Growing Science » Tags cloud » Scheduling
Authors: Prakash Babu Kanakavalli, Vijaya Babu Vommi, Nageswara Rao Medikondu
Keywords: Scheduling, Automated Guided Vehicles, Fuzzy heuristic, Flexible manufacturing system and makespan
Journal: MSL | Year: 2018 | Volume: 8 | Issue: 12 | Views: 1531 | Reviews: 0
Authors: Maedeh Bank, Mohammad Mahdavi Mazdeh, Mahdi Heydari
DOI: 10.5267/j.uscm.2019.8.004
Keywords: Scheduling, Supply chain, Lifespan, Simulated Annealing, Genetic Algorithm
Journal: USCM | Year: 2020 | Volume: 8 | Issue: 1 | Views: 2033 | Reviews: 0
Authors: Ali Allahverdi
Keywords: Scheduling, Review, Uncertain processing times, Uncertain setup times
Journal: JPM | Year: 2022 | Volume: 7 | Issue: 4 | Views: 1127 | Reviews: 0
Authors: Masoud Rabbani, Soroush Aghamohammadi Bosjin, Reza Yazdanparast, Niloufar Akbarian Saravi
Keywords: Green vehicle routing, Stochastic time-dependent capacitated vehicle routing problem, Scheduling, Time window, Resiliency, Reliability
Journal: DSL | Year: 2018 | Volume: 7 | Issue: 4 | Views: 2783 | Reviews: 0
Authors: Mohsen Rajabzadeh, Mohsen Ziaee, Ali Bozorgi-Amiri
DOI: 10.5267/j.ijiec.2016.4.003
Keywords: Scheduling, Layout planning, Parallel machines
Journal: IJIEC | Year: 2016 | Volume: 7 | Issue: 4 | Views: 1887 | Reviews: 0
Authors: Mohsen Shafiei Nikabadi, Reihaneh Naderi
DOI: 10.5267/j.ijiec.2016.2.004
Keywords: Scheduling, genetic algorithm, Simulated Annealing, Unrelated parallel machines, Analytic network process
Journal: IJIEC | Year: 2016 | Volume: 7 | Issue: 4 | Views: 2622 | Reviews: 0
Authors: Daniel Rossit, Fernando Tohmé, Mariano Frutos, Jonathan Bard, Diego Broz
DOI: 10.5267/j.ijiec.2015.11.004
Keywords: Lot Streaming, Makespan, Non-Permutation Flowshop, Scheduling
Journal: IJIEC | Year: 2016 | Volume: 7 | Issue: 3 | Views: 2714 | Reviews: 0
Authors: Antonio Costa, Fulvio Cappadonna, Sergio Fichera
DOI: 10.5267/j.ijiec.2015.10.002
Keywords: Linear programming, Parallel machines, Scheduling, Tool change, Total tardiness minimization
Journal: IJIEC | Year: 2016 | Volume: 7 | Issue: 2 | Views: 1829 | Reviews: 0
Authors: Yuri Mauergauz
DOI: 10.5267/j.ijiec.2015.3.001
Keywords: Order utility, Production intensity, Scheduling
Journal: IJIEC | Year: 2015 | Volume: 6 | Issue: 3 | Views: 1744 | Reviews: 0
Authors: Djalal Hedjazi
DOI: 10.5267/j.ijiec.2015.1.002
Keywords: Maintenance activity, Resource constraints, Scheduling, Skills, Tardiness
Journal: IJIEC | Year: 2015 | Volume: 6 | Issue: 2 | Views: 2095 | Reviews: 0
® 2010-2024 GrowingScience.Com