Growing Science » Tags cloud » Scheduling
Authors: M. B. Aryanezhad, Jamal Aliabadi, Reza Tavakkoli-Moghaddam
DOI: 10.5267/j.ijiec.2010.06.002
Keywords: Assembly and product structure, Cellular manufacturing system, Scheduling
Journal: IJIEC | Year: 2011 | Volume: 2 | Issue: 3 | Views: 2147 | Reviews: 0
Authors: M. Emrani Noushabadi, U. Bahalke, K. Dolatkhahi, S. Dolatkhahi, A. Makui
DOI: 10.5267/j.ijiec.2011.02.003
Keywords: Assembly line balancing, Genetic algorithm, Scheduling, Task deterioration
Journal: IJIEC | Year: 2011 | Volume: 2 | Issue: 3 | Views: 2301 | Reviews: 0
Authors: Fantahun M. Defersha
DOI: 10.5267/j.ijiec.2010.07.006
Keywords: Hybrid flexible flowshop, Lot streaming, Mathematical model, Scheduling
Journal: IJIEC | Year: 2011 | Volume: 2 | Issue: 2 | Views: 2642 | Reviews: 0
Authors: Hamidreza Haddad, Mohammadreza Nematollahi
DOI: 10.5267/j.msl.2011.12.020
Keywords: Genetic algorithm, Precedence constraints, Scheduling, Single machine, Total weighted tardiness
Journal: MSL | Year: 2002 | Volume: 2 | Issue: 2 | Views: 2492 | Reviews: 0
Authors: Daniella Castro Araújoa, Marcelo Seido Nagano
DOI: 10.5267/j.ijiec.2010.05.003
Keywords: Scheduling, Heuristic, No-wait flowshop, Sequence-dependent setup Makespan
Journal: IJIEC | Year: 2011 | Volume: 2 | Issue: 1 | Views: 2755 | Reviews: 0
Authors: Mohammad Mahavi Mazdeh, Farzad Zaerpour, Farzad Firouzi Jahantigh
DOI: 10.5267/j.ijiec.2010.02.004
Keywords: Scheduling, Sequencing, Single machine, Work in process, Job deterioration, Bi-objective, Fuzzy decision making
Journal: IJIEC | Year: 2010 | Volume: 1 | Issue: 2 | Views: 2220 | Reviews: 0
Authors: Mohammad Kazem Sayadi, Reza Ramezanian, Nader Ghaffari-Nasab
DOI: 10.5267/j.ijiec.2010.01.001
Keywords: Meta-heuristic, Firefly meta-heuristic, Ant colony, Permutation flow shop, Scheduling, Combinatorial optimization, Mixed integer programming
Journal: IJIEC | Year: 2010 | Volume: 1 | Issue: 1 | Views: 9963 | Reviews: 0
® 2010-2024 GrowingScience.Com