Processing, Please wait...

  • Home
  • About Us
  • Search:
  • Advanced Search

Growing Science » Tags cloud » Priority and Replacement

Journals

  • IJIEC (726)
  • MSL (2637)
  • DSL (649)
  • CCL (508)
  • USCM (1092)
  • ESM (413)
  • AC (562)
  • JPM (271)
  • IJDS (912)
  • JFS (91)
  • HE (26)
  • SCI (26)

Keywords

Supply chain management(166)
Jordan(161)
Vietnam(149)
Customer satisfaction(120)
Performance(113)
Supply chain(108)
Service quality(98)
Competitive advantage(95)
Tehran Stock Exchange(94)
SMEs(87)
optimization(85)
Financial performance(83)
Trust(81)
TOPSIS(80)
Job satisfaction(80)
Sustainability(79)
Factor analysis(78)
Social media(78)
Knowledge Management(77)
Artificial intelligence(76)


» Show all keywords

Authors

Naser Azad(82)
Mohammad Reza Iravani(64)
Zeplin Jiwa Husada Tarigan(61)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(39)
Jumadil Saputra(36)
Dmaithan Almajali(36)
Muhammad Turki Alshurideh(35)
Barween Al Kurdi(32)
Ahmad Makui(32)
Basrowi Basrowi(31)
Hassan Ghodrati(31)
Mohammad Khodaei Valahzaghard(30)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Sautma Ronni Basana(28)
Prasadja Ricardianto(28)
Haitham M. Alzoubi(27)


» Show all authors

Countries

Iran(2179)
Indonesia(1285)
Jordan(786)
India(785)
Vietnam(502)
Saudi Arabia(448)
Malaysia(439)
United Arab Emirates(220)
China(184)
Thailand(151)
United States(110)
Ukraine(104)
Turkey(103)
Egypt(98)
Canada(92)
Pakistan(85)
Peru(85)
Morocco(79)
United Kingdom(79)
Nigeria(78)


» Show all countries
Sort articles by: Volume | Date | Most Rates | Most Views | Reviews | Alphabet
1.

Reliability measures of a computer system with priority to PM over the H/W repair activities subject to MOT and MRT Pages 29-38 Right click to download the paper Download PDF

Authors: Ashish Kumar, S.C. Malik

Keywords: Computer System, Maximum Operation and Repair, Preventive Maintenance, Priority and Replacement, Reliability Measures, Times

Abstract:
This paper concentrates on the evaluation of reliability measures of a computer system of two-identical units having independent failure of h/w and s/w components. Initially one unit is operative and the other is kept as spare in cold standby. There is a single server visiting the system immediately whenever needed. The server conducts preventive maintenance of the unit after a maximum operation time. If server is unable to repair the h/w components in maximum repair time, then components in the unit are replaced immediately by new one. However, only replacement of the s/w components has been made at their failure. The priority is given to the preventive maintenance over repair activities of the h/w. The time to failure of the components follows negative exponential distribution whereas the distribution of preventive maintenance, repair and replacement time are taken as arbitrary. The expressions for some important reliability measures of system effectiveness have been derived using semi-Markov process and regenerative point technique. The graphical behavior of the results has also been shown for a particular case.
Details
  • 0
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: MSL | Year: 2015 | Volume: 5 | Issue: 1 | Views: 2233 | Reviews: 0

 

® 2010-2025 GrowingScience.Com