Processing, Please wait...

  • Home
  • About Us
  • Search:
  • Advanced Search

Growing Science » Tags cloud » Adjustable rate

Journals

  • IJIEC (747)
  • MSL (2643)
  • DSL (668)
  • CCL (508)
  • USCM (1092)
  • ESM (413)
  • AC (562)
  • JPM (271)
  • IJDS (912)
  • JFS (91)
  • HE (32)
  • SCI (26)

Keywords

Supply chain management(166)
Jordan(161)
Vietnam(149)
Customer satisfaction(120)
Performance(113)
Supply chain(110)
Service quality(98)
Competitive advantage(95)
Tehran Stock Exchange(94)
SMEs(87)
optimization(86)
Financial performance(83)
Trust(83)
TOPSIS(83)
Sustainability(81)
Job satisfaction(80)
Factor analysis(78)
Social media(78)
Knowledge Management(77)
Artificial intelligence(77)


» Show all keywords

Authors

Naser Azad(82)
Mohammad Reza Iravani(64)
Zeplin Jiwa Husada Tarigan(63)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(39)
Jumadil Saputra(36)
Dmaithan Almajali(36)
Muhammad Turki Alshurideh(35)
Barween Al Kurdi(32)
Ahmad Makui(32)
Basrowi Basrowi(31)
Hassan Ghodrati(31)
Mohammad Khodaei Valahzaghard(30)
Sautma Ronni Basana(29)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)
Haitham M. Alzoubi(27)


» Show all authors

Countries

Iran(2183)
Indonesia(1290)
India(787)
Jordan(786)
Vietnam(504)
Saudi Arabia(453)
Malaysia(441)
United Arab Emirates(220)
China(206)
Thailand(153)
United States(111)
Turkey(106)
Ukraine(104)
Egypt(98)
Canada(92)
Peru(88)
Pakistan(85)
United Kingdom(80)
Morocco(79)
Nigeria(78)


» Show all countries
Sort articles by: Volume | Date | Most Rates | Most Views | Reviews | Alphabet
1.

Optimization of a hybrid multi-item fabricating-shipping integrated system considering scrap, adjustable-rate, and postponement Pages 89-104 Right click to download the paper Download PDF

Authors: Yuan-Shyi P. Chiu, Ya-Lei Lo, Fan-Yun Pai, Victoria Chiu, Singa Wang Chiu

DOI: 10.5267/j.ijiec.2023.11.002

Keywords: Fabricating-shipping system, Hybrid multi-item batch system, Adjustable rate, Postponement, Scrap, Multiple shipments, Subcontracting

Abstract:
This study aims to optimize a hybrid multi-item fabricating-shipping integrated system incorporating scrap, adjustable rate, and postponement. In present-day competitive market environments, there is a clear client demand trend for various goods, shorter lead time, and expected quality. To satisfy the client’s needs, the management of manufacturing firms requires an effective and efficient plan to fabricate various high-quality goods in an expedited period, under limited capacity, and with minimal operating expenses. Inspired by facilitating production management to determine the best fabricating scheme/plan to achieve their operational goals, this work proposes an exploratory postponement model with quality assurance and uptime reduction strategies for their decision-making. By employing a two-phase making scheme, the required standard components are first made in the 1st phase, and multiple finished merchandise is fabricated in the 2nd phase. The study suggests strategies of contracting out a part of the common parts’ batch and adopting an adjusted/expedited making rate in the 2nd phase to considerably reduce both phases’ production uptimes. During both fabricating processes, the screening tasks identify/remove scrapped/faulty goods to ensure each finished batch’s quality. Equal-amount multiple shipments of end merchandise are transported to the clients in fixed time-interval. Optimization methodology and mathematical analyses support us in deriving the model’s expected annual operating cost and deciding the optimal production-transportation policy. A numerical illustration helps verify our model’s applicability and reveals important managerial insights into the studied problem to facilitate management in decision-making.
Details
  • 34
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2024 | Volume: 15 | Issue: 1 | Views: 739 | Reviews: 0

 

® 2010-2026 GrowingScience.Com