How to cite this paper
Alfatihanti, A., Latief, Y & Kussumardianadewi, B. (2025). Risk analysis and investment feasibility for green retrofits in high-rise office buildings using the life cycle cost method.Management Science Letters , 15(1), 11-22.
Refrences
Anthopoulos, L. (2013). Using Classification and Roadmapping techniques for Smart City viability s realization. Elec-tronic Journal of e-Government, 11(2), 326-336.
Bahamid, R. A., Doh, S. I., Al-Sharafi, M. A., & Rahimi, A. R. (2020). Risk factors influencing the construction projects in Yemen from expert’s perspective. In IOP conference series: materials science and engineering (Vol. 712, No. 1, p. 012007). IOP Publishing.
BPS. (2022). STATISTIK INDONESIA 2022.
B2TKE, B. (2021). Laporan Akhir: BENCHMARKING SPECIFIC ENERGY CONSUMPTION DI BANGUNAN KOMER-SIAL. B2TKE– BPPT.
Climate Action Tracker. (2022). 2030 Emissions Gap: CAT projections and resulting emissions gap in meeting the 1.5°C Paris Agreement goal. November 2022.
Dewi, A. A. D. P., & Diputra, G. D. A. (2015). Analisis Kendala Dalam Penerapan Green Construction dan Strategi Untuk Mengatasinya. Laporan Akhir. Jurusan Teknik Sipil Fakultas Teknik Universitas Udayana.
Dixit, V. (2022). Risk assessment of different sourcing contract scenarios in project procurement. International Journal of Construction Management, 22(8), 1537-1549.
EBTKE, D. J. (2022). PELUNCURAN PETA JALAN EFISIENSI ENERGI DI SEKTOR BANGUNAN GEDUNG DAN KATA-LOG DESAIN NET ZERO ENERGY BUILDING (NZEB). https://simebtke.esdm.go.id/sinergi/page/content/54/peluncuran-peta-jalan-efisiensi-energi-di-sektor-bangunan-gedung-dan-katalog-desain-net-zero-energy-building-nzeb.
Finaka, A. W. (2021). Potensi Investasi Bangunan Hijau Ramah Lingkungan. https://indonesiabaik.id/infografis/potensi-investasi-bangunan-hijau-ramah-lingkungan.
Gunawan, B. (2012). Buku pedoman energi efisiensi untuk desain bangunan gedung di Indonesia. Energy Efficiency and Conservation Clearing House Indonesia.
Heralova, R. S. (2017). Life cycle costing as an important contribution to feasibility study in construction projects. Proce-dia engineering, 196, 565-570.
Hidayati, R. (2016). Evaluasi Pengelolaan Komunikasi Dalam Proses Penerbitan Izin Mendirikan Bangunan Berbasis Risk Pada Badan Pelayanan Terpadu Satu Pintu Di Provinsi DKI Jakarta. https://lib.ui.ac.id/m/detail.jsp?id=20433811&lokasi=lokal
Hu, M. (2023). An evaluation of the retrofit net zero building performances: life cycle energy, emissions and cost. Build-ing Research & Information, 51(2), 179-191.
Huo, T., Du, Q., Xu, L., Shi, Q., Cong, X., & Cai, W. (2023). Timetable and roadmap for achieving carbon peak and carbon neutrality of China's building sector. Energy, 274, 127330.
Hwang, B. G., Zhu, L., Wang, Y., & Cheong, X. (2017). Green building construction projects in Singapore: Cost premiums and cost performance. Project management journal, 48(4), 67-79.
Islam, H., Jollands, M., & Setunge, S. (2015). Life cycle assessment and life cycle cost implication of residential build-ings—A review. Renewable and sustainable energy reviews, 42, 129-140.
IPCC. (2022). Climate Change 2022: Mitigation of Climate Change. Contribution of Working Group III to the Sixth As-sessment Report of the Intergovernmental Panel on Climate Change. Cambridge University Press, Cambridge, UK and New York, NY, USA. doi: 10.1017/9781009157926.026
Kaiser, I. M., Bezerra, B. S., & Castro, L. I. S. (2013). Is the environmental policies procedures a barrier to development of inland navigation and port management? A case of study in Brazil. Transportation Research Part A: Policy and Prac-tice, 47, 78-86.
Kelly, J., Male, S., & Graham, D. (2014). Value management of construction projects. John Wiley & Sons.
Kementerian, ESDM. (2012). Energy Efficiency and Conservation Clearing House Indonesia. https://www.esdm.go.id/id/media-center/arsip-berita/peluncuran-energy-efficiency-and-conservation-clearing-house-indonesia-eecchi
Marszal, A. J., & Heiselberg, P. (2011). Life cycle cost analysis of a multi-storey residential Net Zero Energy Building in Denmark. Energy, 36(9), 5600-5609.
Nguyen, H. D., & Macchion, L. (2022). Exploring critical risk factors for Green Building projects in developing countries: The case of Vietnam. Journal of Cleaner Production, 381, 135138.
NIKOLAOS, A., & PANOS, D. (2019). Vulnerability of soil slopes against seismic damage based on the effect of spatial variability of soil properties on the development of permanent seismic displacements. The Eurasia Proceedings of Sci-ence Technology Engineering and Mathematics, 5, 43-49.
Nugroho, E. A., & Hidayat, F. (2012). Pengembang : Biaya Pembangunan Properti Hijau Lebih Mahal. https://www.beritasatu.com/ekonomi/57586/pengembang-biaya-pembangunan-properti-hijau-lebih-mahal
Osipova, E., & Eriksson, P. E. (2011). How procurement options influence risk management in construction projects. Con-struction management and economics, 29(11), 1149-1158.
Pham, D. H., Ly, D. H., Tran, N. K., Ahn, Y. H., & Jang, H. (2021). Developing a risk management process for general contractors in the bidding stage for design–build projects in Vietnam. Buildings, 11(11), 542.
Purbantoro, F., & Siregar, M. (2019). Design of net zero energy building (NZEB) for existing building in jakarta. In IOP Conference Series: Earth and Environmental Science (Vol. 399, No. 1, p. 012076). IOP Publishing.
Qin, X., Mo, Y., & Jing, L. (2016). Risk perceptions of the life-cycle of green buildings in China. Journal of cleaner pro-duction, 126, 148-158.
Simanjuntak, M. R., & Manik, R. B. H. (2019). Kajian Awal Sistem Manajemen Pengendalian Mutu dalam Meningkatkan Kinerja Waktu Proses Konstruksi Bangunan Gedung Tinggi Hunian di DKI Jakarta. Seminar Nasional Teknik Sipil IX 2019.
Senja, F. (2022). Inilah Gedung Ramah Lingkungan di Jakarta!. https://zonaebt.com/u/inilah-gedung-ramah-lingkungan-di-jakarta.
Suatan, M., Sompie, B. F., & Tarore, H. (2012). Analisis Resiko Pada Evaluasi Penawaran Penyedia Jasa Pekerjaan Kon-struksi. Jurnal Ilmiah Media Engineering, 2(3).
Sudjatmiko, B. (2005). Evaluasi kinerja penyusun dan penilai AMDAL: studi kasus komisi penilai AMDAL pusat. Jakar-ta: Program Pascasarjana Universitas Indonesia. https://lontar.ui.ac.id/detail?id=83155&lokasi=lokal
Ulibarri, N. (2018). Does collaboration affect the duration of environmental permitting processes?. Journal of Environ-mental Planning and Management, 61(4), 617-634.
Wafa, M. A. (2020). Pertumbuhan Gedung Bertingkat di Jakarta. https://www.vlix.id/foto/news/22910-pertumbuhan-gedung-bertingkat-di-jakarta.
World Bank Group. (2021). Climate Change Action Plan 2021-2025. www.worldbank.org
Wuni, I. Y., Shen, G. Q., & Antwi-Afari, M. F. (2023). Exploring the design risk factors for modular integrated construc-tion projects. Construction Innovation, 23(1), 213-228.
Yao, Y., & Li, J. (2022). Operational risk assessment of third-party payment platforms: a case study of China. Financial Innovation, 8(1), 19.
Bahamid, R. A., Doh, S. I., Al-Sharafi, M. A., & Rahimi, A. R. (2020). Risk factors influencing the construction projects in Yemen from expert’s perspective. In IOP conference series: materials science and engineering (Vol. 712, No. 1, p. 012007). IOP Publishing.
BPS. (2022). STATISTIK INDONESIA 2022.
B2TKE, B. (2021). Laporan Akhir: BENCHMARKING SPECIFIC ENERGY CONSUMPTION DI BANGUNAN KOMER-SIAL. B2TKE– BPPT.
Climate Action Tracker. (2022). 2030 Emissions Gap: CAT projections and resulting emissions gap in meeting the 1.5°C Paris Agreement goal. November 2022.
Dewi, A. A. D. P., & Diputra, G. D. A. (2015). Analisis Kendala Dalam Penerapan Green Construction dan Strategi Untuk Mengatasinya. Laporan Akhir. Jurusan Teknik Sipil Fakultas Teknik Universitas Udayana.
Dixit, V. (2022). Risk assessment of different sourcing contract scenarios in project procurement. International Journal of Construction Management, 22(8), 1537-1549.
EBTKE, D. J. (2022). PELUNCURAN PETA JALAN EFISIENSI ENERGI DI SEKTOR BANGUNAN GEDUNG DAN KATA-LOG DESAIN NET ZERO ENERGY BUILDING (NZEB). https://simebtke.esdm.go.id/sinergi/page/content/54/peluncuran-peta-jalan-efisiensi-energi-di-sektor-bangunan-gedung-dan-katalog-desain-net-zero-energy-building-nzeb.
Finaka, A. W. (2021). Potensi Investasi Bangunan Hijau Ramah Lingkungan. https://indonesiabaik.id/infografis/potensi-investasi-bangunan-hijau-ramah-lingkungan.
Gunawan, B. (2012). Buku pedoman energi efisiensi untuk desain bangunan gedung di Indonesia. Energy Efficiency and Conservation Clearing House Indonesia.
Heralova, R. S. (2017). Life cycle costing as an important contribution to feasibility study in construction projects. Proce-dia engineering, 196, 565-570.
Hidayati, R. (2016). Evaluasi Pengelolaan Komunikasi Dalam Proses Penerbitan Izin Mendirikan Bangunan Berbasis Risk Pada Badan Pelayanan Terpadu Satu Pintu Di Provinsi DKI Jakarta. https://lib.ui.ac.id/m/detail.jsp?id=20433811&lokasi=lokal
Hu, M. (2023). An evaluation of the retrofit net zero building performances: life cycle energy, emissions and cost. Build-ing Research & Information, 51(2), 179-191.
Huo, T., Du, Q., Xu, L., Shi, Q., Cong, X., & Cai, W. (2023). Timetable and roadmap for achieving carbon peak and carbon neutrality of China's building sector. Energy, 274, 127330.
Hwang, B. G., Zhu, L., Wang, Y., & Cheong, X. (2017). Green building construction projects in Singapore: Cost premiums and cost performance. Project management journal, 48(4), 67-79.
Islam, H., Jollands, M., & Setunge, S. (2015). Life cycle assessment and life cycle cost implication of residential build-ings—A review. Renewable and sustainable energy reviews, 42, 129-140.
IPCC. (2022). Climate Change 2022: Mitigation of Climate Change. Contribution of Working Group III to the Sixth As-sessment Report of the Intergovernmental Panel on Climate Change. Cambridge University Press, Cambridge, UK and New York, NY, USA. doi: 10.1017/9781009157926.026
Kaiser, I. M., Bezerra, B. S., & Castro, L. I. S. (2013). Is the environmental policies procedures a barrier to development of inland navigation and port management? A case of study in Brazil. Transportation Research Part A: Policy and Prac-tice, 47, 78-86.
Kelly, J., Male, S., & Graham, D. (2014). Value management of construction projects. John Wiley & Sons.
Kementerian, ESDM. (2012). Energy Efficiency and Conservation Clearing House Indonesia. https://www.esdm.go.id/id/media-center/arsip-berita/peluncuran-energy-efficiency-and-conservation-clearing-house-indonesia-eecchi
Marszal, A. J., & Heiselberg, P. (2011). Life cycle cost analysis of a multi-storey residential Net Zero Energy Building in Denmark. Energy, 36(9), 5600-5609.
Nguyen, H. D., & Macchion, L. (2022). Exploring critical risk factors for Green Building projects in developing countries: The case of Vietnam. Journal of Cleaner Production, 381, 135138.
NIKOLAOS, A., & PANOS, D. (2019). Vulnerability of soil slopes against seismic damage based on the effect of spatial variability of soil properties on the development of permanent seismic displacements. The Eurasia Proceedings of Sci-ence Technology Engineering and Mathematics, 5, 43-49.
Nugroho, E. A., & Hidayat, F. (2012). Pengembang : Biaya Pembangunan Properti Hijau Lebih Mahal. https://www.beritasatu.com/ekonomi/57586/pengembang-biaya-pembangunan-properti-hijau-lebih-mahal
Osipova, E., & Eriksson, P. E. (2011). How procurement options influence risk management in construction projects. Con-struction management and economics, 29(11), 1149-1158.
Pham, D. H., Ly, D. H., Tran, N. K., Ahn, Y. H., & Jang, H. (2021). Developing a risk management process for general contractors in the bidding stage for design–build projects in Vietnam. Buildings, 11(11), 542.
Purbantoro, F., & Siregar, M. (2019). Design of net zero energy building (NZEB) for existing building in jakarta. In IOP Conference Series: Earth and Environmental Science (Vol. 399, No. 1, p. 012076). IOP Publishing.
Qin, X., Mo, Y., & Jing, L. (2016). Risk perceptions of the life-cycle of green buildings in China. Journal of cleaner pro-duction, 126, 148-158.
Simanjuntak, M. R., & Manik, R. B. H. (2019). Kajian Awal Sistem Manajemen Pengendalian Mutu dalam Meningkatkan Kinerja Waktu Proses Konstruksi Bangunan Gedung Tinggi Hunian di DKI Jakarta. Seminar Nasional Teknik Sipil IX 2019.
Senja, F. (2022). Inilah Gedung Ramah Lingkungan di Jakarta!. https://zonaebt.com/u/inilah-gedung-ramah-lingkungan-di-jakarta.
Suatan, M., Sompie, B. F., & Tarore, H. (2012). Analisis Resiko Pada Evaluasi Penawaran Penyedia Jasa Pekerjaan Kon-struksi. Jurnal Ilmiah Media Engineering, 2(3).
Sudjatmiko, B. (2005). Evaluasi kinerja penyusun dan penilai AMDAL: studi kasus komisi penilai AMDAL pusat. Jakar-ta: Program Pascasarjana Universitas Indonesia. https://lontar.ui.ac.id/detail?id=83155&lokasi=lokal
Ulibarri, N. (2018). Does collaboration affect the duration of environmental permitting processes?. Journal of Environ-mental Planning and Management, 61(4), 617-634.
Wafa, M. A. (2020). Pertumbuhan Gedung Bertingkat di Jakarta. https://www.vlix.id/foto/news/22910-pertumbuhan-gedung-bertingkat-di-jakarta.
World Bank Group. (2021). Climate Change Action Plan 2021-2025. www.worldbank.org
Wuni, I. Y., Shen, G. Q., & Antwi-Afari, M. F. (2023). Exploring the design risk factors for modular integrated construc-tion projects. Construction Innovation, 23(1), 213-228.
Yao, Y., & Li, J. (2022). Operational risk assessment of third-party payment platforms: a case study of China. Financial Innovation, 8(1), 19.