Processing, Please wait...

  • Home
  • About Us
  • Search:
  • Advanced Search

Growing Science » Tags cloud » Stochastic machine breakdown

Journals

  • IJIEC (747)
  • MSL (2643)
  • DSL (668)
  • CCL (508)
  • USCM (1092)
  • ESM (413)
  • AC (562)
  • JPM (271)
  • IJDS (912)
  • JFS (91)
  • HE (26)
  • SCI (26)

Keywords

Supply chain management(166)
Jordan(161)
Vietnam(149)
Customer satisfaction(120)
Performance(113)
Supply chain(110)
Service quality(98)
Competitive advantage(95)
Tehran Stock Exchange(94)
SMEs(87)
optimization(86)
Trust(83)
Financial performance(83)
Sustainability(81)
TOPSIS(81)
Job satisfaction(80)
Factor analysis(78)
Social media(78)
Genetic Algorithm(77)
Knowledge Management(77)


» Show all keywords

Authors

Naser Azad(82)
Mohammad Reza Iravani(64)
Zeplin Jiwa Husada Tarigan(62)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(39)
Jumadil Saputra(36)
Dmaithan Almajali(36)
Muhammad Turki Alshurideh(35)
Barween Al Kurdi(32)
Ahmad Makui(32)
Basrowi Basrowi(31)
Hassan Ghodrati(31)
Mohammad Khodaei Valahzaghard(30)
Sautma Ronni Basana(29)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)
Haitham M. Alzoubi(27)


» Show all authors

Countries

Iran(2181)
Indonesia(1289)
Jordan(786)
India(786)
Vietnam(504)
Saudi Arabia(452)
Malaysia(441)
United Arab Emirates(220)
China(206)
Thailand(153)
United States(110)
Turkey(106)
Ukraine(104)
Egypt(98)
Canada(92)
Peru(88)
Pakistan(85)
United Kingdom(80)
Morocco(79)
Nigeria(78)


» Show all countries
Sort articles by: Volume | Date | Most Rates | Most Views | Reviews | Alphabet
1.

A production inventory model with flexible manufacturing, random machine breakdown and stochastic repair time Pages 575-588 Right click to download the paper Download PDF

Authors: S.R. Singh, Leena Prasher

DOI: 10.5267/j.ijiec.2014.7.003

Keywords: Stochastic machine breakdown, Stochastic repair time, Stock dependent demand, Volume flexible manufacturing system

Abstract:
This paper derives a production inventory model over infinite planning horizon with flexible but unreliable manufacturing process and the stochastic repair time. Demand is stock dependent and during the period of sale it depends on reduction on selling price. Production rate is a function of demand and reliability of the production equipment is assumed to be exponentially decreasing function of time. Repair time is estimated using uniform probability density function. The objective of the study is to determine the optimal policy for production system, which maximizes the total profit subject to some constraints under consideration. The results are discussed with a numerical example to illustrate the theory.
Details
  • 17
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2014 | Volume: 5 | Issue: 4 | Views: 2872 | Reviews: 0

 

® 2010-2026 GrowingScience.Com