Owing to inherent usefulness as well as relevance in real-world situations, jobs' weight has additionally included. To eliminate machine idle time and cutting machine cost of rental, the reason for the conduct of the study is to provide a heuristic algorithm which, once put into practice, processes jobs in an optimal way, guarantees in smallest conceivable make span. Multiple computational examples generated in MATLAB 2019a serve as testament to the efficacy of the proposed strategy. The outcomes are contrasted with the current methods that Johnson, Palmer and NEH have demonstrated.
Details
  • 0
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2024 | Volume: 9 | Issue: 2 | Views: 836 | Reviews: 0

 

® 2010-2026 GrowingScience.Com