Processing, Please wait...

  • Home
  • About Us
  • Search:
  • Advanced Search

Growing Science » Authors » Khadija Assafra

Journals

  • IJIEC (747)
  • MSL (2643)
  • DSL (668)
  • CCL (508)
  • USCM (1092)
  • ESM (413)
  • AC (562)
  • JPM (271)
  • IJDS (912)
  • JFS (91)
  • HE (32)
  • SCI (26)

Keywords

Supply chain management(166)
Jordan(161)
Vietnam(149)
Customer satisfaction(120)
Performance(113)
Supply chain(110)
Service quality(98)
Competitive advantage(95)
Tehran Stock Exchange(94)
SMEs(87)
optimization(86)
Financial performance(83)
Trust(83)
TOPSIS(83)
Sustainability(81)
Job satisfaction(80)
Factor analysis(78)
Social media(78)
Knowledge Management(77)
Artificial intelligence(77)


» Show all keywords

Authors

Naser Azad(82)
Mohammad Reza Iravani(64)
Zeplin Jiwa Husada Tarigan(63)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(39)
Jumadil Saputra(36)
Dmaithan Almajali(36)
Muhammad Turki Alshurideh(35)
Barween Al Kurdi(32)
Ahmad Makui(32)
Basrowi Basrowi(31)
Hassan Ghodrati(31)
Mohammad Khodaei Valahzaghard(30)
Sautma Ronni Basana(29)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)
Haitham M. Alzoubi(27)


» Show all authors

Countries

Iran(2183)
Indonesia(1290)
India(787)
Jordan(786)
Vietnam(504)
Saudi Arabia(453)
Malaysia(441)
United Arab Emirates(220)
China(206)
Thailand(153)
United States(111)
Turkey(106)
Ukraine(104)
Egypt(98)
Canada(92)
Peru(88)
Pakistan(85)
United Kingdom(80)
Morocco(79)
Nigeria(78)


» Show all countries
Sort articles by: Volume | Date | Most Rates | Most Views | Reviews | Alphabet
1.

Optimization of transport constraints and quality of service for joint resolution of uncertain scheduling and the job-shop problem with routing (JSSPR) as opposed to the job-shop problem with transport (JSSPT) Pages 109-130 Right click to download the paper Download PDF

Authors: Khadija Assafra, Bechir Alaya, Salah Zidi, Mounir Zrigui

DOI: 10.5267/j.jpm.2024.1.002

Keywords: Optimization, Scheduling, Job Shop, Transportation, QoS, Modeling, JSSPR

Abstract:
To better meet the qualitative and quantitative requirements of customers or relevant sector managers, workshop environments are implementing increasingly complex task management systems. The job shop scheduling problem (JSSP) involves assigning each task to a single machine while scheduling many tasks on different machines. Finding the best scheduling for machines is one of the challenging optimizations of difficult non-deterministic polynomial (NP) time problems. The fundamental goal of optimization is to shorten the makespan (total execution time of all tasks). This paper is interested in the joint resolution of scheduling and transport problems and more particularly the Job-shop problem with Routing (JSSPR) as opposed to the Job-shop problem with Transport (JSSPT). These two problems are modeled in the form of a disjunctive graph. For the JSSPT, the solution to the transport problem is not linked to any quality of service (QoS) criterion and the solution is therefore often semi-active. The Job-shop with Routing explicitly considers transport operations and uses algorithms from the transport community to solve the transport problem. It is shown that the routing part of the JSSPR is a problem of the vehicle routing family and of the Pickup and Delivery Problem family. QoS in the JSSPR is defined by the duration of tours, the duration of transport of parts and the waiting time for them. A new evaluation function – named Time-Lag Insertion Heuristic (TLH) – is proposed to evaluate a disjunctive graph by simultaneously minimizing the makespan and maximizing the quality of service. Thus, the solution obtained is not semi-active, but a compromise between the different criteria. This evaluation function is included in a metaheuristic. Our numerical evaluations demonstrate that, on the one hand, the TLH evaluation can find almost optimal solutions regarding the QoS criterion; and on the other hand, the TLH evaluation is not very sensitive to the order of insertion of the maximum time-lags during the different minimization steps.
Details
  • 17
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2024 | Volume: 9 | Issue: 2 | Views: 872 | Reviews: 0

 

® 2010-2026 GrowingScience.Com