How to cite this paper
Chiu, Y., Yan, T., Wang, Y & Wang, H. (2023). Replenishment-shipment decision for a multiproduct producer-client coordinated FPR model with postponement, rework and subcontracting.Uncertain Supply Chain Management, 11(1), 213-226.
Refrences
Akhtar, M. (2022). Sustainable and Agile Manufacturing Outsourcing Partner Selection: a literature review. International Journal of Production Management and Engineering, 10(2), 143-158.
Aljumah, A.I., Shahroor, H., Nuseir, M.T., & El Refae, G.A. (2022). The effects of employee commitment and environment uncertainty on product quality: The mediating role of supply chain integration. Uncertain Supply Chain Management, 10(4), 1379-1386.
Blom, T., & Niemann, W. (2022). Managing reputational risk during supply chain disruption recovery: A triadic logistics outsourcing perspective. Journal of Transport and Supply Chain Management, 16, Art. No. a623.
Bolaños, R.D.S., & Barbalho, S.C.M. (2021). Exploring product complexity and prototype lead-times to predict new product development cycle-times. International Journal of Production Economics, 235, Art. No. 108077.
Boone, C.A., Craighead, C.W., & Hanna, J.B. (2007) Postponement: An evolving supply chain concept. International Journal of Physical Distribution and Logistics Management, 37(8), pp. 594-611.
Chiu, Y.-S.P., Zhao, Z.-Y., Chiu, S.W., & Chiu, V. (2020). A vendor-buyer coordinated system featuring an unreliable machine, scrap, outsourcing, and multiple shipments. International Journal of Industrial Engineering Computations, 11(3), 341-358.
Chiu, Y.-S.P., Lin, H.-D., & Cheng, H.-H. (2021). Optical inspection of appearance faults for auto mirrors using Fourier filtering and convex hull arithmetic. Journal of Applied Research and Technology, 19(4), 279-293.
Chiu, Y.-S.P., Ke, C.-Y., Chiu, T., & Yeh, T.-M. (2022a). Optimizing an FPR-based supplier-retailer integrated problem with an outsourcer, rework, expedited rate, and probabilistic breakdown. International Journal of Industrial Engineering Computations, 13(4), 601-616.
Chiu, Y.-S.P., Chiu, S.W., Chiu, T., & Wang, H.-C. (2022b). The collective effect of rework, expedited-rate, external source, and machine failures on manufacturing runtime planning. Decision Science Letters, 11(4), 529-544.
Choi, E.K. (2007). To outsource or not to outsource in an integrated world. International Review of Economics and Finance, 16(4), 521-527.
Chukwunweike, N.V., Ani, M.I., Ocheje, F.J., & Akunna, O.V. (2015). Production subcontracting: A strategy for the survival of small and medium scale industries in Nigeria. Mediterranean Journal of Social Sciences, 6(4S2), 639-651.
Comert, S.E., Yazgan, H.R., & Turk, G. (2022). Hopfield neural network based on clustering algorithms for solving green vehicle routing problem. International Journal of Industrial Engineering Computations, 13(4), 573-586.
Cornelius, A., Dvorak, J., Jacobs, L., Penney, J., & Schmitz, T. (2021). Combination of structured light scanning and external fiducials for coordinate system transfer in hybrid manufacturing. Journal of Manufacturing Processes, 68, 1824-1836.
de Carvalho, V.D.H., Poleto, T., Nepomuceno, T.C.C., & Costa, A.P.P.C.S. (2022). A study on relational factors in information technology outsourcing: analyzing judgments of small and medium-sized supplying and contracting companies' managers. Journal of Business and Industrial Marketing, 37(4), 893-917.
Di Nardo, M., Madonna, M., Addonizio, P., & Gallab, M. (2021). A mapping analysis of maintenance in Industry 4.0. Journal of Applied Research and Technology, 19(6), 653-675.
Galizia, F.G., ElMaraghy, H.A., Bortolini, M., & Mora, C. (2020). Product platforms design, selection and customisation in high-variety manufacturing. International Journal of Production Research, 58, 893-911.
Garcĺa, A., & de las Morenas, J. (2012). Integrated production attending to supply chain, materials handling and storage requirements. International Journal of Advanced Logistics, 1(1), 21-32.
Gualandris, J., & Kalchschmidt, M. (2015). Mitigating the effect of risk conditions on supply disruptions: The role of manufacturing postponement enablers. Production Planning and Control, 26(8), 637-653.
Harap, J. (2010). Production perspectives: 6 keys to successful outsourcing. Publishing Executive, 25(3), 1-2.
Jafari, H., Eslami, M.H., & Paulraj, A. (2022). Postponement and logistics flexibility in retailing: The moderating role of logistics integration and demand uncertainty. International Journal of Production Economics, 243, Art. No. 108319.
Kavčič, K., Bončina, K., Suklan, J., & Milost, F. (2015). Development design of outsourcing strategies: The case of Slovenia. Ekonomski Pregled, 66(5), 455-476.
Kiani, M., Eksioglu, B., Isik, T., Thomas, A., & Gilpin, J. (2022). Evaluating appointment postponement in scheduling patients at a diagnostic clinic. Naval Research Logistics, 69(1), 76-91.
Lahiri, S., Karna, A., Chittaranjan Kalubandi, S., & Edacherian, S. (2022). Performance implications of outsourcing: A meta-analysis. Journal of Business Research, 139, 1303-1316.
Lin, H.-D., Chiu, T., Hwang, M.-H., & Peter Chiu, Y.-S. (2022a). Multi-item fabrication-shipment decision model featuring multi-delivery, postponement, quality assurance, and overtime. Uncertain Supply Chain Management, 10(3), 1041-1054.
Lin, H.-D., Lee, T.-H., Lin, C.-H., & Chiu, Y.-S.P. (2022b). Exploring quality inspection and grade judgment of distortion defects in the fabrication of spectacle lenses. Decision Science Letters, 11(4), 497-508.
Nachiappan, S.P., Jawahar, N., & Kumar, N.K. (2008). Operating parameters for a single-vendor multiple-buyers vendor managed inventory system with outsourcing. International Journal of Operational Research, 3(3), 336-361.
Ohmori, S., & Yoshimoto, K. (2021). Multi-product multi-vehicle inventory routing problem with vehicle compatibility and site dependency: A case study in the restaurant chain industry. Uncertain Supply Chain Management, 9(2), 351-362.
Ramón-Lumbierres, D., Heredia Cervera, F.J., Minguella-Canela, J., & Muguruza-Blanco, A. (2021). Optimal postponement in supply chain network design under uncertainty: an application for additive manufacturing. International Journal of Production Research, 59(17), 5198-5215.
Riaño, H.B., Escobar, J.W., & Clavijo-Buritica, N. (2022). A new metaheuristic approach for the meat routing problem by considering heterogeneous fleet with time windows. International Journal of Industrial Engineering Computations, 13(4), 661-676.
Roy, M.D., Sana, S.S., & Chaudhuri, K. (2014). An economic production lot size model for defective items with stochastic demand, backlogging and rework. IMA Journal of Management Mathematics, 25(2), 159-183.
Seçkin, A.Ç., & Seçkin, M. (2022). Detection of fabric defects with intertwined frame vector feature extraction. Alexandria Engineering Journal, 61(4), 2887-2898.
Singh, C., & Singh, S.R. (2013). Vendor-buyers relationship model for deteriorating items with shortages, fuzzy trapezoidal costs and inflation. Yugoslav Journal of Operations Research, 23(1), 73-85.
Suharmono, M., Alexandri, M.B., Sumadinata, R.W.S., & Muhyi, H.A. (2022). Outsourcing in supply chain: A bibliometric analysis. Uncertain Supply Chain Management, 10(4), 1501-1508.
Taheri-Tolgari, J., & Mirzazadeh, A. (2021). Multi-item single-source production quantity model for imperfect items with rework failure, inspection errors, scraps, and backordering. International Journal of Industrial and Systems Engineering, 38(3), 291-327.
Thongrawd, C., Skulitsariyaporn, C., Sirisopana, S., & Chomchom, N. (2020). The impact of the strategic supplier partnership, and strategic outsourcing on the supply chain performance: The mediating role of customer relationship. International Journal of Supply Chain Management, 9(2), 562-571.
Uzen, H., Turkoglu, M., & Hanbay, D. (2021). Texture defect classification with multiple pooling and filter ensemble based on deep neural network. Expert Systems with Applications, 175, Art. No. 114838.
Yassine, N. (2020). A sustainable economic production model: effects of quality and emissions tax from transportation. Annals of Operations Research, 290(1-2), 73-94.
Aljumah, A.I., Shahroor, H., Nuseir, M.T., & El Refae, G.A. (2022). The effects of employee commitment and environment uncertainty on product quality: The mediating role of supply chain integration. Uncertain Supply Chain Management, 10(4), 1379-1386.
Blom, T., & Niemann, W. (2022). Managing reputational risk during supply chain disruption recovery: A triadic logistics outsourcing perspective. Journal of Transport and Supply Chain Management, 16, Art. No. a623.
Bolaños, R.D.S., & Barbalho, S.C.M. (2021). Exploring product complexity and prototype lead-times to predict new product development cycle-times. International Journal of Production Economics, 235, Art. No. 108077.
Boone, C.A., Craighead, C.W., & Hanna, J.B. (2007) Postponement: An evolving supply chain concept. International Journal of Physical Distribution and Logistics Management, 37(8), pp. 594-611.
Chiu, Y.-S.P., Zhao, Z.-Y., Chiu, S.W., & Chiu, V. (2020). A vendor-buyer coordinated system featuring an unreliable machine, scrap, outsourcing, and multiple shipments. International Journal of Industrial Engineering Computations, 11(3), 341-358.
Chiu, Y.-S.P., Lin, H.-D., & Cheng, H.-H. (2021). Optical inspection of appearance faults for auto mirrors using Fourier filtering and convex hull arithmetic. Journal of Applied Research and Technology, 19(4), 279-293.
Chiu, Y.-S.P., Ke, C.-Y., Chiu, T., & Yeh, T.-M. (2022a). Optimizing an FPR-based supplier-retailer integrated problem with an outsourcer, rework, expedited rate, and probabilistic breakdown. International Journal of Industrial Engineering Computations, 13(4), 601-616.
Chiu, Y.-S.P., Chiu, S.W., Chiu, T., & Wang, H.-C. (2022b). The collective effect of rework, expedited-rate, external source, and machine failures on manufacturing runtime planning. Decision Science Letters, 11(4), 529-544.
Choi, E.K. (2007). To outsource or not to outsource in an integrated world. International Review of Economics and Finance, 16(4), 521-527.
Chukwunweike, N.V., Ani, M.I., Ocheje, F.J., & Akunna, O.V. (2015). Production subcontracting: A strategy for the survival of small and medium scale industries in Nigeria. Mediterranean Journal of Social Sciences, 6(4S2), 639-651.
Comert, S.E., Yazgan, H.R., & Turk, G. (2022). Hopfield neural network based on clustering algorithms for solving green vehicle routing problem. International Journal of Industrial Engineering Computations, 13(4), 573-586.
Cornelius, A., Dvorak, J., Jacobs, L., Penney, J., & Schmitz, T. (2021). Combination of structured light scanning and external fiducials for coordinate system transfer in hybrid manufacturing. Journal of Manufacturing Processes, 68, 1824-1836.
de Carvalho, V.D.H., Poleto, T., Nepomuceno, T.C.C., & Costa, A.P.P.C.S. (2022). A study on relational factors in information technology outsourcing: analyzing judgments of small and medium-sized supplying and contracting companies' managers. Journal of Business and Industrial Marketing, 37(4), 893-917.
Di Nardo, M., Madonna, M., Addonizio, P., & Gallab, M. (2021). A mapping analysis of maintenance in Industry 4.0. Journal of Applied Research and Technology, 19(6), 653-675.
Galizia, F.G., ElMaraghy, H.A., Bortolini, M., & Mora, C. (2020). Product platforms design, selection and customisation in high-variety manufacturing. International Journal of Production Research, 58, 893-911.
Garcĺa, A., & de las Morenas, J. (2012). Integrated production attending to supply chain, materials handling and storage requirements. International Journal of Advanced Logistics, 1(1), 21-32.
Gualandris, J., & Kalchschmidt, M. (2015). Mitigating the effect of risk conditions on supply disruptions: The role of manufacturing postponement enablers. Production Planning and Control, 26(8), 637-653.
Harap, J. (2010). Production perspectives: 6 keys to successful outsourcing. Publishing Executive, 25(3), 1-2.
Jafari, H., Eslami, M.H., & Paulraj, A. (2022). Postponement and logistics flexibility in retailing: The moderating role of logistics integration and demand uncertainty. International Journal of Production Economics, 243, Art. No. 108319.
Kavčič, K., Bončina, K., Suklan, J., & Milost, F. (2015). Development design of outsourcing strategies: The case of Slovenia. Ekonomski Pregled, 66(5), 455-476.
Kiani, M., Eksioglu, B., Isik, T., Thomas, A., & Gilpin, J. (2022). Evaluating appointment postponement in scheduling patients at a diagnostic clinic. Naval Research Logistics, 69(1), 76-91.
Lahiri, S., Karna, A., Chittaranjan Kalubandi, S., & Edacherian, S. (2022). Performance implications of outsourcing: A meta-analysis. Journal of Business Research, 139, 1303-1316.
Lin, H.-D., Chiu, T., Hwang, M.-H., & Peter Chiu, Y.-S. (2022a). Multi-item fabrication-shipment decision model featuring multi-delivery, postponement, quality assurance, and overtime. Uncertain Supply Chain Management, 10(3), 1041-1054.
Lin, H.-D., Lee, T.-H., Lin, C.-H., & Chiu, Y.-S.P. (2022b). Exploring quality inspection and grade judgment of distortion defects in the fabrication of spectacle lenses. Decision Science Letters, 11(4), 497-508.
Nachiappan, S.P., Jawahar, N., & Kumar, N.K. (2008). Operating parameters for a single-vendor multiple-buyers vendor managed inventory system with outsourcing. International Journal of Operational Research, 3(3), 336-361.
Ohmori, S., & Yoshimoto, K. (2021). Multi-product multi-vehicle inventory routing problem with vehicle compatibility and site dependency: A case study in the restaurant chain industry. Uncertain Supply Chain Management, 9(2), 351-362.
Ramón-Lumbierres, D., Heredia Cervera, F.J., Minguella-Canela, J., & Muguruza-Blanco, A. (2021). Optimal postponement in supply chain network design under uncertainty: an application for additive manufacturing. International Journal of Production Research, 59(17), 5198-5215.
Riaño, H.B., Escobar, J.W., & Clavijo-Buritica, N. (2022). A new metaheuristic approach for the meat routing problem by considering heterogeneous fleet with time windows. International Journal of Industrial Engineering Computations, 13(4), 661-676.
Roy, M.D., Sana, S.S., & Chaudhuri, K. (2014). An economic production lot size model for defective items with stochastic demand, backlogging and rework. IMA Journal of Management Mathematics, 25(2), 159-183.
Seçkin, A.Ç., & Seçkin, M. (2022). Detection of fabric defects with intertwined frame vector feature extraction. Alexandria Engineering Journal, 61(4), 2887-2898.
Singh, C., & Singh, S.R. (2013). Vendor-buyers relationship model for deteriorating items with shortages, fuzzy trapezoidal costs and inflation. Yugoslav Journal of Operations Research, 23(1), 73-85.
Suharmono, M., Alexandri, M.B., Sumadinata, R.W.S., & Muhyi, H.A. (2022). Outsourcing in supply chain: A bibliometric analysis. Uncertain Supply Chain Management, 10(4), 1501-1508.
Taheri-Tolgari, J., & Mirzazadeh, A. (2021). Multi-item single-source production quantity model for imperfect items with rework failure, inspection errors, scraps, and backordering. International Journal of Industrial and Systems Engineering, 38(3), 291-327.
Thongrawd, C., Skulitsariyaporn, C., Sirisopana, S., & Chomchom, N. (2020). The impact of the strategic supplier partnership, and strategic outsourcing on the supply chain performance: The mediating role of customer relationship. International Journal of Supply Chain Management, 9(2), 562-571.
Uzen, H., Turkoglu, M., & Hanbay, D. (2021). Texture defect classification with multiple pooling and filter ensemble based on deep neural network. Expert Systems with Applications, 175, Art. No. 114838.
Yassine, N. (2020). A sustainable economic production model: effects of quality and emissions tax from transportation. Annals of Operations Research, 290(1-2), 73-94.