Processing, Please wait...

  • Home
  • About Us
  • Search:
  • Advanced Search

Growing Science » Authors » Caio Paziani Tomazella

Journals

  • IJIEC (747)
  • MSL (2643)
  • DSL (668)
  • CCL (508)
  • USCM (1092)
  • ESM (413)
  • AC (562)
  • JPM (271)
  • IJDS (912)
  • JFS (96)
  • HE (32)
  • SCI (26)

Keywords

Supply chain management(166)
Jordan(161)
Vietnam(149)
Customer satisfaction(120)
Performance(113)
Supply chain(111)
Service quality(98)
Competitive advantage(95)
Tehran Stock Exchange(94)
SMEs(87)
optimization(86)
Trust(83)
TOPSIS(83)
Financial performance(83)
Sustainability(82)
Job satisfaction(80)
Factor analysis(78)
Social media(78)
Artificial intelligence(77)
Knowledge Management(77)


» Show all keywords

Authors

Naser Azad(82)
Mohammad Reza Iravani(64)
Zeplin Jiwa Husada Tarigan(63)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(39)
Jumadil Saputra(36)
Dmaithan Almajali(36)
Muhammad Turki Alshurideh(35)
Barween Al Kurdi(32)
Ahmad Makui(32)
Basrowi Basrowi(31)
Hassan Ghodrati(31)
Mohammad Khodaei Valahzaghard(30)
Sautma Ronni Basana(29)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)
Haitham M. Alzoubi(27)


» Show all authors

Countries

Iran(2184)
Indonesia(1290)
India(788)
Jordan(786)
Vietnam(504)
Saudi Arabia(453)
Malaysia(441)
United Arab Emirates(220)
China(206)
Thailand(153)
United States(111)
Turkey(106)
Ukraine(104)
Egypt(98)
Canada(92)
Peru(88)
Pakistan(85)
United Kingdom(80)
Morocco(79)
Nigeria(78)


» Show all countries
Sort articles by: Volume | Date | Most Rates | Most Views | Reviews | Alphabet
1.

Solution methods for the integrated permutation flowshop and vehicle routing problem Pages 155-166 Right click to download the paper Download PDF

Authors: Marcelo Seido Nagano, Caio Paziani Tomazella, Roberto Fernandes Tavares-Neto, Levi Ribeiro de Abreu

DOI: 10.5267/j.jpm.2022.1.002

Keywords: Integrated Scheduling, Flowshop, Distribution, Mixed-Integer Programming, Iterated Greedy

Abstract:
The integration between production and distribution to minimize total elapsed time is an important issue for industries that produce products with a short lifespan. However, the literature focus on production environments with a single stage. This paper enhances the complexity of the production system of an integrated production and distribution system by considering flowshop environment decisions integrated with a vehicle routing problem decision. In this case, each order is produced in a permutation flowshop subsystem and then shipped to its destination by a capacitated vehicle, and the objective is to sequence these orders to minimize the makespan of the schedule. This paper uses two approaches to address this integrated problem: a mixed-integer formulation and an Iterated Greedy algorithm. The experimentation shows that the Iterated Greedy algorithm yields results with a 0.02% deviation from the optimal for problems with five jobs, and is a viable option to be used in practical cases due to its short computational time.
Details
  • 85
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2022 | Volume: 7 | Issue: 3 | Views: 1068 | Reviews: 0

 

® 2010-2026 GrowingScience.Com