Fariborz Jolai


Fariborz Jolai University of Tehran, Iran
Email: fjolai@ut.ac.ir


Fariborz Jolai

Rahbari, A., Nasiri, M.M., Werner, F., Musavi, M., Jolai, F. The vehicle routing and scheduling problem with cross-docking for perishable products under uncertainty: Two robust bi-objective models (2019) Applied Mathematical Modelling, 70, pp. 605-625.

Azadi Moghaddam Arani, A., Jolai, F., Nasiri, M.M. A multi-commodity network flow model for railway capacity optimization in case of line blockage (2019) International Journal of Rail Transportation, .

Zabihian, A., Tavakkoli-Moghaddam, R., Memari, P., Jolai, F. Location-pricing problem in the closed-loop supply chain network design under uncertainty (2019) Studies in Computational Intelligence, 803, pp. 360-371.

Boostani, A., Jolai, F., Bozorgi-Amiri, A. Optimal location selection of temporary accommodation sites in Iran via a hybrid fuzzy multiple-criteria decision making approach (2018) Journal of Urban Planning and Development, 144 (4), art. no. 04018039, .

Bodaghi, G., Jolai, F., Rabbani, M. Evaluating supply chain flexibility under demand uncertainty with smoothing approach and VMI considerations (2018) Journal of Industrial and Production Engineering, 35 (8), pp. 486-505.

Moradi, M., Jolai, F. Purchasing planning and order allocation in the pharmaceutical sustainable supply chain using the theoretical-graph (GT-MP- DM) (case study: Supplying the clotting factor for patients with hemophilia) (2018) International Journal of Supply and Operations Management, 5 (4), pp. 361-378.

Ebrahimi, M., Tavakkoli-Moghaddam, R., Jolai, F. Bi-objective build-to-order supply chain problem with customer utility (2018) International Journal of Engineering, Transactions A: Basics, 31 (7), pp. 1066-1073.

Bodaghi, G., Jolai, F., Rabbani, M. An integrated weighted fuzzy multi-objective model for supplier selection and order scheduling in a supply chain (2018) International Journal of Production Research, 56 (10), pp. 3590-3614.

Rezaei Somarin, A., Asian, S., Jolai, F., Chen, S. Flexibility in service parts supply chain: a study on emergency resupply in aviation MRO (2018) International Journal of Production Research, 56 (10), pp. 3547-3562.

Raziei, Z., Tavakkoli-Moghaddam, R., Rezaei-Malek, M., Bozorgi-Amiri, A., Jolai, F. Postdisaster relief distribution network design under disruption risk: A tour covering location-routing approach (2018) Integrating Disaster Science and Management: Global Case Studies in Mitigation and Recovery, pp. 393-406.

Gharaei, A., Jolai, F. A multi-agent approach to the integrated production scheduling and distribution problem in multi-factory supply chain (2018) Applied Soft Computing Journal, 65, pp. 577-589.

Afshar-Bakeshloo, M., Bozorgi-Amiri, A., Sajadi, S.M., Jolai, F. A multi-objective Environmental Hedging Point Policy with customer satisfaction criteria (2018) Journal of Cleaner Production, 179, pp. 478-494.

Heydarian, D., Jolai, F. Simulation optimization of operator allocation problem with learning effects and server breakdown under uncertainty (2018) Production and Manufacturing Research, 6 (1), pp. 396-415.

Koushan, M., Jolai, F., Wood, L.C. Hybrid differential evolution-data mining (HDEDM) algorithm for uncertain dynamic CMS problem (2018) Proceedings of International Conference on Computers and Industrial Engineering, CIE, 2018-December, 10 p.

Salehian, F., Razmi, J., Jolai, F. A hybrid ranking approach based on fuzzy analytical hierarchy process and data envelopment analysis: Road maintenance and transport organization of Iran (2018) Journal of Intelligent and Fuzzy Systems, 34 (4), pp. 2373-2383.

Noori-Daryan, M., Taleizadeh, A.A., Jolai, F. Analyzing pricing, promised delivery lead time, supplier-selection, and ordering decisions of a multi-national supply chain under uncertain environment (2018) International Journal of Production Economics, . Article in Press.

Yazdani, M., Jolai, F., Taleghani, M., Yazdani, R. A modified imperialist competitive algorithm for a two-agent single-machine scheduling under periodic maintenance consideration (2018) International Journal of Operational Research, 32 (2), pp. 127-155.

Nasiri, M.M., Yazdanparast, R., Jolai, F. A simulation optimisation approach for real-time scheduling in an open shop environment using a composite dispatching rule (2017) International Journal of Computer Integrated Manufacturing, 30 (12), pp. 1239-1252.

Haghi, M., Fatemi Ghomi, S.M.T., Jolai, F. Developing a robust multi-objective model for pre/post disaster times under uncertainty in demand and resource (2017) Journal of Cleaner Production, 154, pp. 188-202.

Gholami-Zanjani, S.M., Hakimifar, M., Nazemi, N., Jolai, F. Robust and Fuzzy Optimisation Models for a Flow shop Scheduling Problem with Sequence Dependent Setup Times: A real case study on a PCB assembly company (2017) International Journal of Computer Integrated Manufacturing, 30 (6), pp. 552-563.

Mardan, E., Sadegh Amalnick, M., Rabbani, M., Jolai, F. A robust optimization approach for an inventory problem with emergency ordering and product substitution in an uncertain environment: A case study in pharmaceutical industry (2017) Scientia Iranica, 24 (3), pp. 1533-1546.

Yazdani, M., Aleti, A., Khalili, S.M., Jolai, F. Optimizing the sum of maximum earliness and tardiness of the job shop scheduling problem (2017) Computers and Industrial Engineering, 107, pp. 12-24.

Zhalechian, M., Tavakkoli-Moghaddam, R., Rahimi, Y., Jolai, F. An interactive possibilistic programming approach for a multi-objective hub location problem: Economic and environmental design (2017) Applied Soft Computing Journal, 52, pp. 699-713.

Khalili, S.M., Jolai, F., Torabi, S.A. Integrated production–distribution planning in two-echelon systems: a resilience view (2017) International Journal of Production Research, 55 (4), pp. 1040-1064.

Akhavizadegan, F., Ansarifar, J., Jolai, F. A novel approach to determine a tactical and operational decision for dynamic appointment scheduling at nuclear medical center (2017) Computers and Operations Research, 78, pp. 267-277.

Kamali, A., Fatemi Ghomi, S.M.T., Jolai, F. Modeling and optimization of the multi-objective single-buyer multi-vendor integrated inventory problem with multiple quantity discounts (2017) Scientia Iranica, 24 (2), pp. 856-867.

Eskandari, N., Tavakkoli-Moghaddam, R., Memari, P., Jolai, F. A new mathematical model of a waste collection problem with social issues (2017) Proceedings of International Conference on Computers and Industrial Engineering, CIE, .

Yazdani, M., Khalili, S.M., Babagolzadeh, M., Jolai, F. A single-machine scheduling problem with multiple unavailability constraints: A mathematical model and an enhanced variable neighborhood search approach (2017) Journal of Computational Design and Engineering, 4 (1), pp. 46-59.

Aziziankohan, A., Jolai, F., Khalilzadeh, M., Soltani, R., Tavakkoli-Moghaddam, R. Green supply chain management using the queuing theory to handle congestion and reduce energy consumption and emissions from supply chain transportation fleet (2017) Journal of Industrial Engineering and Management, 10 (2Special Issue), pp. 213-236.

Yazdani, M., & Jolai, F. (2016). Lion optimization algorithm (LOA): a nature-inspired metaheuristic algorithm. Journal of computational design and engineering, 3(1), 24-36.

Haghi, M., Ghomi, S. M. T. F., & Jolai, F. (2017). Developing a robust multi-objective model for pre/post disaster times under uncertainty in demand and resource. Journal of Cleaner Production, 154, 188-202.

Akbari, K., Jolai, F., & Ghaderi, S. F. (2016). Optimal design of distributed energy system in a neighborhood under uncertainty. Energy, 116, 567-582.

Yazdani, M., Aleti, A., Khalili, S. M., & Jolai, F. (2017). Optimizing the sum of maximum earliness and tardiness of the job shop scheduling problem. Computers & Industrial Engineering, 107, 12-24.

Zhalechian, M., Tavakkoli-Moghaddam, R., Rahimi, Y., & Jolai, F. (2017). An interactive possibilistic programming approach for a multi-objective hub location problem: Economic and environmental design. Applied Soft Computing, 52, 699-713.

Bodaghi, G., Jolai, F., & Rabbani, M. (2017). An integrated weighted fuzzy multi-objective model for supplier selection and order scheduling in a supply chain. International Journal of Production Research, 1-25.

Rezaei Somarin, A., Asian, S., Jolai, F., & Chen, S. (2017). Flexibility in service parts supply chain: a study on emergency resupply in aviation MRO. International Journal of Production Research, 1-16.

Khalili, S. M., Jolai, F., & Torabi, S. A. (2017). Integrated production–distribution planning in two-echelon systems: a resilience view. International Journal of Production Research, 55(4), 1040-1064.

Jolai, F. (2005). Minimizing number of tardy jobs on a batch processing machine with incompatible job families. European Journal of Operational Research, 162(1), 184-190.

Jolai, F., Amalnick, M. S., Alinaghian, M., Shakhsi-Niaei, M., & Omrani, H. (2011). A hybrid memetic algorithm for maximizing the weighted number of just-in-time jobs on unrelated parallel machines. Journal of Intelligent Manufacturing, 22(2), 247-261.

Jolai, F., Asadzadeh, S. M., & Taghizadeh, M. R. (2010). A preemptive discrete-time priority buffer system with partial buffer sharing. Applied Mathematical Modelling, 34(8), 2148-2165.

Jolai, F., Asadzadeh, S. M., & Taghizadeh, M. R. (2008). Performance estimation of an email contact center by a finite source discrete time Geo/Geo/1 queue with disasters. Computers and Industrial Engineering, 55(3), 543-556.

Jolai, F., & Assadipour, G. (2010). A hybrid cellular genetic algorithm for multi-objective crew scheduling problem

Jolai, F., Foumani, M., Tavakoli-Moghadam, R., & Fattahi, P. (2012). Cyclic scheduling of a robotic flexible cell with load lock and swap. Journal of Intelligent Manufacturing, 23(5), 1885-1891.

Jolai, F., & Ghanbari, A. (2010). Integrating data transformation techniques with hopfield neural networks for solving travelling salesman problem. Expert Systems with Applications, 37(7), 5331-5335.

Jolai, F., Hosseini, S. M. M., & Hosseini, S. M. H. (2004). Flow shop scheduling problem with minimizing Earliness/Tardiness criteria. [Flow shop scheduling problem with minimizing Earliness/Tardiness criteria] Amirkabir (Journal of Science and Technology), 15(58 D), 452-461.

Jolai, F., Jahangoshai Rezaee, M., & Vazifeh, A. (2009). Multi-criteria decision making for assembly line balancing. Journal of Intelligent Manufacturing, 20(1), 113-121.

Jolai, F., Kor, H., Hatefi, S. M., & Iranmanesh, H. (2009). A genetic algorithm for makespan minimization in a no-wait flow shop problem with two batching machines. Paper presented at the Proceedings - 2009 International Conference on Computer Engineering and Technology, ICCET 2009, , 2 238-242.

Jolai, F., Nayeri, S. A., & Sadoughian, M. R. (2004). An economic production lot size model with deteriorating items and stock-dependent demand. [An economic production lot size model with deteriorating items and stock-dependent demand] Amirkabir (Journal of Science and Technology), 15(58 D), 469-477.

Jolai, F., & Rabani, M. (2004). Optimal scheduling on a batch processing machine with minimum number of tardy jobs criteria. [Optimal scheduling on a batch processing machine with minimum number of tardy jobs criteria] Amirkabir (Journal of Science and Technology), 15(58 D), 462-468.

Jolai, F., Rabbani, M., Amalnick, S., Dabaghi, A., Dehghan, M., & Parast, M. Y. (2007). Genetic algorithm for bi-criteria single machine scheduling problem of minimizing maximum earliness and number of tardy jobs. Applied Mathematics and Computation, 194(2), 552-560.

Jolai, F., Rabiee, M., & Asefi, H. (2012). A novel hybrid meta-heuristic algorithm for a no-wait flexible flow shop scheduling problem with sequence dependent setup times. International Journal of Production Research, 50(24), 7447-7466.

Jolai, F., Razmi, J., & Rostami, N. K. M. (2011). A fuzzy goal programming and meta heuristic algorithms for solving integrated production: Distribution planning problem. Central European Journal of Operations Research, 19(4), 547-569.

Jolai, F., Rezaee, M. J., Rabbani, M., Razmi, J., & Fattahi, P. (2007). Exact algorithm for bi-objective 0-1 knapsack problem. Applied Mathematics and Computation, 194(2), 544-551.

Jolai, F., Sheikh, S., Rabbani, M., & Karimi, B. (2009). A genetic algorithm for solving no-wait flexible flow lines with due window and job rejection. International Journal of Advanced Manufacturing Technology, 42(5-6), 523-532.

Jolai, F., Taghipour, M., & Javadi, B. (2011). A variable neighborhood binary particle swarm algorithm for cell layout problem. International Journal of Advanced Manufacturing Technology, 55(1-4), 327-339.

Jolai, F., Tavakkoli-Moghaddam, R., Golmohammadi, A., & Javadi, B. (2012). An electromagnetism-like algorithm for cell formation and layout problem. Expert Systems with Applications, 39(2), 2172-2182.

Jolai, F., Tavakkoli-Moghaddam, R., Rabbani, M., & Sadoughian, M. R. (2006). An economic production lot size model with deteriorating items, stock-dependent demand, inflation, and partial backlogging. Applied Mathematics and Computation, 181(1), 380-389.

Jolai, F., Tavakkoli-Moghaddam, R., & Taghipour, M. (2012). A multi-objective particle swarm optimisation algorithm for unequal sized dynamic facility layout problem with pickup/drop-off locations. International Journal of Production Research, 50(15), 4279-4293.

Jolai, F., Yazdian, S. A., Shahanaghi, K., & Azari Khojasteh, M. (2011). Integrating fuzzy TOPSIS and multi-period goal programming for purchasing multiple products from multiple suppliers. Journal of Purchasing and Supply Management, 17(1), 42-53.

Alizadeh, M., Jolai, F., Aminnayeri, M., & Rada, R. (2012). Comparison of different input selection algorithms in neuro-fuzzy modeling. Expert Systems with Applications, 39(1), 1536-1544.

Alizadeh, M., Lewis, M., Zarandi, M. H. F., & Jolai, F. (2011). Determining significant parameters in the design of ANFIS. Paper presented at the Annual Conference of the North American Fuzzy Information Processing Society - NAFIPS,

Alizadeh, M., Rada, R., Jolai, F., & Fotoohi, E. (2011). An adaptive neuro-fuzzy system for stock portfolio analysis. International Journal of Intelligent Systems, 26(2), 99-114.

Bagheri, M., Jolai, F., & Aryanezhad, M. B. (2012). Stability analysis in project resource levelling problem with stochastic activity durations. World Applied Sciences Journal, 16(1), 126-134.

Bank, M., Fatemi Ghomi, S. M. T., Jolai, F., & Behnamian, J. (2012). Application of particle swarm optimization and simulated annealing algorithms in flow shop scheduling problem under linear deterioration. Advances in Engineering Software, 47(1), 1-6.

Bank, M., Fatemi Ghomi, S. M. T., Jolai, F., & Behnamian, J. (2012). Two-machine flow shop total tardiness scheduling problem with deteriorating jobs. Applied Mathematical Modelling, 36(11), 5418-5426.

Behnamian, J., Fatemi Ghomi, S. M. T., Jolai, F., & Amirtaheri, O. (2012). Minimizing makespan on a three-machine flowshop batch scheduling problem with transportation using genetic algorithm. Applied Soft Computing Journal, 12(2), 768-777.

Behnamian, J., Fatemi Ghomi, S. M. T., Jolai, F., & Amirtaheri, O. (2012). Realistic two-stage flowshop batch scheduling problems with transportation capacity and times. Applied Mathematical Modelling, 36(2), 723-735.

Dupont, L., & Jolai Ghazvini, F. (1998). Minimizing makespan on a single batch processing machine with non-identical job sizes. Journal Europeen Des Systemes Automatises, 32(4), 431-440.

Ebadian, M., Rabbani, M., Jolai, F., Torabi, S. A., & Tavakkoli-Moghaddam, R. (2008). A new decision-making structure for the order entry stage in make-to-order environments. International Journal of Production Economics, 111(2), 351-367.

Ebadian, M., Rabbani, M., Torabi, S. A., & Jolai, F. (2009). Hierarchical production planning and scheduling in make-to-order environments: Reaching short and reliable delivery dates. International Journal of Production Research, 47(20), 5761-5789.

Fatemi Ghomi, S. M. T., Jolai, F., & Mohammadi, M. (2003). A two-echelon repairable inventory system with two kinds of defectives, one kine repaired at the centeral depot and the other one repaired at stocking centers. Amirkabir (Journal of Science and Technology), 13(54 D), 114-123.

Fattahi, P., Hosseini, S. M. H., & Jolai, F. (2012). A mathematical model and extension algorithm for assembly flexible flow shop scheduling problem. International Journal of Advanced Manufacturing Technology, , 1-16.

Fattahi, P., Jolai, F., & Arkat, J. (2009). Flexible job shop scheduling with overlapping in operations. Applied Mathematical Modelling, 33(7), 3076-3087.

Fattahi, P., Saidi Mehrabad, M., & Jolai, F. (2007). Mathematical modeling and heuristic approaches to flexible job shop scheduling problems. Journal of Intelligent Manufacturing, 18(3), 331-342.

Fattahi, P., Tavakoli, N. B., Jalilvand-Nejad, A., & Jolai, F. (2010). A hybrid algorithm to solve the problem of re-entrant manufacturing system scheduling. CIRP Journal of Manufacturing Science and Technology, 3(4), 268-278.

Hamta, N., Fatemi Ghomi, S. M. T., Jolai, F., & Akbarpour Shirazi, M. (2013). A hybrid PSO algorithm for a multi-objective assembly line balancing problem with flexible operation times, sequence-dependent setup times and learning effect. International Journal of Production Economics, 141(1), 99-111.

Hamta, N., Fatemi Ghomi, S. M. T., Jolai, F., & Bahalke, U. (2011). Bi-criteria assembly line balancing by considering flexible operation times. Applied Mathematical Modelling, 35(12), 5592-5608.

Hatefi, S. M., & Jolai, F. (2010). A new model for classifying inputs and outputs and evaluating the performance of DMUs based on translog output distance function. Applied Mathematical Modelling, 34(6), 1439-1449.

Hatefi, S. M., Jolai, F., Iranmanesh, H., & Kor, H. (2009). A new DEA model for classification intermediate measures and evaluating supply chain and its members. Paper presented at the Proceedings - 2009 International Conference on Computer Engineering and Technology, ICCET 2009, , 1 457-461.

Hatefi, S. M., Jolai, F., & Kor, H. (2009). A new model for classifying inputs and outputs and evaluating the DMUs efficiency in DEA based on cobb-douglas production function. Paper presented at the Proceedings - 2009 International Conference on Computer Engineering and Technology, ICCET 2009, , 1 390-394.

Husseinzadeh Kashan, A., Karimi, B., & Jolai, F. (2010). An effective hybrid multi-objective genetic algorithm for bi-criteria scheduling on a single batch processing machine with non-identical job sizes. Engineering Applications of Artificial Intelligence, 23(6), 911-922.

Jalalvand, F., Teimoury, E., Makui, A., Aryanezhad, M. B., & Jolai, F. (2011). A method to compare supply chains of an industry. Supply Chain Management, 16(2), 82-97.

Javadi, B., Saidi-Mehrabad, M., Haji, A., Mahdavi, I., Jolai, F., & Mahdavi-Amiri, N. (2008). No-wait flow shop scheduling using fuzzy multi-objective linear programming. Journal of the Franklin Institute, 345(5), 452-467.

Jolai Ghazvini, F., & Dupont, L. (1998). Minimizing mean flow times criteria on a single batch processing machine with non-identical jobs sizes. International Journal of Production Economics, 55(3), 273-280.

Kamali, A., Fatemi Ghomi, S. M. T., & Jolai, F. (2011). A multi-objective quantity discount and joint optimization model for coordination of a single-buyer multi-vendor supply chain. Computers and Mathematics with Applications, 62(8), 3251-3269.

Kashan, A. H., Karimi, B., & Jolai, F. (2006). Bi-criteria scheduling on a batching machine with non-identical job sizes. Paper presented at the IFAC Proceedings Volumes (IFAC-PapersOnline), , 12(PART 1)

Kashan, A. H., Karimi, B., & Jolai, F. (2006). Minimizing makespan on a single batch processing machine with non-identical job sizes: A hybrid genetic approach

Khodadadi, S. B., & Jolai, F. (2012). A fuzzy based threshold policy for a single server retrial queue with vacations. Central European Journal of Operations Research, 20(2), 281-297.

Layegh, J., & Jolai, F. (2010). A memetic algorithm for minimizing the total weighted completion time on a single machine under linear deterioration. Applied Mathematical Modelling, 34(10), 2910-2925.

Layegh, J., Jolai, F., & Amalnik, M. S. (2009). A memetic algorithm for minimizing the total weighted completion time on a single machine under step-deterioration. Advances in Engineering Software, 40(10), 1074-1077.

Manavizadeh, N., Hasani Goodarzi, A., Rabbani, M., & Jolai, F. (2013). Order acceptance/rejection policies in determining the sequence in mixed model assembly lines. Applied Mathematical Modelling, 37(4), 2531-2551.

Manavizadeh, N., Rabbani, M., Moshtaghi, D., & Jolai, F. (2012). Mixed-model assembly line balancing in the make-to-order and stochastic environment using multi-objective evolutionary algorithms. Expert Systems with Applications, 39(15), 12026-12031.

Manavizadeh, N., Tavakoli, L., Rabbani, M., & Jolai, F. (2012). A multi-objective mixed-model assembly line sequencing problem in order to minimize total costs in a make-to-order environment, considering order priority. Journal of Manufacturing Systems,

Mirabi, M., Fatemi Ghomi, S. M. T., & Jolai, F. (2010). A hybrid electromagnetism-like algorithm for supplier selection in make-to-order planning. Scientia Iranica, 17(1 E), 1-11.

Mirabi, M., Fatemi Ghomi, S. M. T., & Jolai, F. (2010). Efficient stochastic hybrid heuristics for the multi-depot vehicle routing problem. Robotics and Computer-Integrated Manufacturing, 26(6), 564-569.

Mirabi, M., Fatemi Ghomi, S. M. T., Jolai, F., & Zandieh, M. (2008). Hybrid electromagnetism-like algorithm for the flowshop scheduling with sequence-dependent setup times. Journal of Applied Sciences, 8(20), 3621-3629.

Mirabi, M., Ghomi, S. M. T. F., & Jolai, F. (2011). A two-stage hybrid flowshop scheduling problem in machine breakdown condition. Journal of Intelligent Manufacturing, , 1-7.

Mirsanei, H. S., Karimi, B., & Jolai, F. (2009). Flow shop scheduling with two batch processing machines and nonidentical job sizes. International Journal of Advanced Manufacturing Technology, 45(5-6), 553-572.

Mohammadi, M., Jolai, F., & Rostami, H. (2011). An M/M/c queue model for hub covering location problem. Mathematical and Computer Modelling, 54(11-12), 2623-2638.

Mokhlesian, M., Ghomi, S. M. T. F., & Jolai, F. (2010). Economic lot scheduling problem with consideration of money time value. International Journal of Industrial Engineering Computations, 1(2), 121-138.

Mousavi, S. M., Tavakkoli-Moghaddam, R., & Jolai, F. (2012). A possibilistic programming approach for the location problem of multiple cross-docks and vehicle routing scheduling under uncertainty. Engineering Optimization,

Mozafari, M., Tafazzoli, S., & Jolai, F. (2011). A new IPSO-SA approach for cardinality constrained portfolio optimization. International Journal of Industrial Engineering Computations, 2(2), 249-262.

Naderi, B., Ahmadi Javid, A., & Jolai, F. (2010). Permutation flowshops with transportation times: Mathematical models and solution methods. International Journal of Advanced Manufacturing Technology, 46(5-8), 631-647.

Neghab, A. P., Siadat, A., Tavakkoli-Moghaddam, R., & Jolai, F. (2011). An integrated approach for risk-assessment analysis in a manufacturing process using FMEA and des. Paper presented at the 2011 IEEE International Conference on Quality and Reliability, ICQR 2011, 366-370.

Pazoki, M., Fatemi Ghomi, S. M. T., & Jolai, F. (2011). A new approach in supply chain modeling. Paper presented at the IEEE International Conference on Industrial Engineering and Engineering Management, 955-958.

Pishvaee, M. S., Fathi, M., & Jolai, F. (2008). A fuzzy clustering-based method for scenario analysis in strategic planning: The case of an asian pharmaceutical company. South African Journal of Business Management, 39(3), 21-31.

Pishvaee, M. S., Jolai, F., & Razmi, J. (2009). A stochastic optimization model for integrated forward/reverse logistics network design. Journal of Manufacturing Systems, 28(4), 107-114.

Rabbani, M., Fatemi Ghomi, S. M. T., Jolai, F., & Lahiji, N. S. (2007). A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept. European Journal of Operational Research, 176(2), 794-808.

Rabbani, M., Jolai, F., Manavizadeh, N., Radmehr, F., & Javadi, B. (2012). Solving a bi-objective cell formation problem with stochastic production quantities by a two-phase fuzzy linear programming approach. International Journal of Advanced Manufacturing Technology, 58(5-8), 709-722.

Rabbani, M., Moghaddam, R. T., Jolai, F., & Ghorbani, H. R. (2006). A comprehensive model for R and D project portfolio selection with zero-one linear goal-programming. International Journal of Engineering, Transactions A: Basics, 19(1), 55-66.

Rahimi-Vahed, A. R., Rabbani, M., Tavakkoli-Moghaddam, R., Torabi, S. A., & Jolai, F. (2007). A multi-objective scatter search for a mixed-model assembly line sequencing problem. Advanced Engineering Informatics, 21(1), 85-99.

Razmi, J., Jolai, F., & Hezarkhani, B. (2008). Designing collaborative roles and responsibilities in supply chain. International Journal of Management Practice, 3(1), 96-114.

Rezaeian, J., Javadian, N., Tavakkoli-Moghaddam, R., & Jolai, F. (2011). A hybrid approach based on the genetic algorithm and neural network to design an incremental cellular manufacturing system. Applied Soft Computing Journal, 11(6), 4195-4202.

Roshanaei, V., Naderi, B., Jolai, F., & Khalili, M. (2009). A variable neighborhood search for job shop scheduling with set-up times to minimize makespan. Future Generation Computer Systems, 25(6), 654-661.

Sabouni, M. T. Y., Jolai, F., & Mansouri, A. (2010). Heuristics for minimizing total completion time and maximum lateness on identical parallel machines with setup times. Journal of Intelligent Manufacturing, 21(4), 439-449.

Safaei, A. S., Moattar Husseini, S. M., Z.-Farahani, R., Jolai, F., & Ghodsypour, S. H. (2010). Integrated multi-site production-distribution planning in supply chain by hybrid modelling. International Journal of Production Research, 48(14), 4043-4069.

Seraj, O., Tavakkoli-Moghaddam, R., & Jolai, F. (2009). A fuzzy multi-objective tabu-search method for a new bi-objective open shopscheduling problem. Paper presented at the 2009 International Conference on Computers and Industrial Engineering, CIE 2009, 164-169.

Soltani, R., Jolai, F., & Zandieh, M. (2010). Two robust meta-heuristics for scheduling multiple job classes on a single machine with multiple criteria. Expert Systems with Applications, 37(8), 5951-5959.

Taheri-Tolgari, J., Mirzazadeh, A., & Jolai, F. (2012). An inventory model for imperfect items under inflationary conditions with considering inspection errors. Computers and Mathematics with Applications, 63(6), 1007-1019.

Tavakkoli-Moghaddam, R., Javadi, B., Jolai, F., & Ghodratnama, A. (2010). The use of a fuzzy multi-objective linear programming for solving a multi-objective single-machine scheduling problem. Applied Soft Computing Journal, 10(3), 919-925.

Tavakkoli-Moghaddam, R., Jolai, F., Khodadadeghan, Y., & Haghnevis, M. (2006). A mathematical model of a multi-criteria parallel machine scheduling problem: A genetic algorithm. International Journal of Engineering, Transactions A: Basics, 19(1), 79-86.

Tavakkoli-Moghaddam, R., Jolai, F., Vaziri, F., Ahmed, P. K., & Azaron, A. (2005). A hybrid method for solving stochastic job shop scheduling problems. Applied Mathematics and Computation, 170(1), 185-206.

Tavakoli-Moghadam, R., Javadi, B., Jolai, F., & Mirgorbani, S. M. (2006). An efficient algorithm to inter and intra-cell layout problems in cellular manufacturing systems with stochastic demands. International Journal of Engineering, Transactions A: Basics, 19(1), 67-78.

Torabi, S. A., Jenabi, M., Fatemi Ghomi, S. M. T., Jolai, F., & Tavakkoli-Moghaddam, R. (2006). Finite horizon ELSP in flexible flow lines with unrelated parallel machines. Paper presented at the IFAC Proceedings Volumes (IFAC-PapersOnline), , 12(PART 1)

Vahdani, B., Jolai, F., Tavakkoli-Moghaddam, R., & Mousavi, S. M. (2012). Two fuzzy possibilistic bi-objective zero-one programming models for outsourcing the equipment maintenance problem. Engineering Optimization, 44(7), 801-820.

Vahdani, B., Tavakkoli-Moghaddam, R., & Jolai, F. (2012). Reliable design of a logistics network under uncertainty: A fuzzy possibilistic-queuing model. Applied Mathematical Modelling,

Yazdani Sabouni, M. T., & Jolai, F. (2010). Optimal methods for batch processing problem with makespan and maximum lateness objectives. Applied Mathematical Modelling, 34(2), 314-324.