Processing, Please wait...

  • Publisher Home
  • Home
  • 🔙 Back
  • 📚 Journals
    • ⚙️ IJIEC - Industrial Engineering Computations
    • 🌐 IJDNS - Data and Network Science
    • 🧪 CCL - Current Chemistry Letters
    • 💹 AC - Accounting
    • 🎯 DSL - Decision Science Letters
    • 🚛 USCM - Uncertain Supply Chain Management
    • 🏗️ JPM - Journal of Project Management
    • 🏥 HE - Healthcare Engineering
    • 📈 SCI - Scientometrica
    • 🔩 ESM - Engineering Solid Mechanics
    • 🌿 JFS - Journal of Future Sustainability
    • 💼 MSL - Management Science Letters
  • 📝 Submit Article
  • 📊 Statistics
  • 📋 About
    • 📄 About Us
    • 📰 Blog
    • 📢 News
    • 📧 Contact
  • 📺 Tutorial
  • Search:
  • Advanced Search

Growing Science » Tags cloud » Multiproduct system

⭐ Highly Cited Articles

  • Jaya Algorithm
  • Rao Algorithm
  • TLBO Algorithm
  • ChatGPT and Blended Learning

Journals

  • IJIEC (840)
  • IJDS (1032)
  • DSL (759)
  • ESM (434)
  • CCL (563)
  • JPM (350)
  • AC (572)
  • JFS (101)
  • MSL (2658)
  • USCM (1104)
  • HE (52)
  • SCI (52)

🔑 Keywords

Jordan(175)
Supply chain management(172)
Vietnam(154)
Customer satisfaction(124)
Performance(117)
Supply chain(115)
Artificial intelligence(108)
Service quality(101)
Competitive advantage(100)
SMEs(95)
Tehran Stock Exchange(94)
Sustainability(93)
optimization(88)
Financial performance(86)
Trust(85)
TOPSIS(85)
Job satisfaction(81)
Genetic Algorithm(81)
Organizational performance(81)
Social media(80)


» Show all keywords

✍️ Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(70)
Mohammad Reza Iravani(65)
Endri Endri(45)
Hotlan Siagian(43)
Muhammad Alshurideh(42)
Dmaithan Almajali(39)
Jumadil Saputra(37)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Sautma Ronni Basana(33)
Barween Al Kurdi(32)
Basrowi Basrowi(31)
Mohammad Khodaei Valahzaghard(30)
Haitham M. Alzoubi(30)
Ni Nyoman Kerti Yasa(30)
Hassan Ghodrati(30)
Shankar Chakraborty(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Mahmoud Allahham(28)


» Show all authors

🌍 Countries

1. Algeria (52)
2. Angola (2)
3. Argentina (22)
4. Armenia (2)
5. Australia (52)
6. Austria (2)
7. Bahrain (26)
8. Bangladesh (58)
9. Belarus (4)
10. Belgium (3)
11. Benin (2)
12. Benin Republic (1)
13. Bhutan (1)
14. Bosnia and Herzegovina (1)
15. Botswana (9)
16. Brazil (40)
17. Brunei (1)
18. Bulgaria (1)
19. Burkina Faso (1)
20. Cameroon (1)
Total: 121 countries

Show all countries
Sort articles by: 📖 Volume | 📅 Date | ⭐ Most Rates | 👁️ Most Views | 🚀 Rising Stars | 🔗 Citations (Scopus) | 🔥 Hot Papers
1.

A hybrid delayed differentiation multiproduct EPQ model with scrap and end-products multi-shipment policy Pages 437-450 PDF Download PDF

Authors: Yuan-Shyi Peter Peter Chiu, Ya-Lei Lo, Tsu-Ming Yeh, Yunsen Wang, Hung-Yi Chen

doi 10.5267/j.ijiec.2022.11.002

🔑 Keywords: Hybrid EPQ model, Scrap, Delayed differentiation, Multiproduct system, Multi-shipment policy, Supply Chain Performance

Abstract:
The present work intends to optimize a hybrid delayed differentiation multiproduct economic production quantity-EPQ model with the scrap and end-products multi-shipment policy. Since the requirements of multi-goods have a standard part in common, our fabrication planning adopts a two-phase delayed differentiation strategy to make the standard components first and produce the finished multi-goods in the second phase. Implementing a partial subcontracting option (with the additional expense) for the standard parts helps us to expedite the required uptime in the first phase. A screening process identifies the faulty items that need to be removed to ensure the in-house production quality. A multi-shipment plan delivers the finished lot of end-products to clients in fixed time intervals. This study optimizes the overall operating expenses of this intra-supply chain system, including fabrication, delivery, and client stock holding, through our proposed modeling, formulation, and optimization procedure. In addition, this study gives a numerical demonstration of the obtained results’ applicability and usefulness to managerial decision-making.
Details
  • 17
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2023 | Volume: 14 | Issue: 2 | Views: 1431

 
2.

Replenishment-shipment decision for a multiproduct producer-client coordinated FPR model with postponement, rework and subcontracting Pages 213-226 PDF Download PDF

Authors: Yuan-Shyi Peter Chiu, Ting-Fang Yan, Yunsen Wang, Hui-Chi Wang

doi 10.5267/j.uscm.2022.10.005

🔑 Keywords: Postponement, Multiproduct system, Replenishment-shipment, Finite production rate, Rework, Subcontracting

Abstract:
This research constructs a mathematical scheme to explore replenishment-shipment decisions for a multiproduct producer-client coordinated finite production rate (FPR) model with the postponement, rework, and subcontracting plan. The considered multiple goods have a common component, and a batch FPR fabrication with postponement is planned to meet the annual multiproduct requirements. The first fabricating phase makes only the standard components needed for a batch and subcontracts a proportion of them (with additional cost) to expedite the process. In contrast, the second fabricating phase produces the finished multiple merchandise in sequence. The in-house rework processes with extra expense help retain the desirable quality. Each merchandise’s finished batch is transported to the clients in equal-sized numerous shipments. This study derives the optimal batch cycle length and transporting frequency by minimizing the overall fabricating-shipment expenses (including clients’ holding costs). This work offers a numerical example demonstrating various crucial system features influenced by the factors of subcontracting, postponement, rework, and transportation policies to facilitate managerial decision making in industries.
Details
  • 17
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: USCM | Year: 2023 | Volume: 11 | Issue: 1 | Views: 910

 
3.

Alternative fabrication scheme to study effects of rework of nonconforming products and delayed differentiation on a multiproduct supply-chain system Pages 235-248 PDF Download PDF

Authors: Yuan-Shyi Peter Chiu, Hong-Dar Lin, Mei-Fang Wu, Singa Wang Chiu

doi 10.5267/j.ijiec.2017.6.001

🔑 Keywords: Multiproduct system, Cleaner production, Rework of nonconforming items, Delay product differentiation, Two-machine scheme, Multi-delivery plan

Abstract:
This study uses an alternative fabrication scheme to study the effect of rework of nonconforming items and delayed differentiation on a multiproduct supply-chain system. Traditional economic production quantity model focuses on a single-product inventory system where all products made are assumed to be perfect quality and finished products are issued continuously. To increase machine utilization, lower quality costs in production, and reflect the real-world vendor-buyer integrated systems Chiu et al. (2016a) [Chiu, Y-S.P., Kuo, J-S., Chiu, S. W., Hsieh, Y-T. (2016a). Effect of delayed differentiation on a multiproduct vendor–buyer integrated inventory system with rework. Advances in Production Engineering & Management, 11(4), 333-344.] employed a single-machine two-stage production scheme to study the effects of rework and delayed differentiation on a multi-product supply-chain system. With the intention of further reducing fabrication cycle time, this study considers an alternative two-machine two-stage fabrication scheme to re-explore the problem in Chiu et al. (2016a). Machine one solely produces all common parts for multiple end products. Then, machine two fabricates the customized multiproduct using a common cycle time strategy. Through the use of mathematical modeling and analyses, the optimal production cycle length and distribution policy are derived. Numerical examples are provided to demonstrate practical usage of the research results, and show its significant benefit in reducing fabrication cycle time compared to that obtained from prior studies that used different schemes.

Details
  • 68
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2018 | Volume: 9 | Issue: 2 | Views: 2254

 

® 2010-2026 GrowingScience.Com