Processing, Please wait...

  • Home
  • About Us
  • Search:
  • Advanced Search

Growing Science » Tags cloud » Resource constrained project scheduling problem

Journals

  • IJIEC (777)
  • MSL (2643)
  • DSL (690)
  • CCL (528)
  • USCM (1092)
  • ESM (421)
  • AC (562)
  • JPM (293)
  • IJDS (952)
  • JFS (101)
  • HE (32)
  • SCI (26)

Keywords

Supply chain management(168)
Jordan(165)
Vietnam(151)
Customer satisfaction(120)
Performance(115)
Supply chain(112)
Service quality(98)
Competitive advantage(97)
Tehran Stock Exchange(94)
SMEs(89)
optimization(87)
Sustainability(86)
Artificial intelligence(85)
Financial performance(84)
Trust(83)
TOPSIS(83)
Job satisfaction(81)
Genetic Algorithm(78)
Factor analysis(78)
Social media(78)


» Show all keywords

Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(66)
Mohammad Reza Iravani(64)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(40)
Dmaithan Almajali(37)
Jumadil Saputra(36)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Barween Al Kurdi(32)
Hassan Ghodrati(31)
Basrowi Basrowi(31)
Sautma Ronni Basana(31)
Mohammad Khodaei Valahzaghard(30)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Haitham M. Alzoubi(28)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)


» Show all authors

Countries

Iran(2192)
Indonesia(1311)
Jordan(813)
India(793)
Vietnam(510)
Saudi Arabia(478)
Malaysia(444)
China(231)
United Arab Emirates(226)
Thailand(160)
United States(114)
Ukraine(110)
Turkey(110)
Egypt(106)
Peru(94)
Canada(93)
Morocco(86)
Pakistan(85)
United Kingdom(80)
Nigeria(78)


» Show all countries
Sort articles by: Volume | Date | Most Rates | Most Views | Reviews | Alphabet
1.

A study on the performance of differential search algorithm for single mode resource constrained project scheduling problem Pages 537-550 Right click to download the paper Download PDF

Authors: Nazanin Rahmani, Vahid Zeighami, Reza Akbari

DOI: 10.5267/j.dsl.2015.5.005

Keywords: Differential search algorithm, Resource constrained project scheduling problem, Single mode

Abstract:
Differential Search (DS) algorithm is a new meta-heuristic for solving real-valued numerical optimization. This paper introduces a new method based on DS for solving Resource Constrained Project Scheduling Problem (RCPSP). The RCPSP is aimed to schedule a set of activities at minimal duration subject to precedence constraints and the limited availability of resources. The proposed method is applied to PSPLIB case studies and its performance is evaluated in comparison with some of state of art methods. Experimental results show that the proposed method is effective. Also, it is among the best algorithms for solving RCPSP.
Details
  • 34
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: DSL | Year: 2015 | Volume: 4 | Issue: 4 | Views: 2547 | Reviews: 0

 

® 2010-2026 GrowingScience.Com