Yuanshyi Peter Chiu

Editor


Yuan-Shyi Peter Chiu Chaoyang University of Technology, Taichung, Taiwan
Email: ypchiu@cyut.edu.tw



1. Chiu, Yuan-Shyi Peter, Jhan, J-H., Chiu, V., Chiu, S.W.* (2020) Fabrication cycle time and shipment decision for a multiproduct intra-supply chain system with external source and scrap. International Journal of Mathematical, Engineering and Management Sciences, 5(4): 614-630, 2020-8.

2. Chiu, Yuan-Shyi Peter, Zhao, Z-Y., Chiu, S.W.*, Chiu, V. (2020). A vendor-buyer coordinated system featuring an unreliable machine, scrap, outsourcing, and multiple shipments. International Journal of Industrial Engineering Computations, 11(3): 341-358, 2020-7.

3. Chiu, S.W., Zhao, Z-Y., Chiu, T., Chiu, Yuan-Shyi Peter* (2020) Combining the delayed differentiation policy and common parts’ partial outsourcing strategy into a multi-item FPR-based system. Journal of Applied Engineering Science 18(2): 273-280; 2020-6.

4. Chiu, Yuan-Shyi Peter, Wu, C-S., Chiu, V., Sung, P-C.* (2020) Determining the optimal cycle length for a multiproduct EMQ problem considering rework and overtime options. Journal of King Saud University- Engineering Sciences, 32(4): 265-273, 2020-5.

5. Chiu, Yuan-Shyi Peter, Chen, Y-R., Wu, H-Y., Chou, C-L.* (2020) Determining the economic manufacturing lot size with expedited fabrication rate and product quality assurance. International Journal of Mathematical, Engineering and Management Sciences, 5 (2): 193-207, 2020-4.

6. Chiu, Yuan-Shyi Peter, Lin, Y-K, Lin, H-D.* (2020) Effective image models for inspecting profile flaws of car mirrors with applications. Journal of Applied Engineering Science 18(1): 81-91; 2020-3.

7. Chiu, Yuan-Shyi Peter, Lin, H-D.*, Wu, H-Y. (2020) Note on Cost minimization for a multi-product fabrication-distribution problem with commonality, postponement and quality assurance. Journal of Applied Research and Technology, 18(1): 21-26, 2020-2.

8. Chiu, Yuan-Shyi Peter, Li, Y-Y., Chiu, T., Chiu, S.W.* (2020) Determining optimal uptime considering an unreliable machine, a maximum permitted backorder level, a multi-delivery plan, and disposal/rework of imperfect items. Journal of King Saud University- Engineering Sciences, 32(1): 69-77, 2020-1.

9. Chiu, S.W., Huang, Y-J., Chou, C-L., Chiu, Yuan-Shyi Peter* (2020) Manufacturing runtime problem with an expedited fabrication rate, random failures, and scrap. International Journal of Industrial Engineering Computations, 11(1): 35-50, 2020-1.

10. Chiu, S.W., Chen, H-C., Wu, H-Y., Chiu, Yuan-Shyi Peter* (2020) A hybrid finite production rate system featuring random breakdown and rework. Operations Research Perspectives, 7 (2020): 100142, 1-10, 2020-1.

11. Chiu, Yuan-Shyi Peter, Chiu, V., Lin, H-D.*, Chiu, T. (2019) An EMQ-based system considering machine malfunction, allowable backlogging level, repairable items, and discontinuous issuing policy. Journal of Engineering Research, 7(4): 276-298, 2019-12.

12. Chiu, S.W., Li, Y-Y., Chiu, V., Chiu, Yuan-Shyi Peter* (2019) Satisfying product demand with a quality-assured hybrid EMQ-based replenishment system. Journal of Engineering Research, 7(4): 225-237, 2019-12. 13. Chiu, Yuan-Shyi Peter, Chen, H-C., Chang, H-H., Hwang, M-H.* (2019) Determining rotation cycle and distribution frequency for a vendor-buyer integrated multi-item system considering an external provider and rework. International Journal of Industrial Engineering Computations, 10(4): 505-520, 2019-10.

14. Lin, H-D., Chen, Y-R., Chiu, V., Chiu, Yuan-Shyi Peter*, (2019) A decision model for a quality-assured EPQ-based intra-supply chain system considering overtime option. Journal of Applied Engineering Science 17(3): 361-371; 2019-9.

15. Chiu, S.W., Kuo, J-S., Chiu, Yuan-Shyi Peter*, Chang, H-H. (2019) Production and distribution decisions for a multi-product system with component commonality, postponement strategy and quality assurance using a two-machine scheme. Jordan Journal of Mechanical & Industrial Engineering 13(2): 105-115, 2019-7.

16. Chiu, S.W., Huang, Y-J., Chiu, Yuan-Shyi Peter*, Chiu, T. (2019) Satisfying multiproduct demand with a FPR-based inventory system featuring expedited rate and scraps. International Journal of Industrial Engineering Computations, 10(3): 443-452, 2019-7.

17. Chiu, Yuan-Shyi Peter, Chiu, V., Lin, H-D.*, Chang, H-H. (2019) Meeting multiproduct demand with a hybrid inventory replenishment system featuring quality reassurance. Operations Research Perspectives, 6 (2019) 100112: 1-8, 2019-5.

18. Chiu, Yuan-Shyi Peter, Chen, Y-R., Chiu, V., Chiu, S.W. (2019) Joint effects of stochastic machine failure, backorder of permissible shortage, rework, and scrap on stock replenishing decision. International Journal of Industrial Engineering Computations, 10(2): 263-280, 2019-4

19. Chiu, S.W., Liang, G-M., Chiu, Yuan-Shyi Peter*, Chiu, T. (2019) Production planning incorporating issues of reliability and backlogging with service level constraint. Operations Research Perspectives, 6 (2019) 100090: 1-10, 2019-5.

20. Chiu, S.W., Chen, H-Y., Wu, H-Y., Chiu, Yuan-Shyi Peter* (2019) Mathematical modeling for a fabrication-inventory problem with scrap, an acceptable stock-out level, stochastic failures, and a multi-shipment policy. Arab Journal of Basic and Applied Sciences, 26(1): 58-71, 2019-1.

21. Chiu, Yuan-Shyi Peter, Chen, H-Y., Chiu, T., Chiu, S.W. (2018) Incorporating flexible fabrication rate and random scrap into a FPR-based supply-chain system. Economic Computation and Economic Cybernetics Studies and Research 52(2): 157-174, 2018-5.

22. Chiu, Yuan-Shyi Peter, Lin, H-D. (2018) Creation of image models for inspecting visual flaws on capacitive touch screens. Journal of Applied Engineering Science 16(3): 333-342 2018-9.

23. Chiu, Yuan-Shyi Peter, Lin, H-D., Wu, M-F., Chiu, S.W. (2018) Alternative fabrication scheme to study effects of rework of nonconforming products and delayed differentiation on a multiproduct supply-chain system. International Journal of Industrial Engineering Computations 9(2):235-248, 2018-3.

24. Chiu, Yuan-Shyi Peter, Chen, H-Y., Chiu, S.W., Chiu, V. (2018) Optimization of an economic production quantity-based system with random scrap and adjustable production rate. Journal of Applied Engineering Science 16(1): 11-18 2018-3.

25. Chiu, S.W., Chen, H-M., Lin, H-D., Chiu, Yuan-Shyi Peter* Optimization of an intra-supply chain system with unreliable production facility. Journal of Applied Engineering Science 16(2): 192-201, 2018-6.

26. Chiu, S.W., Wu, H-Y., Chiu, Yuan-Shyi Peter*, Hwang, M-H. (2018) Exploration of finite production rate model with overtime and rework of nonconforming products. Journal of King Saud University - Engineering Sciences 30(3): 224-231, 2018-7.

27. Chiu, S.W., Lin, H-D., Chou, C-L., Chiu, Yuan-Shyi Peter* (2018) Mathematical modeling for exploring the effects of overtime option, rework, and discontinuous inventory issuing policy on EMQ model. International Journal of Industrial Engineering Computations 9(4): 479-490, 2018-10.

28. Chiu, Yuan-Shyi Peter, Liu, C-J., Hwang, M-H. (2017) Optimal Batch Size Considering Partial Outsourcing Plan and Rework. Jordan Journal of Mechanical and Industrial Engineering 11(3): 195-200, 2017-9.

29. Chiu, S.W., Liu, C-J., Chen, Y-R., Chiu, Yuan-Shyi Peter* (2017) Finite production rate model with backlogging, service level constraint, rework, and random breakdown. International Journal for Engineering Modelling, 30(1-4): 63-80; 2017-12.

30. Tseng, C-T., Lee, C-H., Chiu, Yuan-Shyi Peter, Lu, W-T (2017) A discrete electromagnetism-like mechanism for parallel machine scheduling under a grade of service provision. International Journal of Production Research 55(11):3149-3163, 2017-6.

31. Chiu, Yuan-Shyi Peter, Kuo, J-S., Chiu, S.W.*, Hsieh, Y-T. (2016) Effect of delayed differentiation on a multi–product vendor–buyer integrated inventory system with rework. Advances in Production Engineering & Management 11(4): 333-344; 2016-12.

32. Chiu, Yuan-Shyi Peter, Chiang, K-W., Chiu, S.W.*, Song, M-S. (2016) Simultaneous determination of production and shipment decisions for a multi-product inventory system with a rework process. Advances in Production Engineering & Management 11(2): 141-151; 2016-6

33. Chiu, Yuan-Shyi Peter, Chou, C-L., Chang, H-H., Chiu, S.W.* (2016) Solving multi- customer FPR model with quality assurance and discontinuous deliveries using a two-phase algebraic approach. SpringerPlus 5:493 (DOI: 10.1186/s40064-016- 2154-0) 2016-4.

34. Chiu, Yuan-Shyi Peter, Liang, G-M., Chiu, S.W.* (2016) Solving a fabrication lot-size and shipping frequency problem with an outsourcing policy and random scrap. Mathematical and Computational Applications, 21(4), 45 (doi:10.3390/mca21040045) 2016-12.

35. Chiu, Yuan-Shyi Peter, Hsieh, Y-T., Kuo, J-S. Chiu, S.W. (2016) A delayed differentiation multi-product FPR model with scrap and a multi-delivery policy – I: Using single-machine production scheme. International Journal for Engineering Modelling, 29(1-4): 37-52; 2016-12.

36. Chiu, Yuan-Shyi Peter, Lin, H-D., Tseng, C-T., Chiu, S.W. (2016) Determining cycle time for a multiproduct FPR model with rework and an improved delivery policy by alternative approach. International Journal for Engineering Modelling, 29 (1-4): 27-36; 2016-12.

37. Chiu, S. W., Hsieh, Y-T., Chiu, Yuan-Shyi Peter*, Hwang, M-H. (2016) A delayed differentiation multi-product FPR model with scrap and a multi-delivery policy – II: Using two-machine production scheme. International Journal for Engineering Modelling, 29(1-4): 53-68; 2016-12.

38. Chiu, S.W., Chen, S-W., Chang, C-K., Chiu, Yuan-Shyi Peter* (2016) Optimization of a multi–product intra-supply chain system with failure in rework. PloS ONE 11(12): e0167511, DOI:10.1371/journal.pone.0167511, 1-17, 2016-12.

39. Chiu, S.W., Chen, S-W., Chiu, Yuan-Shyi Peter*, Li, T-W. (2016) Producer-retailer integrated EMQ system with machine breakdown, rework failures, and a discontinuous inventory issuing policy. SpringerPlus 5:339 (DOI: 10.1186/s40064-016-1980-4) 2016-3.

40. Chiu, S.W., Kuo, J-S., Chiu, V., Chiu, Yuan-Shyi Peter* (2016) Cost minimization for a multi-product fabrication-distribution problem with commonality, postponement, and quality assurance. Mathematical and Computational Applications, 21(3), 38; (doi:10.3390/mca 21030038), 2016-9.

41. Chiu, Yuan-Shyi Peter, Sung, P-C., Chiu, S.W., Chou, C-L. (2015) Mathematical modeling of a multi-product EMQ model with an enhanced end items issuing policy and failures in rework. SpringerPlus (2015) 4:679 11 pages (DOI:10.1186/s40064-015-1487-4) 2015-11.

42. Chiu, S.W., Sung, P-C., Tseng, C-T., Chiu, Yuan-Shyi Peter* (2015) Multi-product FPR model with rework and multi-shipment policy resolved by algebraic approach. Journal of Scientific & Industrial Research, 74(10): 555-559; 2015-10.

43. Chiu, S. W., Chang, C-K., Song, M-S., Chiu, Yuan-Shyi Peter* (2015) An EPQ model with random breakdown, rework, and a discontinuous issuing policy. International Journal for Engineering Modelling, 28(1-4): 1-15; 2016-5.

44. Chiu, Yuan-Shyi Peter, Wu, M-F., Chiu, S.W.*, Chang, H-H. (2015) A simplified approach to the multi-item economic production quantity model with scrap, rework, and multi-delivery. Journal of Applied Research and Technology, 13(4), 472-476; 2015-8.

45. Chiu, S. W., H-D. Lin, M-S. Song, H-M Chen, Yuan-Shyi Peter Chiu (2015) An extended EPQ-based problem with a discontinuous delivery policy, scrap rate, and random breakdown. The Scientific World Journal, Volume 2015, Article ID 621978, 13 pages, 2015-2 [SCI; SJR-Q2.] (I.F. 1.219: 29.1%).

46. Chiu, Yuan-Shyi Peter, Wu, M-F., Cheng, F-T., Hwang, M-H. (2014) Replenishment lot sizing with failure in rework and an enhanced multi-shipment policy. Journal of Scientific & Industrial Research, 73(10), 648-652; 2014-10.

47. Chiu, Yuan-Shyi Peter, Chen, Y-C., Lin, H-D., Chang, H-H.* (2014) Combining an improved multi-delivery policy into a single-producer multi-retailer integrated inventory system with scrap in production. Economic Modelling, 39: 163-167; 2014-4.

48. Chiu, Yuan-Shyi Peter, Lin, L-W., Pai, F-Y., Chiu, S.W.* (2014) Finite production rate model with quality assurance, multi-customer, and discontinuous deliveries. Journal of Applied Research and Technology, 12 (1), 5-13; 2014-2.

49. Chiu, Yuan-Shyi Peter, Chang, H-H.* (2014) Optimal run time for EPQ model with scrap, rework and stochastic breakdowns: A note. Economic Modelling, 37: 143-148; 2014-2.

50. Wu, M-F., Chiu, Yuan-Shyi Peter*, Sung, P-C. (2014) Optimization of a multi-product EPQ model with scrap and an improved multi-delivery policy. Journal of Engineering Research, 2 (4): 103-118; 2014-12.

51. Tseng, C-T., Wu, M-F., Lin, H-D., Chiu, Yuan-Shyi Peter* (2014) Solving a vendor- buyer integrated problem with rework and a specific multi-delivery policy by a two- phase algebraic approach. Economic Modelling, 36: 30-36; 2014-1.

52. Chiu, Yuan-Shyi Peter, Chiang K-W., Wu, M-F., Chiu, S.W. (2014) Revisiting “integrating a cost reduction shipment plan into a single-producer multi-retailer system with rework” using an alternative approach. International Journal for Engineering Modelling, 27(1-2): 43-51; 2014-7.

53. Chiu, S.W., Chiu, Yuan-Shyi Peter*, Li, T-W., Chen, H-M. (2014) A Multi-product FPR model with rework and an improved delivery. International Journal for Engineering Modelling, 27(3-4): 111-118; 2014-12.

54. Chiu, S.W., Pan, N., Chiang, K-W., Chiu, Yuan-Shyi Peter* (2014) Integrating a cost reduction shipment plan into a single-producer multi-retailer system with rework. International Journal for Engineering Modelling, 27(1-2): 33-41; 2014-7.

55. Chiu, Yuan-Shyi Peter, Lin, H-D.* (2013) An Innovative Blemish Detection System for Curved LED Lenses. Expert Systems with Applications, 40(2): 471-479; 2013-2.

56. Chiu, Yuan-Shyi Peter, Lin, H-D., Cheng, F-T., Hwang, M-H. (2013) Optimal common cycle time for a multi-item production system with discontinuous delivery policy and failure in rework. Journal of Scientific & Industrial Research, 72(7): 435-440; 2013-7.

57. Chiu, Yuan-Shyi Peter, Chen, K-K., Cheng, F-T., Ting, C-K.* (2013) Reexamination of "Combining an alternative multi-delivery policy into economic production lot size problem with partial rework" Using Alternative Approach. Journal of Applied Research and Technology, 11(3), 317-323; 2013-6.

58. Chiu, Yuan-Shyi Peter, C-C. Huang, M-F. Wu, H-H. Chang (2013) Joint determination of rotation cycle time and number of shipments for a multi-item EPQ model with random defective rate. Economic Modelling, 35: 112-117; 2013-9.

59. Chiu, S.W., Lee, C-H., Chiu, Yuan-Shyi Peter*, Cheng, F-T. (2013) Intra-supply chain system with multiple sales locations and quality assurance. Expert Systems with Applications, 40(7): 2669-2676; 2013-6.

60. Chiu, Yuan-Shyi Peter, Lin, H-D., Chang, H-H* (2012) Determination of production- shipment policy using a two-phase algebraic approach. Maejo International Journal of Science and Technology, 6(1): 119-129; 2012-4.

61. Chiu, Yuan-Shyi Peter, Chen, K-K., Ting, C-K* (2012) Replenishment run time problem with machine breakdown and failure in rework. Expert Systems with Applications, 39(1): 1291-1297; 2012-1.

62. Lin, H-D., Chiu, Yuan-Shyi Peter* (2012) Note on “replenishment run time problem with machine breakdown and failure in rework". Expert Systems with Applications, 39(17): 13070- 13072; 2012-12.

63. Chiu, S.W., Chen, K-K., Chiu, Yuan-Shyi Peter*, Ting, C-K. (2012) Note on the mathematical modeling approach used to determine the replenishment policy for the EMQ model with rework and multiple shipments. Applied Mathematics Letters, 25(11): 1964-1968; 2012-11.

64. Chiu, S.W., Chiu, Yuan-Shyi Peter, Yang, J-C* (2012) Combining an alternative multi-delivery policy into economic production lot size problem with partial rework. Expert Systems with Applications, 39(3): 2578-2583; 2012-2.

65. Chiu, Yuan-Shyi Peter, Lin, Y-C., Lin, L-W., Chiu, S.W.* (2012) A single-producer multi-retailer integrated inventory model with a rework process. International Journal for Engineering Modelling, 25(1-4): 27-35; 2013-8.

66. Chiu, Yuan-Shyi Peter, Pan, N., Chiu, S.W.*, Chiang, K-W. (2012) Optimal production cycle time for multi-item FPR model with rework and multi-shipment policy. International Journal for Engineering Modelling, 24(1-4): 51-57; 2013-8.

67. Chiu, S.W., Lin, H-D., Lin, L-W., Chiu, Yuan-Shyi Peter*, (2012) Reexamining a single-producer multi-retailer integrated inventory model with rework using algebraic method. International Journal for Engineering Modelling, 25(1-4): 37-43; 2013-8.

68. Chiu, Yuan-Shyi Peter, Lin, Y-C., Chiu, S.W., Ting C-K* (2012) Jointly determining lot-size and shipment policy for a vendor-buyer system with rework and an improving delivery plan. African Journal of Business Management, 6(1): 333-340; 2012-1.

69. Chiu, Yuan-Shyi Peter, Liu, S-C., Chiu, C-L., Chang, H-H. (2011) Mathematical modelling for determining the replenishment policy for EMQ model with rework and multiple shipments. Mathematical and Computer Modelling 54(9-10): 2165-2174; 2011-11.

70. Chiu, Yuan-Shyi Peter, Lin, H-D. and Chang, H-H. (2011) Mathematical modeling for solving manufacturing run time problem with defective rate and random machine breakdown. Computers & Industrial Engineering, 60(4): 576-584; 2011-5.

71. Chiu, Yuan-Shyi Peter, Chang, C-Y., Ting, C-K., Chiu, S.W.* (2011) Effect of variable shipping frequency on production-distribution policy in a vendor-buyer integrated system. International Journal for Engineering Modelling, 24(1-4): 11-20; 2011-12.

72. Chiu, Yuan-Shyi Peter, Lin, H-D., Cheng, F-T., Chiu, S.W.* (2011) A note on ‘impacts of random scrap rate on production system in supply chain environment with a specific shipping policy’. International Journal for Engineering Modelling, 24(1-4): 41-47; 2011-12.

73. Ting, C-K., Chiu, Yuan-Shyi Peter*, Chan, C-C.H. (2011) Optimal lot sizing with scrap and random breakdown occurring in backorder replenishing period. Mathematical & Computational Applications, 16(2): 329-339; 2011-3.

74. Chiu, Yuan-Shyi Peter, Lin, C-A.K., Chang, H-H. and Chiu, V. (2010) Mathematical modeling for determining economic batch size and optimal number of deliveries for EPQ model with quality assurance. Mathematical and Computer Modelling of Dynamical Systems, 16(4): 373-388; 2010-7.

75. Chiu, Yuan-Shyi Peter, Chen, K-K., Cheng, F-T., Wu, M-F. (2010) Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown. Computers and Mathematics with Applications, 59(2): 919-932; 2010-1.

76. Chiu, Yuan-Shyi Peter and Ting, C-K. (2010) A note on ‘Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns’. European Journal of Operational Research, 201(2): 641-643; 2010-.

77. Chiu, Yuan-Shyi Peter, Cheng, F-T., Chang, H-H. (2010) Remarks on optimization process of manufacturing system with stochastic breakdown and rework. Applied Mathematics Letters, 23(10): 1152-1155; 2010-10.

78. Chiu, Yuan-Shyi Peter, Chen, K-K., Chang, H-H. (2010) Solving an economic production lot size problem with multi-delivery policy and quality assurance using an algebraic approach. Journal of Scientific & Industrial Research, 69(12): 926-929; 2010-12.

79. Lin, H-D., Chiu, Yuan-Shyi Peter (2010) RBF network and EPC method applied to automated process regulations for passive components dicing. International Journal of Innovative Computing, Information and Control, 6(11): 5077-5091; 2010-11.

80. Chiu, S.W., Chiu, Yuan-Shyi Peter*, Lin, L-W., Lin, Y-C. (2010) Production lot sizing with rework and fixed quantity deliveries. International Journal for Engineering Modelling, 23(1-4): 23-30; 2010-12 [EI.]

81. Chiu, S.W., Chiu, Yuan-Shyi Peter*, Lin, C-A. K., Chang, C-Y. (2010) Solving finite production rate model with scrap and multiple shipments using algebraic approach. International Journal for Engineering Modelling, 23(1-4): 43-47; 2010-12.