Editor


Emad Roghanian, Department of Industrial Engineering
K.N. Toosi University of Technology, Tehran, Iran,
ORCID: 0000-0001-7969-3783
Tel: +989183611830
Email: e_roghanian@kntu.ac.ir

Publications

Farokhi, S., Roghanian, E. Determining quantitative targets for performance measures in the balanced scorecard method using response surface methodology (2018) Management Decision, 56 (9), pp. 2006-2037.

Roghanian, E., Alipour, M., Rezaei, M. An improved fuzzy critical chain approach in order to face uncertainty in project scheduling (2018) International Journal of Construction Management, 18 (1), pp. 1-13.

Roghanian, E., Ghorbani, B., Alipour, M. Application of intuitionistic fuzzy numbers in SWOT analysis (2018) International Journal of Industrial and Systems Engineering, 28 (2), pp. 152-165.

Sadeghi, M., Roghanian, E. Reliability optimization for non-repairable series-parallel systems with a choice of redundancy strategies: Erlang time-to-failure distribution (2017) Proceedings of the Institution of Mechanical Engineers, Part O: Journal of Risk and Reliability, 231 (5), pp. 587-604.

Roghanian, E., Kebria, Z.S. The combination of TOPSIS method and Dijkstra's algorithm in multi-attribute routing (2017) Scientia Iranica, 24 (5), pp. 2540-2549.

Sadeghi, M., Roghanian, E. Reliability analysis of a warm standby repairable system with two cases of imperfect switching mechanism (2017) Scientia Iranica, 24 (2), pp. 808-822.

Roghanian, E., Moradinasab, N., Afruzi, E. N., & Soofifard, R. (2015). Project risk management using fuzzy failure mode and effect analysis and fuzzy logic. International Journal of Services and Operations Management, 20(2), 207-227.

Eskafi, S., Roghanian, E., & Jafari-Eskandari, M. (2015). Designing a performance measurement system for supply chain using balanced scorecard, path analysis, cooperative game theory and evolutionary game theory: A Case Study. International Journal of Industrial Engineering Computations, 6(2), 157-172.

Afruzi, E. N., Najafi, A. A., Roghanian, E., & Mazinani, M. (2014). A Multi-Objective Imperialist Competitive Algorithm for solving discrete time, cost and quality trade-off problems with mode-identity and resource-constrained situations. Computers & Operations Research, 50, 80-96.

Isfahani, S. N., Haddad, A. A., Roghanian, E., & Rezayi, M. (2014). Customer relationship management performance measurement using balanced scorecard and fuzzy analytic network process: The case of MAPNA group. Journal of Intelligent & Fuzzy Systems, 27(1).

Roghanian, E., & Pazhoheshfar, P. (2014). An optimization model for reverse logistics network under stochastic environment by using genetic algorithm. Journal of Manufacturing Systems, 33(3), 348-356.

Roghanian, E., Sheykhan, A., & Abendankashi, E. (2014). An application of fuzzy TOPSIS to improve the process of supply chain management in the food industries: A case study of protein products manufacturing company. Decision Science Letters, 3(1), 17-26.

Roghanian, E., Sadjadi, S. J., & Aryanezhad, M. B. (2007). A probabilistic bi-level linear multi-objective programming problem to supply chain planning. Applied Mathematics and computation, 188(1), 786-800.

Roghanian, E., Rahimi, J., & Ansari, A. (2010). Comparison of first aggregation and last aggregation in fuzzy group TOPSIS. Applied Mathematical Modelling, 34(12), 3754-3766.

Roghanian, E., Aryanezhad, M. B., & Sadjadi, S. J. (2008). Integrating goal programming, Kuhn–Tucker conditions, and penalty function approaches to solve linear bi-level programming problems. Applied Mathematics and Computation, 195(2), 585-590.

Noorossana, R., Amiri, A., Vaghefi, S. A., & Roghanian, E. (2004). Monitoring quality characteristics using linear profile. In Proceedings of the 3rd International Industrial Engineering Conference (pp. 246-255).

Roghanian, E., & Foroughi, A. (2010). An empirical study of Iranian regional airports using robust data envelopment analysis. International Journal of Industrial Engineering Computations, 1(1), 65-72.

Aghassi, H., Abadi, S. N., & Roghanian, E. (2012). A Multi-objective Genetic Algorithm for Optimization Time-Cost Trade-off Scheduling. In Knowledge Technology (pp. 356-359). Springer Berlin Heidelberg.

Roghanian, E., & Kamandanipour, K. (2012). A fuzzy-random programming for integrated closed-loop logistics network design by using priority-based genetic algorithm. International Journal of industrial engineering computations, 4(1).

Farahani, R., Roghanian, E., & Tavakoli, M. (2012). Application of Data-Mining and FMEA Techniques in Maintenance System to Improve Equipment Performance.

Nabipoor Afruzi, E., Roghanian, E., Najafi, A. A., & Mazinani, M. (2013). A multi-mode resource-constrained discrete time–cost tradeoff problem solving using an adjusted fuzzy dominance genetic algorithm. Scientia Iranica.

Abedzadeh, M., Mazinani, M., Moradinasab, N., & Roghanian, E. (2013). Parallel variable neighborhood search for solving fuzzy multi-objective dynamic facility layout problem. The International Journal of Advanced Manufacturing Technology, 1-15.

Badiee, F., & Roghanian, E. (2012). Introducing Analytic Hierarchy Process model using Intuitionist Fuzzy Number. Texas Journal of Science, 23(2).