Processing, Please wait...

  • Publisher Home
  • Home
  • ๐Ÿ”™ Back
  • ๐Ÿ“š Journals
    • โš™๏ธ IJIEC - Industrial Engineering Computations
    • ๐ŸŒ IJDNS - Data and Network Science
    • ๐Ÿงช CCL - Current Chemistry Letters
    • ๐Ÿ’น AC - Accounting
    • ๐ŸŽฏ DSL - Decision Science Letters
    • ๐Ÿš› USCM - Uncertain Supply Chain Management
    • ๐Ÿ—๏ธ JPM - Journal of Project Management
    • ๐Ÿฅ HE - Healthcare Engineering
    • ๐Ÿ“ˆ SCI - Scientometrica
    • ๐Ÿ”ฉ ESM - Engineering Solid Mechanics
    • ๐ŸŒฟ JFS - Journal of Future Sustainability
    • ๐Ÿ’ผ MSL - Management Science Letters
  • ๐Ÿ“ Submit Article
  • ๐Ÿ“Š Statistics
  • ๐Ÿ“‹ About
    • ๐Ÿ“„ About Us
    • ๐Ÿ“ฐ Blog
    • ๐Ÿ“ข News
    • ๐Ÿ“ง Contact
  • ๐Ÿ“บ Tutorial
  • Search:
  • Advanced Search

Growing Science » Authors » Oussama Saoula

โญ Highly Cited Articles

  • Jaya Algorithm
  • Rao Algorithm
  • TLBO Algorithm
  • ChatGPT and Blended Learning

Journals

  • IJIEC (840)
  • IJDS (1032)
  • DSL (759)
  • ESM (434)
  • CCL (563)
  • JPM (350)
  • AC (572)
  • JFS (106)
  • MSL (2658)
  • USCM (1104)
  • HE (56)
  • SCI (53)

๐Ÿ”‘ Keywords

Jordan(175)
Supply chain management(172)
Vietnam(154)
Customer satisfaction(124)
Performance(117)
Supply chain(115)
Artificial intelligence(108)
Service quality(101)
Competitive advantage(100)
SMEs(95)
Tehran Stock Exchange(94)
Sustainability(94)
optimization(88)
Financial performance(86)
TOPSIS(85)
Trust(85)
Organizational performance(81)
Job satisfaction(81)
Genetic Algorithm(81)
Social media(80)


» Show all keywords

โœ๏ธ Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(70)
Mohammad Reza Iravani(65)
Endri Endri(45)
Hotlan Siagian(43)
Muhammad Alshurideh(42)
Dmaithan Almajali(39)
Jumadil Saputra(37)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Sautma Ronni Basana(33)
Barween Al Kurdi(32)
Basrowi Basrowi(31)
Mohammad Khodaei Valahzaghard(30)
Haitham M. Alzoubi(30)
Ni Nyoman Kerti Yasa(30)
Hassan Ghodrati(30)
Shankar Chakraborty(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Mahmoud Allahham(28)


» Show all authors

๐ŸŒ Countries

1. Algeria (52)
2. Angola (2)
3. Argentina (22)
4. Armenia (2)
5. Australia (52)
6. Austria (2)
7. Bahrain (26)
8. Bangladesh (58)
9. Belarus (4)
10. Belgium (3)
11. Benin (2)
12. Benin Republic (1)
13. Bhutan (1)
14. Bosnia and Herzegovina (1)
15. Botswana (9)
16. Brazil (40)
17. Brunei (1)
18. Bulgaria (1)
19. Burkina Faso (1)
20. Cameroon (1)
Total: 121 countries

Show all countries
Sort articles by: ๐Ÿ“– Volume | ๐Ÿ“… Date | โญ Most Rates | ๐Ÿ‘๏ธ Most Views | ๐Ÿš€ Rising Stars | ๐Ÿ”— Citations (Scopus) | ๐Ÿ”ฅ Hot Papers
1.

Factors causing mismanagement in public/private contracts: An Indonesian perspective Pages 1429-1438 PDF Download PDF

Authors: Norazida Mohamed, A. Muhtadi Ridwan, Oussama Saoula, Mustafa Rashid Issa

doi 10.5267/j.msl.2019.5.008

๐Ÿ”‘ Keywords: Contract management, Planning and scheduling, Contractor, Consultant, Indonesia

Abstract:
The objective of this study is to examine the impact of client, consultant and contractor related fac-tors on mismanagement in public and private contracts in the region of Indonesia. A structural questionnaire is developed for the selected items after detailed investigation of present literature. A final sample of 137 respondents associated with various contracts in the region of Indonesia is collected with demographic details and regression analysis. It is observed that factors like lack of strategy, failure to compile the documentary requirements, poor planning, delay in decision making, financial issues, late payments, difficulty in getting work permits and lack of management expertise are core issues, creating mismanagement in public and private contracts. In consultant related factors, role of inexperienced consultant, poor planning, late of instructions from architects, poor contract management, and poor-quality assurance are the key determinants of mismanagement in contracts. While contractor related factors like poor planning and scheduling, late or improper submission of con-tract, inadequate site supervision and inspection, poor construction methods, weak leadership, and lack of communication between the parties are the key indicators of mismanagement in contracts. As per significance, this study is found to be a reasonable addition in the present literature from the context of contract management. Originality of the study covers the significant findings for the policy makers in the field of public and private contracts. Study can be reworked in future through better sampling, and addition of more factors related to materials, equipment and labor causing for the poor delivery of the contracts.
Details
  • 34
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: MSL | Year: 2019 | Volume: 9 | Issue: 9 | Views: 2366

 
2.

Contract management and performance characteristics: An empirical and managerial implication for Indonesia Pages 1289-1298 PDF Download PDF

Authors: Kamaruzzaman Muhammad, Oussama Saoula, Mustafa Rashid Issa, Umair Ahmed

doi 10.5267/j.msl.2019.4.012

๐Ÿ”‘ Keywords: Contract management, Firm performance, Project delivery, Indonesia

Abstract:
This study intends to cover the relationship between contract management and performance characteristics from the context of Indonesia. To address this objective, contract management is observed as the main independent variable while performance through nine items is considered as dependent variable. A questionnaire is developed through some selected factors and distributed among various respondents, dealing directly or indirectly with the projects. A sample of 70 respondents is finalized with no missing values. Empirical findings suggest that for the firm performance different variables such as nature of the solution, cost & benefit analysis are significantly associated with the contract length. While project delivery and project quality are negatively associated with the contract length. Findings of the study are highly recommended for the contract managers and similar individuals, responsible for the smooth business performance. However, future studies can be conducted with the addition of more explanatory factors for contract management with better sample size. Manage-rial implication of the study defines that Government and construction companies should reconsider the stated factors for the improved results through resolution of the conflict with the customers, cost benefit analysis and timely delivery of the project with budgetary compliance.
Details
  • 51
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: MSL | Year: 2019 | Volume: 9 | Issue: 8 | Views: 4883

 

® 2010-2026 GrowingScience.Com