Processing, Please wait...

  • Home
  • About Us
  • Search:
  • Advanced Search

Growing Science » Tags cloud » Lateness

Journals

  • IJIEC (777)
  • MSL (2643)
  • DSL (690)
  • CCL (528)
  • USCM (1092)
  • ESM (421)
  • AC (562)
  • JPM (293)
  • IJDS (952)
  • JFS (101)
  • HE (32)
  • SCI (26)

Keywords

Supply chain management(168)
Jordan(165)
Vietnam(151)
Customer satisfaction(120)
Performance(115)
Supply chain(112)
Service quality(98)
Competitive advantage(97)
Tehran Stock Exchange(94)
SMEs(89)
optimization(87)
Sustainability(86)
Artificial intelligence(85)
Financial performance(84)
Trust(83)
TOPSIS(83)
Job satisfaction(81)
Genetic Algorithm(78)
Factor analysis(78)
Social media(78)


» Show all keywords

Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(66)
Mohammad Reza Iravani(64)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(40)
Dmaithan Almajali(37)
Jumadil Saputra(36)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Barween Al Kurdi(32)
Sautma Ronni Basana(31)
Basrowi Basrowi(31)
Hassan Ghodrati(31)
Mohammad Khodaei Valahzaghard(30)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)
Haitham M. Alzoubi(28)


» Show all authors

Countries

Iran(2190)
Indonesia(1311)
Jordan(813)
India(793)
Vietnam(510)
Saudi Arabia(477)
Malaysia(444)
China(231)
United Arab Emirates(226)
Thailand(160)
United States(114)
Ukraine(110)
Turkey(110)
Egypt(105)
Peru(94)
Canada(92)
Morocco(86)
Pakistan(85)
United Kingdom(80)
Nigeria(78)


» Show all countries
Sort articles by: Volume | Date | Most Rates | Most Views | Reviews | Alphabet
1.

Simultaneous selection and scheduling with sequence-dependent setup times, lateness penalties, and machine availability constraint: Heuristic approaches Pages 147-160 Right click to download the paper Download PDF

Authors: Mohammad Hossein Zarei, Mehdi Davvari, Farhad Kolahan, Kuan Yew Wong

DOI: 10.5267/j.ijiec.2015.7.001

Keywords: Earliness, Job scheduling, Job selection, Lateness, Scatter search, Sequence-dependent setup time, Simulated annealing, Tardiness

Abstract:
Job selection and scheduling are among the most important decisions for production planning in today’s manufacturing systems. However, the studies that take into account both problems together are scarce. Given that such problems are strongly NP-hard, this paper presents an approach based on two heuristic algorithms for simultaneous job selection and scheduling. The objective is to select a subset of jobs and schedule them in such a way that the total net profit is maximized. The cost components considered include jobs & apos; processing costs and weighted earliness/tardiness penalties. Two heuristic algorithms; namely scatter search (SS) and simulated annealing (SA), were employed to solve the problem for single machine environments. The algorithms were applied to several examples of different sizes with sequence-dependent setup times. Computational results were compared in terms of quality of solutions and convergence speed. Both algorithms were found to be efficient in solving the problem. While SS could provide solutions with slightly higher quality for large size problems, SA could achieve solutions in a more reasonable computational time.
Details
  • 0
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2016 | Volume: 7 | Issue: 1 | Views: 2155 | Reviews: 0

 

® 2010-2026 GrowingScience.Com