Reza Ramezanian, Editor


Reza Ramezanian, Department of Industrial Engineering,
K.N. Toosi University of Technology, Iran,
ORCID: 0000-0001-7013-7713
Email: ramezanian@iust.ac.ir
Tel: (+98) 9125397764

Publications

Ramezanian, R. Estimation of the profiles in posteriori ELECTRE TRI: A mathematical programming model (2019) Computers and Industrial Engineering, 128, pp. 47-59.

Ramezanian, R., Vali-Siar, M.M., Jalalian, M. Green permutation flowshop scheduling problem with sequence-dependent setup times: a case study (2019) International Journal of Production Research, .

Jalalian, M., Gholami, S., Ramezanian, R. Analyzing the trade-off between CO2 emissions and passenger service level in the airline industry: Mathematical modeling and constructive heuristic (2019) Journal of Cleaner Production, 206, pp. 251-266.

Vali-Siar, M.M., Gholami, S., Ramezanian, R. Multi-period and multi-resource operating room scheduling under uncertainty: A case study (2018) Computers and Industrial Engineering, 126, pp. 549-568.

Salamati-Hormozi, H., Zhang, Z.-H., Zarei, O., Ramezanian, R. Trade-off between the costs and the fairness for a collaborative production planning problem in make-to-order manufacturing (2018) Computers and Industrial Engineering, 126, pp. 421-434.

Saghaeeian, A., Ramezanian, R. An efficient hybrid genetic algorithm for multi-product competitive supply chain network design with price-dependent demand (2018) Applied Soft Computing Journal, 71, pp. 872-893.

Mohammadi, S., Cheraghalikhani, A., Ramezanian, R. A joint scheduling of production and distribution operations in a flow shop manufacturing system (2018) Scientia Iranica, 25 (2E), pp. 911-930.

Ramezanian, R., Sanami, S.F., Mahmoodian, V. A new mathematical model for integrated production planning and scheduling problem in capacitated exible ow shop with sequence-dependent setups (2017) Scientia Iranica, 24 (5), pp. 2501-2514.

Ramezanian, R., Behboodi, Z. Blood supply chain network design under uncertainties in supply and demand considering social aspects (2017) Transportation Research Part E: Logistics and Transportation Review, 104, pp. 69-82.

Ramezanian, R., Mohammadi, S., Cheraghalikhani, A. Toward an integrated modeling approach for production and delivery operations in flow shop system: Trade-off between direct and routing delivery methods (2017) Journal of Manufacturing Systems, 44, pp. 79-92.

Ramezanian, R., Fallah Sanami, S., Shafiei Nikabadi, M. A simultaneous planning of production and scheduling operations in flexible flow shops: case study of tile industry (2017) International Journal of Advanced Manufacturing Technology, 88 (9-12), pp. 2389-2403.

Ramezanian, R., Rahmani, D. MILP formulation and genetic algorithm for flow shop scheduling problem with missing operations (2017) International Journal of Operational Research, 30 (3), pp. 321-339.

Mahmoodjanloo, M., Parvasi, S.P., Ramezanian, R. A tri-level covering fortification model for facility protection against disturbance in r-interdiction median problem (2016) Computers and Industrial Engineering, 102, pp. 219-232.

Sadjadi, S.J., Ashtiani, M.G., Ramezanian, R., Makui, A. A firefly algorithm for solving competitive location-design problem: a case study (2016) Journal of Industrial Engineering International, 12 (4), pp. 517-527.

Rahmani, D., Ramezanian, R. A stable reactive approach in dynamic flexible flow shop scheduling with unexpected disruptions: A case study (2016) Computers and Industrial Engineering, 98, pp. 360-372.

Ramezanian, R., Ezzatpanah, A. Modeling and solving multi-objective mixed-model assembly line balancing and worker assignment problem (2015) Computers and Industrial Engineering, 87, pp. 74-80.

Rahmani, D., Yousefli, A., Ramezanian, R. A new robust fuzzy approach for aggregate production planning (2014) Scientia Iranica, 21 (6), pp. 2307-2314.

Rahmani, D., Ramezanian, R., Saidi-Mehrabad, M. Multi-objective flow shop scheduling problem with stochastic parameters: Fuzzy goal programming approach (2014) International Journal of Operational Research, 21 (3), pp. 322-340.

Vahedi-Nouri, B., Fattahi, P., Tavakkoli-Moghaddam, R., Ramezanian, R. A general flow shop scheduling problem with consideration of position-based learning effect and multiple availability constraints (2014) International Journal of Advanced Manufacturing Technology, 73 (5-8), pp. 601-611.

Rahmani, D., Ramezanian, R., Fattahi, P., Heydari, M. A robust optimization model for multi-product two-stage capacitated production planning under uncertainty (2013) Applied Mathematical Modelling, 37 (20-21), pp. 8957-8971.

Vahedi Nouri, B., Fattahi, P., Ramezanian, R. Hybrid firefly-simulated annealing algorithm for the flow shop problem with learning effects and flexible maintenance activities (2013) International Journal of Production Research, 51 (12), pp. 3501-3515.

Ramezanian, R., Saidi-Mehrabad, M. Hybrid simulated annealing and MIP-based heuristics for stochastic lot-sizing and scheduling problem in capacitated multi-stage production system (2013) Applied Mathematical Modelling, 37 (7), pp. 5134-5147.

Ramezanian, R., Saidi-Mehrabad, M., Teimoury, E. A mathematical model for integrating lot-sizing and scheduling problem in capacitated flow shop environments (2013) International Journal of Advanced Manufacturing Technology, 66 (1-4), pp. 347-361.

Ramezanian, R., Saidi-Mehrabad, M., Fattahi, P. MIP formulation and heuristics for multi-stage capacitated lot-sizing and scheduling problem with availability constraints (2013) Journal of Manufacturing Systems, 32 (2), pp. 392-401.

Vahedi-Nouri, B., Fattahi, P., Ramezanian, R. Minimizing total flow time for the non-permutation flow shop scheduling problem with learning effects and availability constraints (2013) Journal of Manufacturing Systems, 32 (1), p. 167.

Ramezanian, R., Saidi-Mehrabad, M., Fattahi, P. Integrated lot-sizing and scheduling with overlapping for multi-level capacitated production system (2013) International Journal of Computer Integrated Manufacturing, 26 (7), pp. 681-695.

Ashtiani, M.G., Makui, A., Ramezanian, R. A robust model for a leader-follower competitive facility location problem in a discrete space (2013) Applied Mathematical Modelling, 37 (1-2), pp. 62-71.

Ramezanian, R., Saidi-Mehrabad, M. Multi-product unrelated parallel machines scheduling problem with rework processes (2012) Scientia Iranica, 19 (6), pp. 1887-1893.

Ramezanian, R., Saidi-Mehrabad, M. Capacitated production planning problem considering the detailed scheduling constraints in a flow shop environment (2012) International Journal of Management Science and Engineering Management, 7 (4), pp. 293-302.

Ramezanian, R., Rahmani, D., Barzinpour, F. An aggregate production planning model for two phase production systems: Solving with genetic algorithm and tabu search (2012) Expert Systems with Applications, 39 (1), pp. 1256-1263.

Sayadi, M.K., Ramezanian, R., Ghaffari-Nasab, N. A discrete firefly meta-heuristic with local search for makespan minimization in permutation flow shop scheduling problems (2010) International Journal of Industrial Engineering Computations, 1 (1), pp. 1-10.

Ramezanian, R., Karamouzian, A. Comments on "Scheduling jobs on a k-stage flexible flow-shop" [Annals of Operations Research (2008) 164: 29-40] (2009) Annals of Operations Research, 172 (1), pp. 459-462.