Processing, Please wait...

  • Home
  • About Us
  • Search:
  • Advanced Search

Growing Science » Authors » Ehsan Haqiqat

Journals

  • IJIEC (726)
  • MSL (2637)
  • DSL (649)
  • CCL (495)
  • USCM (1092)
  • ESM (404)
  • AC (557)
  • JPM (247)
  • IJDS (912)
  • JFS (91)
  • HE (21)
  • SCI (21)

Keywords

Supply chain management(163)
Jordan(161)
Vietnam(148)
Customer satisfaction(120)
Performance(113)
Supply chain(108)
Service quality(98)
Tehran Stock Exchange(94)
Competitive advantage(93)
SMEs(86)
optimization(84)
Financial performance(83)
Trust(81)
TOPSIS(80)
Job satisfaction(79)
Sustainability(79)
Factor analysis(78)
Social media(78)
Knowledge Management(77)
Genetic Algorithm(76)


» Show all keywords

Authors

Naser Azad(82)
Mohammad Reza Iravani(64)
Zeplin Jiwa Husada Tarigan(60)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(39)
Jumadil Saputra(36)
Dmaithan Almajali(36)
Muhammad Turki Alshurideh(35)
Barween Al Kurdi(32)
Ahmad Makui(32)
Basrowi Basrowi(31)
Hassan Ghodrati(31)
Mohammad Khodaei Valahzaghard(30)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)
Sautma Ronni Basana(27)
Haitham M. Alzoubi(27)


» Show all authors

Countries

Iran(2171)
Indonesia(1277)
Jordan(784)
India(780)
Vietnam(500)
Saudi Arabia(438)
Malaysia(438)
United Arab Emirates(220)
China(181)
Thailand(151)
United States(110)
Turkey(103)
Ukraine(99)
Egypt(95)
Canada(92)
Pakistan(84)
Peru(83)
United Kingdom(79)
Nigeria(77)
Morocco(73)


» Show all countries
Sort articles by: Volume | Date | Most Rates | Most Views | Reviews | Alphabet
1.

Fuzzy inference system-Latin hypercube simulation: An integrated hybrid model for OHS risks management Pages 127-140 Right click to download the paper Download PDF

Authors: Ehsan Haqiqat, Yahia Zare Mehrjerdi, Ali Zare Bidaki

DOI: 10.5267/j.jpm.2018.11.001

Keywords: Occupational Health and Safety, Healthcare System, Construction Projects, Risk Evaluation, Risk management, sensitivity analysis, Integrated hybrid model

Abstract:
Risk management in construction industry in several cases is not only incomplete regarding the unification of Occupational Health and Safety (OHS) hazards, but it is also incomplete in not having a systematic and innovative method to assess the impacts of these risks on the objectives of a project. An integrated hybrid Fuzzy Inference System-Latin Hypercube Simulation for the evaluation of OHS risks in construction projects is presented in this paper. Prioritization of safety risks systematically without human interference with fuzzy inference system gives the appropriate response to the identified risks. An advanced Monte Carlo simulation is also used for the evaluation of quantitative objectives of a project. This approach allows us to get away from discrimination and simulate the risks with high impacts but with low probabilities. In order to measure the relationship between the occurrences of each of the risks impacts on project objectives, the sensitivity analysis based on Pearson correlation coefficient is used to determine the usefulness of the proposed integrated hybrid method.
Details
  • 68
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2019 | Volume: 4 | Issue: 2 | Views: 2670 | Reviews: 0

 

® 2010-2025 GrowingScience.Com