Editorial member


Mehdi Karimi-Nasab Hamburg Business School, Germany
ORCID: 0000-0002-8739-430X
Email: Mehdi.Karimi-Nasab@uni-hamburg.de

Publications

Sabri-Laghaie, K., Karimi-Nasab, M. Random search algorithms for redundancy allocation problem of a queuing system with maintenance considerations (2019) Reliability Engineering and System Safety, 185, pp. 144-162.

Shishebori, D., Karimi-Nasab, M., Snyder, L.V. A two-phase heuristic algorithm for designing reliable capacitated logistics networks under disruptions (2017) European Journal of Industrial Engineering, 11 (4), pp. 425-468.

Dowlatshahi, S., Karimi-Nasab, M., Bahrololum, H. A group decision-making approach for supplier selection in configuration design: A case study (2015) International Journal of Advanced Manufacturing Technology, 81 (5-8), pp. 1139-1154.

Karimi-Nasab, M., Modarres, M. Lot sizing and job shop scheduling with compressible process times: A cut and branch approach (2015) Computers and Industrial Engineering, 85, pp. 196-205.

Karimi-Nasab, M., Wee, H.M. An inventory model with truncated exponential replenishment intervals and special sale offer (2015) Journal of Manufacturing Systems, 35, pp. 246-250.

Kheirandish, O., Tavakkoli-Moghaddam, R., Karimi-Nasab, M. An artificial bee colony algorithm for a two-stage hybrid flowshop scheduling problem with multilevel product structures and requirement operations (2015) International Journal of Computer Integrated Manufacturing, 28 (5), pp. 437-450.

Karimi-Nasab, M., Modarres, M., Seyedhoseini, S.M. A self-adaptive PSO for joint lot sizing and job shop scheduling with compressible process times (2015) Applied Soft Computing Journal, 27, pp. 137-147.

Karimi-Nasab, M., Sabri-Laghaie, K. Developing approximate algorithms for EPQ problem with process compressibility and random error in production/inspection (2014) International Journal of Production Research, 52 (8), pp. 2388-2421.

Karimi-Nasab, M., Seyedhoseini, S.M. Multi-level lot sizing and job shop scheduling with compressible process times: A cutting plane approach (2013) European Journal of Operational Research, 231 (3), pp. 598-616.

Karimi-Nasab, M., Seyedhoseini, S.M., Modarres, M., Heidari, M. Multi-period lot sizing and job shop scheduling with compressible process times for multilevel product structures (2013) International Journal of Production Research, 51 (20), pp. 6229-6246.

Karimi-Nasab, M., Konstantaras, I. An inventory control model with stochastic review interval and special sale offer (2013) European Journal of Operational Research, 227 (1), pp. 81-87.

Karimi-Nasab, M., Dowlatshahi, S., Heidari, H. A multiobjective distribution-pricing model for multiperiod price-sensitive demands (2013) IEEE Transactions on Engineering Management, 60 (3), art. no. 6407996, pp. 640-654.

Karimi-Nasab, M., Shishebori, D., Jalali-Naini, S.G.R. Multi-objective optimisation for pricing and distribution in a supply chain with stochastic demands (2013) International Journal of Industrial and Systems Engineering, 13 (1), pp. 56-72.

Karimi-Nasab, M., Ghomi, S.M.T.F. Multi-objective production scheduling with controllable processing times and sequence-dependent setups for deteriorating items (2012) International Journal of Production Research, 50 (24), pp. 7378-7400.

Noorollahi, E., Karimi-Nasab, M., Aryanezhad, M.B. An economic production quantity model with random yield subject to process compressibility (2012) Mathematical and Computer Modelling, 56 (3-4), pp. 80-96.

Karimi-Nasab, M., Bahalke, U., Feili, H.R., Sheikhzadeh, A., Dolatkhahi, K. Working time evaluation in assembly lines (2012) International Journal of Mathematics in Operational Research, 4 (1), pp. 1-17.

Karimi-Nasab, M., Konstantaras, I. A random search heuristic for a multi-objective production planning (2012) Computers and Industrial Engineering, 62 (2), pp. 479-490.

Karimi-Nasab, M., Aryanezhad, M.B. A multi-objective production smoothing model with compressible operating times (2011) Applied Mathematical Modelling, 35 (7), pp. 3596-3610.

Karimi-Nasab, M., Shah-Hoseini, B. A new approach for project resource scheduling with activity compressibility (2010) 40th International Conference on Computers and Industrial Engineering: Soft Computing Techniques for Advanced Manufacturing and Service Systems, CIE40 2010, art. no. 5668222, .

Barzinpour, F., Aryanezhad, M.B., Karimi-Nasab, M. A new lot sizing model for controllable processing times and inventory deterioration (2010) 40th International Conference on Computers and Industrial Engineering: Soft Computing Techniques for Advanced Manufacturing and Service Systems, CIE40 2010, art. no. 5668223, .

Aryanezhad, M.B., Noorollahi, E., Karimi-Nasab, M., Ghoreyshi, S.M. Batch sizing with random yield and imperfect inspection and process compressibility (2010) 40th International Conference on Computers and Industrial Engineering: Soft Computing Techniques for Advanced Manufacturing and Service Systems, CIE40 2010, art. no. 5668221, .

Aryanezhad, M.B., Ghoreyshi, S.M., Karimi-Nasab, M., Noorollahi, E. A new lot sizing model for deteriorating items with production compressibility (2010) 40th International Conference on Computers and Industrial Engineering: Soft Computing Techniques for Advanced Manufacturing and Service Systems, CIE40 2010, art. no. 5668220, .

Aryanezhad, M.B., Sahebi, H., Karimi-Nasab, M. A JIT discount inventory model for multi-stage supply chain (2010) Kuwait Journal of Science and Engineering, 37 (1 B), pp. 225-250.

Karimi-Nasab, M., Pakgohar, A. Multi-period multi-product production planning with controllable processing times for deteriorating items (2010) IIE Annual Conference and Expo 2010 Proceedings, .

Aryanezhad, M.B., Soudi, A., Karimi-Nasab, M. A multi-objective model for multi-stage multi-product imperfect production with rework possibility (2010) IIE Annual Conference and Expo 2010 Proceedings, .

Aryanezhad, M.B., Talebi, S., Karimi-Nasab, M. A new approach for production scheduling with compressible processing times (2010) IIE Annual Conference and Expo 2010 Proceedings, .