Processing, Please wait...

  • Home
  • About Us
  • Search:
  • Advanced Search

Growing Science » Authors » Fayez F. Boctor

Journals

  • IJIEC (747)
  • MSL (2643)
  • DSL (668)
  • CCL (508)
  • USCM (1092)
  • ESM (413)
  • AC (562)
  • JPM (271)
  • IJDS (912)
  • JFS (91)
  • HE (32)
  • SCI (26)

Keywords

Supply chain management(166)
Jordan(161)
Vietnam(149)
Customer satisfaction(120)
Performance(113)
Supply chain(110)
Service quality(98)
Competitive advantage(95)
Tehran Stock Exchange(94)
SMEs(87)
optimization(86)
Financial performance(83)
Trust(83)
TOPSIS(83)
Sustainability(81)
Job satisfaction(80)
Factor analysis(78)
Social media(78)
Knowledge Management(77)
Artificial intelligence(77)


» Show all keywords

Authors

Naser Azad(82)
Mohammad Reza Iravani(64)
Zeplin Jiwa Husada Tarigan(63)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(39)
Jumadil Saputra(36)
Dmaithan Almajali(36)
Muhammad Turki Alshurideh(35)
Barween Al Kurdi(32)
Ahmad Makui(32)
Basrowi Basrowi(31)
Hassan Ghodrati(31)
Mohammad Khodaei Valahzaghard(30)
Sautma Ronni Basana(29)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)
Haitham M. Alzoubi(27)


» Show all authors

Countries

Iran(2183)
Indonesia(1290)
India(787)
Jordan(786)
Vietnam(504)
Saudi Arabia(453)
Malaysia(441)
United Arab Emirates(220)
China(206)
Thailand(153)
United States(111)
Turkey(106)
Ukraine(104)
Egypt(98)
Canada(92)
Peru(88)
Pakistan(85)
United Kingdom(80)
Morocco(79)
Nigeria(78)


» Show all countries
Sort articles by: Volume | Date | Most Rates | Most Views | Reviews | Alphabet
1.

Scheduling parallel extrusion lines Pages 1-16 Right click to download the paper Download PDF

Authors: Fayez F. Boctor, Dhiaeddine Zaatour, Jacques Renaud

DOI: 10.5267/j.jpm.2023.11.002

Keywords: Production planning, Neighborhood search heuristics, Sequencing and scheduling

Abstract:
This paper introduces the problem of scheduling jobs on parallel plastic extrusion lines where each line is composed of one or more than one extruder. Although there are some similarities between the introduced problem and the non-identical parallel machines scheduling problems with sequence-dependent setup times, limited additional resources and machine eligibility restrictions, the problem considered in this paper is a generalization of the parallel machine scheduling problem. This is because in parallel machines scheduling each job requires only one machine but in our case some jobs require more than one machine. Thus, our problem reduces to the parallel machine scheduling problem if all jobs require only one machine. This paper describes the problem of scheduling parallel extrusion lines, its industrial context, and develops a mixed-linear formulation to model the problem. This formulation allowed solving instances of up to 15 jobs. In addition, we developed four metaheuristics: a simulated annealing algorithm, a tabu search heuristic, a genetic algorithm, and a greedy randomized adaptive search procedure. These metaheuristics can be used to solve real-life instances of the problem. A numerical experiment shows that the proposed metaheuristics produce excellent solutions. Some of the proposed simulated annealing adaptations and of the tabu search heuristics obtained solutions with less than 2% deviation from the optimum.
Details
  • 51
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2024 | Volume: 9 | Issue: 1 | Views: 824 | Reviews: 0

 

® 2010-2026 GrowingScience.Com