Processing, Please wait...

  • Home
  • About Us
  • Search:
  • Advanced Search

Growing Science » Authors » Chunhao Li

Journals

  • IJIEC (777)
  • MSL (2643)
  • DSL (690)
  • CCL (528)
  • USCM (1092)
  • ESM (421)
  • AC (562)
  • JPM (293)
  • IJDS (952)
  • JFS (101)
  • HE (32)
  • SCI (26)

Keywords

Supply chain management(168)
Jordan(165)
Vietnam(151)
Customer satisfaction(120)
Performance(115)
Supply chain(112)
Service quality(98)
Competitive advantage(97)
Tehran Stock Exchange(94)
SMEs(89)
optimization(87)
Sustainability(86)
Artificial intelligence(85)
Financial performance(84)
Trust(83)
TOPSIS(83)
Job satisfaction(81)
Genetic Algorithm(78)
Factor analysis(78)
Social media(78)


» Show all keywords

Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(66)
Mohammad Reza Iravani(64)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(40)
Dmaithan Almajali(37)
Jumadil Saputra(36)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Barween Al Kurdi(32)
Hassan Ghodrati(31)
Basrowi Basrowi(31)
Sautma Ronni Basana(31)
Mohammad Khodaei Valahzaghard(30)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Haitham M. Alzoubi(28)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)


» Show all authors

Countries

Iran(2192)
Indonesia(1311)
Jordan(813)
India(793)
Vietnam(510)
Saudi Arabia(478)
Malaysia(444)
China(231)
United Arab Emirates(226)
Thailand(160)
United States(114)
Ukraine(110)
Turkey(110)
Egypt(106)
Peru(94)
Canada(93)
Morocco(86)
Pakistan(85)
United Kingdom(80)
Nigeria(78)


» Show all countries
Sort articles by: Volume | Date | Most Rates | Most Views | Reviews | Alphabet
1.

Multi-mode multi-skill resource-constrained project scheduling problem with differentiated professional capabilities Pages 27-44 Right click to download the paper Download PDF

Authors: Chunhao Li, Feng Wang, Tsuiping Chung

DOI: 10.5267/j.jpm.2023.9.002

Keywords: Project scheduling, Resource constraints, Multiple modes, Multiple skill types, Differentiated professional capabilities, Artificial immune system algorithm

Abstract:
Motivated by a practical situation in a digital transformation project, this paper considers a resource-constrained project scheduling problem with multiple modes, multiple skill types, and differentiated professional capabilities. In the proposed problem, each project activity has one or more alternative execution modes associated with a trade-off between processing time and resource consumption. In an execution mode, an activity requires a certain number of employees with specific skill types and required professional capabilities. A mixed integer programming model is developed to minimize the total project duration. Since this problem is NP-hard, an efficient immunoglobulin-based artificial immune system (EIAIS) algorithm with a new encoding and decoding scheme and novel components is proposed. The effectiveness of the proposed EIAIS algorithm is tested on randomly generated instances. Computational results show that the proposed EIAIS algorithm has better performance than the existing algorithms.
Details
  • 51
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2024 | Volume: 9 | Issue: 1 | Views: 947 | Reviews: 0

 

® 2010-2026 GrowingScience.Com