Processing, Please wait...

  • Home
  • About Us
  • Search:
  • Advanced Search

Growing Science » Tags cloud » Machine breakdown

Journals

  • IJIEC (747)
  • MSL (2643)
  • DSL (668)
  • CCL (508)
  • USCM (1092)
  • ESM (413)
  • AC (562)
  • JPM (271)
  • IJDS (912)
  • JFS (91)
  • HE (26)
  • SCI (26)

Keywords

Supply chain management(166)
Jordan(161)
Vietnam(149)
Customer satisfaction(120)
Performance(113)
Supply chain(110)
Service quality(98)
Competitive advantage(95)
Tehran Stock Exchange(94)
SMEs(87)
optimization(86)
Trust(83)
Financial performance(83)
Sustainability(81)
TOPSIS(81)
Job satisfaction(80)
Factor analysis(78)
Social media(78)
Genetic Algorithm(77)
Knowledge Management(77)


» Show all keywords

Authors

Naser Azad(82)
Mohammad Reza Iravani(64)
Zeplin Jiwa Husada Tarigan(62)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(39)
Jumadil Saputra(36)
Dmaithan Almajali(36)
Muhammad Turki Alshurideh(35)
Barween Al Kurdi(32)
Ahmad Makui(32)
Basrowi Basrowi(31)
Hassan Ghodrati(31)
Mohammad Khodaei Valahzaghard(30)
Sautma Ronni Basana(29)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)
Haitham M. Alzoubi(27)


» Show all authors

Countries

Iran(2181)
Indonesia(1289)
Jordan(786)
India(786)
Vietnam(504)
Saudi Arabia(452)
Malaysia(441)
United Arab Emirates(220)
China(206)
Thailand(153)
United States(110)
Turkey(106)
Ukraine(104)
Egypt(98)
Canada(92)
Peru(88)
Pakistan(85)
United Kingdom(80)
Morocco(79)
Nigeria(78)


» Show all countries
Sort articles by: Volume | Date | Most Rates | Most Views | Reviews | Alphabet
1.

Solving group scheduling problem in no-wait flexible flowshop with random machine breakdown Pages 157-168 Right click to download the paper Download PDF

Authors: A. Adressi, S. Tasouji Hassanpour, V. Azizi

DOI: 10.5267/j.dsl.2015.7.001

Keywords: Group Scheduling, Machine Breakdown, No-wait Flowshop, Sequence-dependent Setup Times

Abstract:
In this paper, group scheduling problem in no-wait flexible flowshop is considered by considering two stages with group sequence-dependent setup times and random breakdown of the machines. Genetic algorithm and simulated annealing based heuristics have been proposed to solve the problem. The primary objective of scheduling is to minimize the maximum completion time of the jobs for two classes of small and large scale problems. Computational results show that both GA and SA algorithms perform properly, but SA appeared to provide better results for both small and large scale problems.
Details
  • 51
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: DSL | Year: 2016 | Volume: 5 | Issue: 1 | Views: 2855 | Reviews: 0

 
2.

Volume flexible multi items inventory system with imprecise environment Pages 457-468 Right click to download the paper Download PDF

Authors: Surbhi Singhal, S.R. Singh

DOI: 10.5267/j.ijiec.2013.07.002

Keywords: Imprecise method, Machine breakdown, Multi items, Variable holding cost, Volume flexible

Abstract:
This paper addresses a multi items volume flexible system for time dependent decaying items with the concept of machine breakdown and imprecise environment. In this study, partially backlogged shortages have been discussed. All the costs are fuzzified with signed distance method. Numerical examples are given to illustrate the theoretical results and sensitivity analysis is given to validate the results for various parameters.
Details
  • 17
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2013 | Volume: 4 | Issue: 4 | Views: 2590 | Reviews: 0

 

® 2010-2026 GrowingScience.Com